You are on page 1of 38

ZUJ

1001563

PROJECT MANAGEMENT
based on PMBOK®, Sixth Edition

DR. ZAID AL -HAMAD


2020/2021- 02
DR. ZAID AL-HAMAD
PMP, PMBOK 6, Chapter 5

5.
PROJECT SCOPE
MANAGEMENT
‫إدارة نط ـ ـ ـ ـ ـ ــاق الـمشروع‬

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 2


PART

1
PART 1

A GUIDE TO THE PROJECT


MANAGEMENT BODY OF KNOWLEDGE
(PMBOK® Guide)

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 3


Contents
1 Introduction 8 Project Quality Management

2 The Environment in which Projects Operate 9 Project Resources Management

3 The Role of Project Manager 10 Project Communications Management

4 Project Integration Management 11 Project Risk Management

Knowledge Areas
5 Project Scope Management 12 Project Procurement Management

6 Project Schedule Management 13 Project Stakeholders Management

7 Project Cost Management

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 4


Definition 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


Project Scope Management includes the processes required 5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
to ensure that the project includes all the work required, and
5.3 Define Scope
only the work required, to complete the project successfully. 5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

،‫إدارة نطاق املشروع تشمل العمليات الالزمة للتأكد من أن املشروع يشمل مجيع األعمال املطلوبة‬
5.4 Create WBS
5.4.1 Inputs
5.4.2 Tools and Techniques

.‫ إلكمال املشروع بنجاح‬،‫األعمال املطلوبة فقط‬ 5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 5


Scope Management Processes 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1 Plan Scope Management 5.1.3 Outputs

5.2 Collect Requirements

Planning
5.2.1 Inputs
5.2 Collect Requirements 5.2.2 Tools and Techniques
5.2.3 Outputs
5.3 Define Scope 5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.4 Create WBS 5.3.3 Outputs

5.4 Create WBS


5.5 Validate Scope

M&C
5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs
5.6 Control Scope
5.5 Validate Scope
5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 6


Scope Divisions 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


In the project context, the term scope can refer to: 5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
Product scope 5.2.2 Tools and Techniques
5.2.3 Outputs
The features and functions that characterize a product, service, or result;
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

Project scope 5.4 Create WBS


5.4.1 Inputs
The work performed to deliver a product, service, or result with the specified features and 5.4.2 Tools and Techniques
5.4.3 Outputs
functions. The term project scope is sometimes viewed as including product scope.
5.5 Validate Scope
5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 7


P P P

OVERVIEW 5. PROJECT SCOPE


MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
Note the following: 5.1.2 Tools and Techniques
5.1.3 Outputs
 Processes belong only to 5.2 Collect Requirements
Planning and M&C process 5.2.1 Inputs
5.2.2 Tools and Techniques
groups 5.2.3 Outputs

 In all processes you can find: P 5.3 Define Scope

•“PMP” (inputs) M 5.3.1 Inputs


5.3.2 Tools and Techniques
5.3.3 Outputs

 In all planning processes you 5.4 Create WBS

can find: M 5.4.1 Inputs


5.4.2 Tools and Techniques
•“PMP”, “EEF”, “OPA” (inputs) 5.4.3 Outputs

•“Expert Judgement” (tools and 5.5 Validate Scope


techniques). 5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
 In most processes you can find: 5.6 Control Scope
•“Project Documents” (inputs) 5.6.1 Inputs
(PMBOK Guide — Sixth Edition 2017)
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 8


5. PROJECT SCOPE
MANAGEMENT

5.1
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

PLAN SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

MANAGEMENT
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

‫وضع خطة إدارة النطاق‬ 5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

Creating a scope management plan that documents how the 5.5 Validate Scope
5.5.1 Inputs
project scope will be defined, validated, and controlled. 5.5.2 Tools and Techniques

‫هي عملية وضع خطة إلدارة النطاق واليت توثق كيفية حتديد نطاق املشروع‬
5.5.3 Outputs

5.6 Control Scope

.‫واملنتج والتحقق منه وضبطه‬


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 9


5.1 Plan Scope Management 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 10


5.1 Plan Scope Management
Data Flow Diagram 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
resource
5.6 Control Scope
impact 5.6.1 Inputs
5.6.2 Tools and Techniques
(PMBOK Guide — Sixth Edition 2017) 5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 11


