Professional Documents
Culture Documents
3,136.00
4,704.00
784.00
784.00
1,568.00
1,568.00
4,704.00
1,176.00
1,568.00
2,744.00
784.00
784.00
392.00
4,704.00
6,664.00
784.00
784.00
6,272.00
7,840.00
784.00
784.00
4,704.00
6,272.00
784.00
784.00
784.00
4,704.00
7,056.00
784.00
784.00
784.00
6,272.00
8,624.00
784.00
784.00
6,272.00
7,840.00
784.00
784.00
784.00
1,568.00
3,920.00
7,840.00
2,352.00
784.00
3,920.00
4,704.00
1,568.00
1,568.00
3,136.00
3,920.00
3,136.00
3,136.00
784.00
784.00
1,568.00
1,568.00
4,704.00
784.00
4,704.00
784.00
6,272.00
784.00
784.00
784.00
1,568.00
3,136.00
7,056.00
784.00
784.00
784.00
3,136.00
5,488.00
784.00
784.00
784.00
3,136.00
5,488.00
784.00
784.00
784.00
3,136.00
5,488.00
784.00
784.00
784.00
3,136.00
5,488.00
784.00
784.00
784.00
3,136.00
5,488.00
784.00
784.00
4,704.00
6,272.00
3,136.00
392.00
392.00
784.00
3,136.00
4,704.00
3,136.00
2,352.00
784.00
392.00
392.00
3,136.00
4,704.00
3,528.00
784.00
3,136.00
3,920.00
784.00
784.00
5,488.00
7,056.00
784.00
2,352.00
3,136.00
1,568.00
3,920.00
392.00
784.00
392.00
3,136.00
4,704.00
784.00
784.00
3,528.00
5,096.00
784.00
784.00
3,920.00
5,488.00
784.00
784.00
784.00
2,352.00
4,704.00
3,136.00
3,528.00
784.00
784.00
1,568.00
EQUIPMENT CREWDAY COST
RESOURCE
ACTIVITY NO. DESCRIPTION UNIT UNIT COST COST
FACTOR
102 Z19 VIBRATING COMPACTOR EQUIP-DAYS 1 1,580.00 1,580.00
RESOURCE
ACTIVITY NO. DESCRIPTION UNIT UNIT COST COST
FACTOR
102 11/21 SURFACE COURSE CU.M. 1 450.00 450.00
12/22 BASE COURSE CU.M. 8 450.00 3,600.00
4,050.00
103 11/21 SURFACE COURSE CU.M. 20 450.00 9,000.00
12/22 BASE COURSE CU.M. 60 450.00 27,000.00
36,000.00
111 30 HOT MIX CU.M. 0.3 4,725.00 1,417.50
31 COLD MIX CU.M. 2.7 5,200.00 14,040.00
32 EMULSIFIED ASPHALT LITER 60 40.00 2,400.00
17,857.50
112 10/20 CRUSHED AGGREGATE CU.M. 0.5 331.00 165.50
13/23 UNCRUSHED AGGREGATE CU.M. 1.6 310.00 496.00
14/24 FINE AGGREGATES CU.M. 1.4 286.00 400.40
33 PENETRATION ASPHALT LITER 400 92.00 36,800.00
37,861.90
113 14/24 FINE AGGREGATES CU.M. 1 286.00 286.00
32 EMULSIFIED ASPHALT LITER 150 40.00 6,000.00
6,286.00
114 30 HOT MIX CU.M. 0.2 4,725.00 945.00
31 COLD MIX CU.M. 1.8 5,200.00 9,360.00
32 EMULSIFIED ASPHALT LITER 40 40.00 1,600.00
33 PENETRATION ASPHALT LITER 266 92.00 24,472.00
10/20 CRUSHED AGGREGATE CU.M. 1.7 331.00 562.70
13/23 UNCRUSHED AGGREGATE CU.M. 1.2 310.00 372.00
14/24 FINE AGGREGATES CU.M. 1.2 286.00 343.20
37,654.90
121 30 HOT MIX CU.M. 0.3 4,725.00 1,417.50
31 COLD MIX CU.M. 1.5 5,200.00 7,800.00
32 EMULSIFIED ASPHALT LITER 30 40.00 1,200.00
33 PENETRATION ASPHALT LITER 200 92.00 18,400.00
10/20 CRUSHED AGGREGATE CU.M. 0.1 331.00 33.10
13/23 UNCRUSHED AGGREGATE CU.M. 0.7 310.00 217.00
14/24 FINE AGGREGATES CU.M. 0.75 286.00 214.50
29,282.10
122 14/24 FINE AGGREGATES CU.M. 130 286.00 37,180.00
33 PENETRATION ASPHALT LITER 1 92.00 92.00
