You are on page 1of 4

125

00

N
0 B.O
00 20
0 .P. E
10 +5 LE.
E. +60
EL 00
.P. 277 BRID
B.O B.O
.P. E 00
E LE. GE
1
IDG +20
00
BR
PS1

PS4
0 "
Ø1

.
.V 00
"G
10 300
+5
E.
# EL
P. PS5
O.
B.

925
00
135
00

B.O
B.O
.P. E .P. E
LE. Ø1 LE.
+20
00
0"
+62
00
BRID
GE
2
PS16

90°

72
00
15°
45°
0
00
. +4
00 LE 3
63Ø .E GE
+ 8 .P ID
E. O
S1

B. BR 2000
1P 0"
L PS
1 9

.E
2
P
O.
B.
17
Ø1 4 PS
0" E
G
ID
BR

0
30
. +6
LE
.E
O.P
B.

0
50
91

5
E
I DG
BR

0
00
+4
L E. PS
28

.E
O .P
B.

Ø1
0"

0
00
84
00
+ 58
00
0 E.
3 EL
P. °
O.
90

B.
45°
6000

45°
39
PS

45°
45°

0
80
. +5
E LE E
6
0 P. DG
16
00 O. I
0B. BR
00
+6
E.
EL
P.
O.
B.
PE
00

TR
70

45° BR OLE
IDG UM
45°

E
B.O
Ø1
.P.
0" EL
E.
+9
00
0
37
00
0 41°
B.O
.P.
ELE
. +9

510
00
000

X 0"
P LE 0 0
Ø1
+5
OM E.
SC
L
00 .P .E
71 00 E
50 Ø1 LV B.O
E LE
.+ 0"
VA Ø1
0"
.P. 00
0
B.O 40
00
20

45°

77
00

B.O 11
.P. 20
0
EL
E.
+ 40
00

NOTES
Ø10
"

10" G.V. Ø10


"
#300

1- All dimensions are in MMs. 10" G.V.


#300

PROJECT
2- All lengths to be verified in the site. 31
0 0

10" IMPORT ELEC. TRACED ASPHALT


3- New lines Ø1
0"
LINE FROM JETTY 5 TO VALVES COMPLEX
4- Existing lines Ø1
0"
10" G.V.
ALEXANDRIA
#300
5- Tie-in points 10" G.V.
#300
PETROLEUM
B.O
.P.
EL
COMPANY
E.
+5
Operation conditions 00
TITLE DESIGNED BY

2 ISO. FOR 10" IMPORT ELEC. TRACED ASPHALT Eng. Mohammed Hamada
Operation pressure 18= Kg/Cm LINE FROM JETTY 5 TO VALVES COMPLEX
CHECKED BY
DRAWN BY : Eng. Mohammed Hamada Eng. Mahmoud Abdel Salam
Operation temperature 150= ºC SCALE N.T.S.

APPROVED BY : Eng. Ahmed Moustafa Hassan DATE 19/9/2020 REVISION (1) DWG.NO.
1/1
N

125
00
00 0 B.O
1 00 20 .P. E
+5 LE.
LE. +60
0
E 0
.P. 277 BRI
B.O B.O
.P. E 00 DGE
E L 1
IDG
E. +
200
BR 0
PS1

PS4
0"
Ø1

. 0
.V 50
"G +
10 300 E.
# EL
. P. PS5
O
B.

925
00
135
00

B.O
B.O
.P. E .P. E
LE. Ø1 LE.
+20
0 0
0"
+62
0 0
BRI
DGE
2
PS1
6

90°

72
00
15°
45°
0 0
+40
.
00 E LE 3
3 P. GE
+6 8
O. ID 0
E.
1
PS
R
L PS
19
B. B 200
.E
2
P
O.
B.
17
Ø1 PS
0"
FO
NOTES SEE R CO
DWG NT.
1- All dimensions are in MMs. 2/3
2- All lengths to be verified in the site.
3- New lines
PROJECT
4- Existing lines 10" IMPORT ELEC. TRACED ASPHALT
LINE FROM JETTY 5 TO VALVES COMPLEX
5- Tie-in points
ALEXANDRIA
PETROLEUM
Operation conditions COMPANY