5. PROJECT SCOPE
MANAGEMENT

5.2
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

COLLECT
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

REQUIREMENTS
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

‫جتميع املتطلبات‬ 5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

process of determining, documenting, and managing 5.5 Validate Scope


5.5.1 Inputs
stakeholder needs and requirements to meet project objectives. 5.5.2 Tools and Techniques
5.5.3 Outputs

.‫عملية حتديد احتياجات املعنيني ومتطلباهتم وتوثيقها وإدارهتا لتحقيق أهداف املشروع‬ 5.6 Control Scope
5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 12


5.2 Collect Requirements 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 13


5.2 Collect Requirements
Data Flow Diagram 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
resource
5.6 Control Scope
impact 5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 14


5.2.2 Tools & Techniques 5. PROJECT SCOPE
MANAGEMENT

Collect Requirements 5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
Expert Decision Data Interpersonal & Context
Data Gathering Data Analysis Prototypes 5.2 Collect Requirements
Judgement Making Representation Team Skills Diagram 5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
Affinity Nominal Group
Brainstorming Voting 5.3 Define Scope
Diagrams Technique 5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
Observation/
Interviews Autocratic Mind Mapping 5.4 Create WBS
Conversation 5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs
Multi-criteria
Focus Groups Decision Facilitation 5.5 Validate Scope
5.5.1 Inputs
Analysis 5.5.2 Tools and Techniques
5.5.3 Outputs

Questionnaires 5.6 Control Scope


& Surveys 5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 Benchmarking PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 15


5.2.2 (2,5)
Brainstorming and Mind-Mapping 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
Brainstorming is a technique used to 5.1.2 Tools and Techniques
5.1.3 Outputs
generate and collect multiple ideas 5.2 Collect Requirements
related to project and product 5.2.1 Inputs
5.2.2 Tools and Techniques
requirements. 5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
Mind mapping. Mind mapping
5.4 Create WBS
consolidates ideas created through 5.4.1 Inputs
individual brainstorming sessions into 5.4.2 Tools and Techniques
5.4.3 Outputs
a single map to reflect commonality
5.5 Validate Scope
and differences in understanding and 5.5.1 Inputs
5.5.2 Tools and Techniques
to generate new ideas. 5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 16


5.2.2.7 Context Diagram 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


Context diagrams visually depict the 5.1.1 Inputs
5.1.2 Tools and Techniques
product scope by showing a business 5.1.3 Outputs

system (process, equipment, 5.2 Collect Requirements


5.2.1 Inputs
computer system, etc.), and how 5.2.2 Tools and Techniques
5.2.3 Outputs
people and other systems (actors)
5.3 Define Scope
interact with it. 5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 17


5.2.3.2 Outputs
Requirements Traceability Matrix 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
The requirements traceability 5.1.3 Outputs
matrix is a grid that links product 5.2 Collect Requirements
5.2.1 Inputs
requirements from their origin to 5.2.2 Tools and Techniques
5.2.3 Outputs
the deliverables that satisfy them.
5.3 Define Scope
 Links each requirement to the 5.3.1 Inputs
business and project objectives. 5.3.2 Tools and Techniques
5.3.3 Outputs

 Tracks requirements throughout the 5.4 Create WBS


5.4.1 Inputs
project life cycle. 5.4.2 Tools and Techniques
5.4.3 Outputs
 Provides a structure for managing
5.5 Validate Scope
changes to the product scope. 5.5.1 Inputs
5.5.2 Tools and Techniques
 Attributes associated with each 5.5.3 Outputs

requirement can be recorded 5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 18


5. PROJECT SCOPE
MANAGEMENT

5.3
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

DEFINE SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

‫حتديد النطاق‬
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
the process of developing a detailed description of the project 5.4.2 Tools and Techniques
5.4.3 Outputs
and product.
5.5 Validate Scope
5.5.1 Inputs

.‫عملية وضع وصف تفصيلي للمشروع واملنتج‬


5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 19


5.3 Define Scope 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 20


5.3 Define Scope
Data Flow Diagram 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
resource
5.6 Control Scope
impact 5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 21


