5 S: the steps to follow with my co-workers
Preparation
1st First of all, I sweep away the things that are of no use to me,
after asking myself if they can be re-used or recycled.
S If the answer is no, I get rid of them.
-2-
Preparation
Identify the team and the 5S workshop perimeter.
Define 5S workshop team and perimeter. The perimeter must be small enough to allow
the team to reach the 5th S in a short period of time (ideally 1S / week).
Assign a pilot, part of the team, in charge of leading the team in the implementation of the
methodology.
Assign a sponsor : he/she is someone from management, not belonging to the workshop
team, helping the team to progress in case of difficulties, providing a fresh view, and
validating each S.
Self-assess by the team against the ‘Questionnaire to reach 5th S’, chapter ‘Preparation’.
Get the validation of the achievement of all preparation activities by the sponsor to earn
your “ ticket ” to move on to the 1st S …
1 st
Preparation
S
-3-
1st S : Sweep away
Take snapshots to record the current level of cleanliness & tidiness (before situation).
Take each movable item (including items in cabinets, drawers) and ask yourself if it is
useful :
if it is useless, return it where it should be or get rid of it.
if it is useful, keep it.
if you are not sure, put an orange label on it and move it in the temporary quarantine
area.
Movable items are all items that are not belonging or fixed to the machine or
equipment (e.g. tools, measurement devices, folders, boxes, containers, furniture,
computers, …).
Take the orange label off as soon as the suspicious item is used, record the name of the
user and the date on the label that will be stored in a defined area within the quarantine
area.
At the end of the test period, decide together with your co-workers whether to keep or get
rid of the remaining labelled items.
1st 2nd
S S
-4-
2nd S : Sort
SEITON = SORT
Define a standard location for every item to reduce muda and efforts.
There should be a place for everything and everything should be in its place.
Analyse how an item should be handled and stored. Ask yourself why it takes so long to
find it.
Identify the area where they are stored (zoning, labels, snapshots etc …).
Self-assess by the team against the ‘Questionnaire to reach 5th S’, chapter ‘2nd S’.
Get the validation of the achievement of all ‘2nd S’ activities by the sponsor to earn your
“ ticket ” to move on to the 3rd S …
2nd 3rd
S S
-5-
3rd S : Spotless
SEISO = SPOTLESS
Divide the work area into cells. Assign a team member for each cell.
Decide what should be cleaned and in what order.
Define cleanliness criteria.
Select cleaning methods and equipment so that tools and hard-to-clean areas can be
dealt with quickly.
Make sure that everything in the work area has been cleaned.
Take snapshots to record the level of cleanliness & tidiness achieved (good situation).
Self-assess by the team against the ‘Questionnaire to reach 5th S’, chapter ‘3rd S’.
Get the validation of the achievement of all ‘3rd S’ activities by the sponsor to earn your
“ ticket ” to move on to the 4th S …
3rd 4th
S S
-6-
4th S : Standardize
SEIKETSU = STANDARDIZE
Define the standards that will enable the area to remain free
of unnecessary items, tidy, spotless and inspected.
Check that the 5S standards are consistent and match the need.
th
Self-assess by the team against the ‘Questionnaire to reach 5 S’, chapter ‘4th S’.
Get the validation of the achievement of all ‘4th S’ activities by the sponsor to earn your
“ ticket ” to move on to the 5th S …
4th 5th
S S
-7-
5th S: Sustain
SHITSUKE = SUSTAIN
Allocate time to the team and co-workers to maintain cleanliness and tidiness (e.g. at
the end of shift).
Make sure that all new comers are trained to the 5S standards.
Make sure that all workers of the area apply the 5S standards.
Organize regular audits against the ‘5th S’ check list page (at least monthly).
Self-assess by the team against the ‘Questionnaire to reach 5th S’ chapter ‘5th S’,
questions 5.1 to 5.3.
Get the validation of the Site / Plant VPS committee to close the workshop.
Organize regular audits against the ‘Questionnaire to maintain 5th S’ (at least monthly).
Start a new 5S loop whenever needed (e.g. after equipment transfer, hoshin
workshop, layout modification,…).
5th
S
-8-
Our implementation tips
Management involvement :
All members of the Plant Management Committee are trained to 5S.
Managers have understood that 5S may seem simple, but requires time and energy.
They have also understood that 5S is part of VPS foundations, as it prepares the field for
other VPS methodologies implementation.
All the members of the Plant Management Committee and all the Managers have to give
the example in terms of 5S respect in their day to day behaviour.
The Plant Management Committee should demonstrate its true belief in 5S by regularly
following the plant 5S deployment through genba review.
Pilots and sponsors should be provided short & flexibly scheduled training sessions on the
methodology and goals of the 5S.
Sponsors must be very demanding when awarding “ tickets ” to move from one S to the
next.
Make of 5S an objective during the annual appraisal for everybody in the Valeo
organisation.
-9-
Our implementation tips
Deployment :
The whole site must be mapped into areas based on the number of employees including all
non production areas, outside and public areas (restrooms, showers, …).
Those 5S areas must be small enough to be easily manageable in the day to day. They
should correspond to the real working area of the team.
OFFICES SHOPFLOOR
Color coding as per example here below (cf. template 5S deployment follow up ) :
- 10 -
Our implementation tips
Good practice of 5S communication area from CAM Nevers :
- 11 -
Our implementation tips
Visual identification of an area at 1st S :
- 12 -
Our implementation tips
Visual identification of an area at 2nd S :
- 13 -
Our implementation tips
Visual identification of an area at 3rd S :
- 14 -
Our implementation tips
Visual identification of an area at 4th S :
- 15 -
Our implementation tips
Visual identification of an area at 5th S :