2 TITLE DESIGNED BY
Operation pressure 18= Kg/Cm ISO. FOR 10" IMPORT ELEC. TRACED ASPHALT Eng. Mohammed Hamada
LINE FROM JETTY 5 TO VALVES COMPLEX
CHECKED BY
Operation temperature 150= ºC DRAWN BY : Eng. Mohammed Hamada SCALE N.T.S. Eng. Mahmoud Abdel Salam

APPROVED BY : Eng. Ahmed Moustafa Hassan DATE 19/9/2020 REVISION (1) DWG.NO.
1/3
N

FOR
SEE CONT.
DWG
1/3
Ø1
0"

4
GE
ID
BR

00
63
E .+
. EL
O .P
B.

5
GE
ID
BR

0
400
E .+ PS
28
L
P.E
O.
B.

Ø1
0"

0
00
84
8 00
. +5
00
30 LE
.E
O .P 90
°

B.
45°
6000

45°
39
PS

45°
45°

00
+ 58
LE. 6
.E E
O.
P DG
B. B RI

FO
SEE R CO
DWG NT.
3/3

NOTES
1- All dimensions are in MMs.
2- All lengths to be verified in the site.
3- New lines
PROJECT
4- Existing lines 10" IMPORT ELEC. TRACED ASPHALT
LINE FROM JETTY 5 TO VALVES COMPLEX
5- Tie-in points
ALEXANDRIA
PETROLEUM
Operation conditions COMPANY

2 TITLE DESIGNED BY
Operation pressure 18= Kg/Cm ISO. FOR 10" IMPORT ELEC. TRACED ASPHALT Eng. Mohammed Hamada
LINE FROM JETTY 5 TO VALVES COMPLEX
CHECKED BY
Operation temperature 150= ºC DRAWN BY : Eng. Mohammed Hamada SCALE N.T.S. Eng. Mahmoud Abdel Salam

APPROVED BY : Eng. Ahmed Moustafa Hassan DATE 19/9/2020 REVISION (1) DWG.NO.
2/3
FOR
SEE CONT.
DWG

LE
.+
60
0 0 2/3

6
N
P .E E
O. IDG
B. BR
PE

00
TR

70
45° BR OLE
IDG UM
45°

E
B.O
Ø1
.P.
0" EL
E.
+9
00
0
37
00
0 41°

B.O
.P.
ELE.

510
+90

00
00
L EX 0
Ø1
0"

O MP E.
+50

SC
L
00 .P .E
71
00
0
VE B.O
E .+
5 Ø1
0"
V AL
EL Ø1
0"
.P. 00
B.O
0
40
00
20

45°

77
00

B.O 11
.P. 20
0
EL
E.
+4
00
0
Ø1
0"

10" G.V. Ø1
0"
#300

10" G.V.
#300

00
31

NOTES Ø1
0"

1- All dimensions are in MMs.


10" G.V.
2- All lengths to be verified in the site. Ø1
0"
#300
3- New lines 10" G.V.
#300 PROJECT
B.O
4- Existing lines .P. 10" IMPORT ELEC. TRACED ASPHALT
EL LINE FROM JETTY 5 TO VALVES COMPLEX
5- Tie-in points E.
+5
00
ALEXANDRIA
PETROLEUM
Operation conditions COMPANY

2 TITLE DESIGNED BY
Operation pressure 18= Kg/Cm ISO. FOR 10" IMPORT ELEC. TRACED ASPHALT Eng. Mohammed Hamada
LINE FROM JETTY 5 TO VALVES COMPLEX
CHECKED BY
Operation temperature 150= ºC DRAWN BY : Eng. Mohammed Hamada SCALE N.T.S. Eng. Mahmoud Abdel Salam

APPROVED BY : Eng. Ahmed Moustafa Hassan DATE 19/9/2020 REVISION (1) DWG.NO.
3/3

You might also like