5.3.1 Inputs 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


Scope management plan 5.1.1 Inputs
5.1.2 Tools and Techniques
a component of the PMP that establishes the activities for developing, monitoring, and 5.1.3 Outputs
controlling the project scope.
5.2 Collect Requirements
5.2.1 Inputs
Project charter 5.2.2 Tools and Techniques
5.2.3 Outputs
provides the high-level project description and product characteristics. It also contains
project approval requirements. 5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
Requirements documentation 5.3.3 Outputs

used to select the requirements that will be included in the project 5.4 Create WBS
5.4.1 Inputs
5.4.2 Tools and Techniques
Enterprise environmental factors 5.4.3 Outputs
Organization’s culture, Infrastructure, Personnel administration, and Marketplace 5.5 Validate Scope
conditions 5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
Organizational process assets
5.6 Control Scope
it can influence how scope is defined 5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 22


5.3.2 Tools & Techniques 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


Expert judgment 5.1.1 Inputs
to analyze the information needed to develop the project scope statement. It is provided by 5.1.2 Tools and Techniques
any group or individual with specialized knowledge or training (examples: Other units within 5.1.3 Outputs
the organization. Consultants. Stakeholders, including customers or sponsors. Professional 5.2 Collect Requirements
and technical associations) 5.2.1 Inputs
5.2.2 Tools and Techniques
Data Analysis 5.2.3 Outputs

alternatives analysis. 5.3 Define Scope


5.3.1 Inputs
Alternatives generation 5.3.2 Tools and Techniques
5.3.3 Outputs
develop as many potential options as possible in order to identify different approaches to
execute and perform the work 5.4 Create WBS
5.4.1 Inputs
5.4.2 Tools and Techniques
Interpersonal and Team Skills 5.4.3 Outputs
Facilitated workshops 5.5 Validate Scope
5.5.1 Inputs
Product analysis 5.5.2 Tools and Techniques
5.5.3 Outputs
used or projects that have a product as a deliverable
5.6 Control Scope
5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 23


Scope Orange 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


Project Scope Statement 5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
Project Charter
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
WBS (Work 5.3.2 Tools and Techniques
Breakdown 5.3.3 Outputs

Structure) 5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 24


5.3.3 Outputs Project Charter

 Project purpose
Project Scope Statement

 Project scope description


5. PROJECT SCOPE
MANAGEMENT

Project scope statement 5.1 Plan Scope Management


 Measurable project objectives and (progressively elaborated)
5.1.1 Inputs
 the description of the project scope, major related success criteria  Project deliverables 5.1.2 Tools and Techniques
deliverables, assumptions, and constraints. It  High-level requirements  Acceptance criteria 5.1.3 Outputs
provides:  High level project description,  Project exclusions
boundaries, and key deliverables 5.2 Collect Requirements
 Product scope description 5.2.1 Inputs
 Overall project risk
 Acceptance criteria. 5.2.2 Tools and Techniques
 Summary milestone schedule 5.2.3 Outputs
 Deliverable.  Preapproved financial resources
 Project exclusion.  Key stakeholder list 5.3 Define Scope
 Project approval requirements 5.3.1 Inputs
 Constraints. 5.3.2 Tools and Techniques
(i.e., what constitutes success,
 Assumptions. 5.3.3 Outputs
who decides the project is
 Project Scope Statement vs. Project Charter: The successful, who signs off on the 5.4 Create WBS
project charter contains high-level information, project) 5.4.1 Inputs
while the project scope statement contains a  Project exit criteria (i.e., what are 5.4.2 Tools and Techniques
detailed description of the scope elements. 5.4.3 Outputs
the conditions to be met in order
to close or to cancel the project or 5.5 Validate Scope
phase 5.5.1 Inputs
 Assigned project manager, 5.5.2 Tools and Techniques
Project documents updates responsibility, and authority level 5.5.3 Outputs
Assumption log, Requirements documentation, Table 5-1. Elements of the
 Name and authority of the
Requirements traceability matrix, Stakeholder register. sponsor or other person(s)
Project Charter and Project 5.6 Control Scope
5.6.1 Inputs
authorizing the project charter Scope Statement 5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 25