37,272.00
123 41 PORTLAND CEMENT BAG 10 240.00 2,400.00
13/23 UNCRUSHED AGGREGATE CU.M. 1.2 310.00 372.00
14/24 FINE AGGREGATES CU.M. 0.6 286.00 171.60
12/22 BASE COURSE CU.M. 0.5 450.00 225.00
3,168.60
132 11/21 SURFACE COURSE CU.M. 2 450.00 900.00
12/22 BASE COURSE CU.M. 3 450.00 1,350.00
15/25 BORROW CU.M. 4 320.00 1,280.00
3,530.00
144 13/23 UNCRUSHED AGGREGATE CU.M. 0.3 310.00 93.00
14/24 FINE AGGREGATES CU.M. 0.1 286.00 28.60
41 PORTLAND CEMENT BAG 1.6 240.00 384.00
51 R.C. PIPE CULVERTS PIECE 0.5 2,104.00 1,052.00
1,557.60
152 13/23 UNCRUSHED AGGREGATE CU.M. 0.25 310.00 77.50
14/24 FINE AGGREGATES CU.M. 0.15 286.00 42.90
41 PORTLAND CEMENT BAG 1.5 240.00 360.00
42 REINFOCING STEEL BARS KG. 4 33.00 132.00
612.40
153 41 PORTLAND CEMENT BAG 1 240.00 240.00
13/23 UNCRUSHED AGGREGATE CU.M. 0.15 310.00 46.50
14/24 FINE AGGREGATES CU.M. 0.15 286.00 42.90
16/26 BOULDERS CU.M. 0.3 650.00 195.00
524.40
154 41 PORTLAND CEMENT BAG 0.5 240.00 120.00
13/23 UNCRUSHED AGGREGATE CU.M. 0.3 310.00 93.00
16/26 BOULDERS CU.M. 0.3 650.00 195.00
64 BRIDGE PAINT LITER 3 462.50 1,387.50
1,795.50
155 61 BRIDGE LUMBER BD. FT. 100 75.00 7,500.00
64 BRIDGE PAINT LITER 0.2 462.50 92.50
16/26 BOULDERS CU.M. 0.15 650.00 97.50
41 PORTLAND CEMENT BAG 0.2 240.00 48.00
14/24 FINE AGGREGATES CU.M. 0.02 286.00 5.72
7,743.72
156 41 PORTLAND CEMENT BAG 0.2 240.00 48.00
14/24 FINE AGGREGATES CU.M. 0.05 286.00 14.30
16/26 BOULDERS CU.M. 0.2 650.00 130.00
61 BRIDGE LUMBER BD. FT. 130 75.00 9,750.00
9,942.30
161 81 SPARE PARTS EACH 0.1 340.00 34.00
82 FERRY LUMBER BD. FT. 2 158.00 316.00
83 FERRY PAINT LITER 0.2 231.00 46.20
396.20
171 12/22 BASE COURSE CU.M. 1.5 450.00 675.00
15/25 BORROW CU.M. 0.9 320.00 288.00
963.00
199 41 PORTLAND CEMENT BAG 0.4 240.00 96.00
51 R.C. PIPE CULVERTS PIECE 0.2 2,104.00 420.80
12/22 BASE COURSE CU.M. 10 450.00 4,500.00
5,016.80
202 13/23 UNCRUSHED AGGREGATE CU.M. 0.9 310.00 279.00
14/24 FINE AGGREGATES CU.M. 0.4 286.00 114.40
16/26 BOULDERS CU.M. 3.5 650.00 2,275.00
41 PORTLAND CEMENT BAG 7 240.00 1,680.00
4,348.40
203 13/23 UNCRUSHED AGGREGATE CU.M. 0.5 310.00 155.00
14/24 FINE AGGREGATES CU.M. 0.3 286.00 85.80
16/26 BOULDERS CU.M. 0.6 650.00 390.00
15/25 BORROW CU.M. 1.5 320.00 480.00
41 PORTLAND CEMENT BAG 1.5 240.00 360.00
42 REINFOCING STEEL BARS KG. 1 33.00 33.00
1,503.80
301 71 SIGN FACES EACH 0.4 5,825.00 2,330.00
72 SIGN POST EACH 0.5 2,688.00 1,344.00
75 TRAFFIC PAINT LITER 2 622.00 1,244.00
4,918.00
4,050.00
36,000.00
17,857.50
37,861.90
6,286.00
37,654.90
29,282.10
37,272.00
3,168.60
3,530.00
1,557.60
612.40
524.40
1,795.50
7,743.72
9,942.30
396.20
963.00
5,016.80
4,348.40
1,503.80
4,918.00
12,440.00
6,173.40
2,488.00
1,723.00
11,600.00
80,742.18
12,351.30
REGION ANNUAL MAINTENANCE WORK PROGR
PREPARED BY: MEO
PAMPANGA
DATE:
FEATURE PLANNED
WORK INVENTORY WORK
QTY
NO. ACTIVITIES CTRL.
