Professional Documents
Culture Documents
1001563
PROJECT MANAGEMENT
based on PMBOK®, Sixth Edition
5.
PROJECT SCOPE
MANAGEMENT
إدارة نط ـ ـ ـ ـ ـ ــاق الـمشروع
1
PART 1
Knowledge Areas
5 Project Scope Management 12 Project Procurement Management
،إدارة نطاق املشروع تشمل العمليات الالزمة للتأكد من أن املشروع يشمل مجيع األعمال املطلوبة
5.4 Create WBS
5.4.1 Inputs
5.4.2 Tools and Techniques
Planning
5.2.1 Inputs
5.2 Collect Requirements 5.2.2 Tools and Techniques
5.2.3 Outputs
5.3 Define Scope 5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.4 Create WBS 5.3.3 Outputs
M&C
5.4.1 Inputs
5.4.2 Tools and Techniques
5.4.3 Outputs
5.6 Control Scope
5.5 Validate Scope
5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
5.1
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
PLAN SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
MANAGEMENT
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
Creating a scope management plan that documents how the 5.5 Validate Scope
5.5.1 Inputs
project scope will be defined, validated, and controlled. 5.5.2 Tools and Techniques
هي عملية وضع خطة إلدارة النطاق واليت توثق كيفية حتديد نطاق املشروع
5.5.3 Outputs
5.2
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
COLLECT
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
REQUIREMENTS
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
.عملية حتديد احتياجات املعنيني ومتطلباهتم وتوثيقها وإدارهتا لتحقيق أهداف املشروع 5.6 Control Scope
5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs
5.3
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
DEFINE SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
حتديد النطاق
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
used to select the requirements that will be included in the project 5.4 Create WBS
5.4.1 Inputs
5.4.2 Tools and Techniques
Enterprise environmental factors 5.4.3 Outputs
Organization’s culture, Infrastructure, Personnel administration, and Marketplace 5.5 Validate Scope
conditions 5.5.1 Inputs
5.5.2 Tools and Techniques
5.5.3 Outputs
Organizational process assets
5.6 Control Scope
it can influence how scope is defined 5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs
Project purpose
Project Scope Statement
CREATE WBS
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
.عملية تقسيم التسليمات الرئيسية للمشروع وأعمال املشروع إىل مكوانت أصغر وأكثر قابلية لإلدارة
5.3.2 Tools and Techniques
5.3.3 Outputs
The product and project deliverables are inserted at the third level, in the WBS, called WORK 5.6 Control Scope
5.6.1 Inputs
PACKAGES. 5.6.2 Tools and Techniques
5.6.3 Outputs
1.1.
1.2. Skeleton 1.3. Finishes
Foundations
1.3.1 Windows
1.1.1
1.2.1 Columns + Doors
Excavations
frames
1.2.3 External
1.1.3 concrete 1.3.3
walls
1.2.4 Internal
1.3.4
walls
4/29/2021 PROJECT MANAGEMENT (PMBOK 6)- ZAID AL-HAMAD 30
5.4.3 Outputs 5. PROJECT SCOPE
MANAGEMENT
5.5
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
VALIDATE SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
التحقق من النطاق
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
5.6
5.1 Plan Scope Management
5.1.1 Inputs
5.1.2 Tools and Techniques
5.1.3 Outputs
CONTROL SCOPE
5.2 Collect Requirements
5.2.1 Inputs
5.2.2 Tools and Techniques
5.2.3 Outputs
ضبط النطاق
5.3 Define Scope
5.3.1 Inputs
5.3.2 Tools and Techniques
5.3.3 Outputs
Control Scope is the process of monitoring the status of the project and 5.4 Create WBS
5.4.1 Inputs
product scope and managing changes to the scope baseline. 5.4.2 Tools and Techniques
.عملية مراقبة حالة نطاقي املشروع واملنتج وإدارة التغيريات اليت تطرأ على اخلط املرجعي للنطاق 5.4.3 Outputs
adjustments to time, cost, and resources is referred to as scope creep. 5.6 Control Scope
.يشار إىل التوسع غري املتحكم به الذي يطرأ على نطاق منتج أو مشروع دون تعديالت يف الوقت والتكاليف واملوارد ابسم تسيب النطاق 5.6.1 Inputs
5.6.2 Tools and Techniques
5.6.3 Outputs