5.4 5. PROJECT SCOPE
MANAGEMENT

CREATE WBS
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

‫إعداد هيكل جتزئة العمل‬ 5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
Creating WBS (Work Breakdown Structure) is the process of subdividing project deliverables and 5.3 Define Scope
project work into smaller, more manageable components. 5.3.1 Inputs

.‫عملية تقسيم التسليمات الرئيسية للمشروع وأعمال املشروع إىل مكوانت أصغر وأكثر قابلية لإلدارة‬
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
The WBS structure can be represented in a number of forms, such as: 5.4.3 Outputs
◦ Using phases of the project life cycle as the second level of decomposition.
5.5 Validate Scope
◦ Using major deliverables as the second level of decomposition. 5.5.1 Inputs
◦ Contractual: Incorporating subcomponents which may be developed by organizations outside the project team, 5.5.2 Tools and Techniques
such as contracted work. 5.5.3 Outputs

The product and project deliverables are inserted at the third level, in the WBS, called WORK 5.6 Control Scope
5.6.1 Inputs
PACKAGES. 5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 26


5.4 Create WBS 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 27


5.4 Create WBS
Data Flow Diagram 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

resource 5.6 Control Scope


5.6.1 Inputs
impact 5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 28


5.4 WBS Example 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


Work Packages 5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 29


Example
(WBS for a House Project) 1.0 House
Construction

1.1.
1.2. Skeleton 1.3. Finishes
Foundations

1.3.1 Windows
1.1.1
1.2.1 Columns + Doors
Excavations
frames

1.1.2 frames 1.2.2 Slabs 1.3.2

1.2.3 External
1.1.3 concrete 1.3.3
walls

1.2.4 Internal
1.3.4
walls
4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 30
5.4.3 Outputs 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


Scope baseline 5.1.1 Inputs
5.1.2 Tools and Techniques
scope baseline is the approved version of: 5.1.3 Outputs

1. Scope statement, 5.2 Collect Requirements


5.2.1 Inputs
2. WBS, and 5.2.2 Tools and Techniques
3. WBS dictionary. 5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
Project documents updates 5.4 Create WBS
5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 31


5. PROJECT SCOPE
MANAGEMENT

5.5
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

VALIDATE SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

‫التحقق من النطاق‬
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
Validate Scope is the process of formalizing acceptance of the 5.4.2 Tools and Techniques
5.4.3 Outputs
completed project deliverables.
5.5 Validate Scope

.‫عملية إضفاء صفة رمسية على قبول تسليمات املشروع املكتملة‬


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 32


5.5 Validate Scope 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 33


5.5 Validate Scope
Data Flow Diagram 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
resource 5.6 Control Scope
5.6.1 Inputs
impact 5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 34


5. PROJECT SCOPE
MANAGEMENT

5.6
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

CONTROL SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

‫ضبط النطاق‬
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

Control Scope is the process of monitoring the status of the project and 5.4 Create WBS
5.4.1 Inputs
product scope and managing changes to the scope baseline. 5.4.2 Tools and Techniques
.‫عملية مراقبة حالة نطاقي املشروع واملنتج وإدارة التغيريات اليت تطرأ على اخلط املرجعي للنطاق‬ 5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
The uncontrolled expansion to product or project scope without 5.5.3 Outputs

adjustments to time, cost, and resources is referred to as scope creep. 5.6 Control Scope
.‫يشار إىل التوسع غري املتحكم به الذي يطرأ على نطاق منتج أو مشروع دون تعديالت يف الوقت والتكاليف واملوارد ابسم تسيب النطاق‬ 5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 35


5.6 Control Scope 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

5.6 Control Scope


5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 36


5.6 Control Scope
Data Flow Diagram 5. PROJECT SCOPE
MANAGEMENT

5.1 Plan Scope Management


5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs

5.2 Collect Requirements


5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs

5.3 Define Scope


5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs

5.4 Create WBS


5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs

5.5 Validate Scope


5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs

resource 5.6 Control Scope


5.6.1 Inputs
impact 5.6.2 Tools and Techniques
5.6.3 Outputs

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 37


Thank you!

4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 38

You might also like