STD
CATEG. QTY. UNIT QTY.
Replacement of Bituminous
114 var lane km. 30 0
Pavements
123 Replacement of Concrete Pavements var 0.0045 lane km. 0.3 0.00135
DATE: DATE:
PLANNED
AVE. CREW MAN- PERFORMANCE BUDGET (PESOS)
WORK CREW
DAILY DAYS DAYS
SIZE
UNIT PROD. REQD. REQD. LABOR EQUIPMENT MATERIALS
CL-m 70 0 * 4 0
cu.m. 80 0 6 0
CL-km 3 0 * 3.5 0
cu.m. 3 0 8.5 0
cu.m. 3.5 0 10 0
ltrs 150 0 8 0
sq.m. 80 0 9 0
cu.m. 3 0 11 0
man-days 6 0 6 0
AMWP-001
Sheet 1 of 5
TA_ 4.1
GET (PESOS)
TOTAL
CONTRACTUAL
& OTHER EXP.*
(16) (17)
=(13)+(14)+(15)+(16)
826.72
21,488.85
4.89
56.93
REGION ANNUAL MAINTENANCE WORK PR
PREPARED BY: MUNICIPAL ENGINEERING OFFIC
PAMPANGA
DATE:
FEATURE
WORK INVENTORY QTY
NO. ACTIVITIES CTRL.
STD
CATEG. QTY. UNIT
Selective Replacement of
66X proj. lane km. -
Concrete Pavement
Sub-Group Totals
Work Category No. 11
Regravelling
Sub-Group Totals
Work Category No. 12
Bridge and Structure
Maintenance
*Where Applicable
NNUAL MAINTENANCE WORK PROGRAM AND PERFORMANCE BUDGET - ROADS AND BRIDGES (TOTAL)
MUNICIPAL ENGINEERING OFFICE SUBMITTED BY: APPROVED BY
DATE: DATE:
PLANNED
AVE. CREW MAN- PERFORMANCE BUDGET (PESOS)
WORK CREW
DAILY DAYS DAYS
SIZE
QTY. UNIT PROD. REQD. REQD. LABOR EQUIPMENT
0 proj. 2.4 0 - 0
0 cu.m. 5 0* 7 0
0 man-days 0.75 0 6 0
0 man-days 25 0 4 0
*
0 crewdays 5 0* 2 0
0 crewdays 1 0 - 0
0 hrs 8 0 8 0
0 lane m. - 0 - 0
0 sq.m. - 0 - 0
0 proj - 0 - 0
0 CL-km - 0 - 0
0 sho.km. - 0 - 0
0 ln.m. 20 0* 8 0
TA_ 4.1
22,377.39
293.95 5,711.33
REGION ANNUAL MAINTENANCE WORK PROGRAM AND PERFORMANCE BUDGET -
PREPARED BY: SUBMITTED BY:
LGU
DATE: DATE:
FEATURE PLANNED
WORK INVENTORY WORK AVE. CREW
QTY CREW
NO. ACTIVITIES CTRL. DAILY DAYS
STD SIZE
CATEG. QTY. UNIT QTY. UNIT PROD. REQD.
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
=(4)x(6) =(7)/(9) =(10)x(11)
154 Repairs of Steel Bridges ltd ln.m. 0.15 0 no. 2 0 7
157 Clearing Bridge Waterways un-ltd 200 ln.m. 0.45 90 no. 100 0.9 7
Initial Response to Emergencies -
402 un-ltd no. 4 0 un-ltd 6.5 0 6.5
Bridges
41X Emergency Projects proj. CL-km 0.3 0 proj. 2.4 0 -
64X Replacing Timber Decks proj. ln.m. - 0 ln.m. - 0 -
0
0
0
0
20,632.43
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
=(4)x(6) =(7)/(9) =(10)x(11)
142 Manual Inlet/Outlet Cleaning un-ltd 6 no. 1.25 7.5 no. 8 0.9375 * 4
143 Culvert Line Cleaning ltd 3 no. 0.2 0.6 no. 3 0.2 * 4
Repair and/or Replacement of Minor
144 var no. 0.1 0 no. 2 0 6
Drainage Structure
Other Maintenance to Roadways and
199 var CL-km 2 0 man-days 6 0 6
Related Features
203 Repair of Major Roadside Structures ltd no. 1 0 no. 1.5 0 6
71X Special Maintenance proj. CL-km - 0 proj - 0 -
Sub-Group Totals
Work Category No. 17
Vegetation Control
201 Vegetation Control var 1.96 CL-km 600 1176 pass m. 300 3.92 * 4
Sub-Group Totals
Work Category No. 19
Erosion Control
Erosion Repair and Control to
202 ltd CL-km 1 0 cu.m. 3.5 0* 3
Roadsides
209 Other Roadside Maintenance var CL-km 0.5 0 man-days 4.5 0* 4.5
Sub-Group Totals
Work Category No. 18
Traffic Services Maintenance
301 Sign Maintenance un-ltd no. 0.5 0 no. 5 0* 5
*Where Applicable
AMWP-001
ORMANCE BUDGET - ROADS AND BRIDGES (TOTAL) Sheet 4 of 5
APPROVED BY
TA_ 4.1
DATE:
0
0
26,616.80
0
-
0
REGION ANNUAL MAINTENANCE WORK PROGRAM AND PERFORMANCE BUDGET - ROADS AND BRIDGES (TOTAL)
PREPARED BY: SUBMITTED BY: APPROVED BY
LGU
DATE: DATE: DATE:
FEATURE PLANNED
WORK AVE. CREW MAN- PERFORMANCE BUDGET (PESOS)
INVENTORY QTY WORK CREW
NO. ACTIVITIES CTRL. DAILY DAYS DAYS
STD SIZE
CATEG. QTY. UNIT QTY. UNIT PROD. REQD. REQD. LABOR EQUIPMENT
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
=(4)x(6) =(7)/(9) =(10)x(11)
302 Centerline and Lane Line Repainting ltd 0.74 lane Km 0.15 0.111 lane Km 0.75 0.148 9 1.332 1,044.29 388.80
304 Sight Distance Mowing and Clearing un-ltd CL-km 200 0 pass m. 140 0* 2 0
Sub-Group Totals
STANDARD ROUTINE
MAINTENANCE TOTAL
ACCOUNTING ADJUSTMENTS
RENT-FREE EQUIPMENT
REIMBURSEMENT FOR
EMERGENCIES
TOTAL OF ADJUSTMENTS
ACC. ADJ. ROUTINE
MAINTENANCE TOTAL
*Where Applicable
AMWP-001
GES (TOTAL) Sheet 5 of 5
TA_ 4.1
1,841.12 3,274.20
3,274.20
99,186.49
REGION ANNUAL MAINTENANCE WORK PRO
PREPARED BY:
LGU
DATE:
FEATURE PLANNED
WORK INVENTORY WORK
QTY
NO. ACTIVITIES CTRL.
STD
CATEG. UNIT QTY.
TOTAL - BRIDGES
*Where Applicable
NTENANCE WORK PROGRAM AND PERFORMANCE BUDGET - ROADS AND BRIDGES (TOTAL)
SUBMITTED BY: APPROVED BY
DATE: DATE:
PLANNED
AVE. CREW MAN- PERFORMANCE BUDGET (PESOS)
WORK CREW
DAILY DAYS DAYS
SIZE
UNIT PROD. REQD. REQD. LABOR EQUIPMENT MATERIALS
ln.m. 20 0* 8 0
no. 2 0 7 0
no. 2 0 7 0
no. 1 0 7 0
no. 1 0 7 0
no. 100 0 7 0
proj. 2.4 0 - 0
ln.m. - 0 - 0
no. - 0 - 0
proj - 0 - 0
hrs 8 0 8 0
AMWP-001
Sheet 5 of 5
TA_ 4.1
GET (PESOS)
TOTAL
CONTRACTUAL
& OTHER EXP.*
(16) (17)
=(13)+(14)+(15)+(16)
5,711.33
5,711.33
-
5,711.33