7s WIRELINE AND WELL TESTING PROCEDURES
7.1. GENERAL NOTE
7.2, SETTING AND TESTING OF DHSV - PULLING PROCEDURE
7.3. SETTING AND TESTING CANCO "" LocK WITH "AN
PLUG IN LANDING NIPPLE "WP 1"
7.4, SETTING AND TESTING BAKER "FWG-21" BLANKING
SEATING NIPPLE BAKER "F", IF THE PLUG IS SET
KILLING
BLANKING
PLUG IN
FOR WELL
7.8. SETTING AND TESTING CAMCO "A2" MODIFIED BLANKING PLUG IN
DHSV NIPPLE AND BPV IN THE TUBING HANGER WITH
PLUG NOT. INSTALLED
7.6. SETTING AND TESTING CAMCO “A2" MODIFIED BLANKING PLUG I!
DHSV NIPPLE AND BPV IN THE TUBING HANGER WITH
PLUG INSTALLED
7.7. OPEN SSD OR PUNCH TUBING TO CIRCULATE w
ESTABLISHING FLUID BARRIER
7.8. WELL TESTING PROCEDURES
LOGGING, BOTTOM HOLE SAHPLING
THE DEEP
THE DEEP
KOVER FLUID
PRESSURE RECORDING, PRODUCTION= 100 ~
721: GENERAL NOTE
1. The rig up equipment must include a hydraulic riser
gate valve capable of shearing the wireline cable and
a hydraulic controlled BoP.
2. Automatic master valve and DHSV should always be
disconnected from the Main Baker Safety Control Panel
and connected to an auxiliary operating system.
3. A fusible cap is fitted to the automatic master valve
actuator to close the valve in event of fires
4. When the DHSV is in place a fusible cap should be
fitted on the DHSV control line to close the valve in
case of fire.
If the DHSV has been removed the fusible cap should
not be installed on the DHSV control line:
Whenever the DHSV or the separation sleeve is not
installed in the DHSV nipple, pump hydraulic oil at a
slow rate through the 1/4" control line:
5. BOP should always be pressure tested, with rams
closed, before each job.
6. The wireline lubricator assembly = should be
hydraulically tested on each wireline trip or every
time a connection is broken.
The test pressure should be the maximum expected STHP
+ 1000 psi but not exceeding the X-mas tree working
pressure:
7. Always run the largest available gauge cutter prior to
run any wireline tool in the hole.- 101 ~
8. Whenever request to leave
close all the X-mas tree
master valve and the Di
ve
9. Before any operation, check
valves
well shut-in
the
the always
except lower
and make sure that all
equipment is H, S and CO, service.7325
= 102 -
SETTING AND TESTING OF DESV
1, Rig up wireline equipment +
as per general note.
ulic oil.
8. RIN to attached
of the running tool from the
Le
Retrive the runni:
Close DHSY bleeding off
7
Bleed pressure to
pressure holding of
Reopen DHSY accord:
PULLING PROCEDURE
2. RIH with JDC pulling tool
retrive the pulling
ed in the Camco operating manual.
rocedure spec- 103 ~
NOTE: Before pulling make sure that pressure is equalized
across DHSY,7:3. SETTING AND TESTING CAMCO "Ht
= 104
LOCK WITH “A" BLANKING PLUG
IN LANDING NIPPLE "wp-1"
This procedure should be followed to secure a live well
for example, with a risk of intersection with a drilling
well,
1. If the wellhead pressure is higher than 2000 psi
reduce the pressure as follow:
ja. Rig up cement pump to service wing valve on
production tree if not done previously. Pressure
test lines to 5000 psi for 15 minutes.
1b. Pump diesel or inhibited sea water down the
tubing bleeding gas until the surface pressure
reaches + 2000 psi.
2. Rig up wireline lubricator and retrieve DHSV
according to the pulling procedure.
3. Gauge string with 2.797" gauge cutter down the WP 1
Camco selective landing nipple.
4, Run and set Cameo M lock with A blanking plug in
landing nipple Cameo WP 1: Use 3" Cameo WC-1T-MA
running tool P.il, 15892.
5. Allow all gas above the plug to migrate to the
surface and bleed pressure to zero, Observe the well
in a stabilized condition for one hour. This will
insure testing the plug from below.
ell must be stable before continuing with next step:
SLE before continuing with next step:Tate
- 105 -
SETTING AND TESTING BAKER “FWG-21" BLANKING PLUG IN
SEATING NIPPLE BAKER "F";
This procedure should be followed to secure the well in
case of workover or in case of tubing leakage with
hydrocarbon annulus pressure.
1. If the well head pressure is higher than 2000 psi
reduce the pressure as follow:
ja. Rig up cement pump to service wing valve on
production tree if not done previously. Pressure
test lines to 5000 psi for 15 minutes.
ib. Pump diesel or inhibited sea water down the
tubing bleeding gas until the surface pressure
reaches + 2000 psi.
2. Rig up wireline lubricator and retrieve DHSV
according to the pulling procedure.
3. Gauge string with 2.63" gauge cutter down to F
Baker seating nipple.
4. Run and set FWG-21 blanking plug in F 2.56" Baker
seating nipple, according to the Baker procedure;
5. Bleed pressure to zero.
6. Allow all gas above the plug to migrate to the
surface.
Observe the well in a stabilized condition for one
hour.
This will insure testing the plug fron below.
Mell must be stable before continuing
step- 106 =
If_the plug is set for well killing
Fill tubing with treated brine and test plug from
above with 1500 psi for 15 minutes.
Bleed off the tubing pressure to zero.
Observe the well in a stabilized condition for one
hour.= 107 -
SETTING AND TESTING CAMCO "A2" MODIFIED BLANKING PLUG IN
DHSV NIPPLE AND BPV IN THE TUBING HANGER WITH THE DEEP
PLUG NOT INSTALLED:
This procedure should be followed in case of workover if
the deep plug (FWG-21 or A2) cannot be set and workover
fluid of sufficient density, to control the formation,
is already in the well and SSD is open or tubing
punched.
1. Rig up wireline lubricator on X-mas tree and
Pressure test same to 4000 psi for 15 minutes:
2. RIH with Camco "modified A2 blanking plug" and set
Same according to Cameo procedure in the DHSV
nipple.
3. Test plug from above to 2000 psi with annulus open
and observe for any possible return,
If formation can withstand test pressure, pressure
up annulus very slowly at 200 psi intervals,
monitoring for 5 minutes at each interval, to a
maximum of 1000 psi for 15 minutes.
This will insure a test on the plug from bel
5. Set BPV in the tubi:
% hanger.
6. Pump through the BPV until a pressure of 2000 psi is
reached:
Bleed off pressure above BPV and monitor pressure on
the control line. Hold the pressure for 15 minutes.
7. If the BPV is holding pressure from below, equalize
pressure across the BPVY, then depress ball valve
and bleed off all pressure above plug.— 108 -
SETTING AND TESTING CAMCO "A2" MODIFIED BLANKING PLUG IN
DHSV NIPPLE AND BPV IN THE TUBING HANGER WITH THE DEEP
PLUG INSTALLED:
The well is secured with a tested deep plug and workover
fluid of sufficient density to control the well: The SSD
open or tubing punched
1. Rig up the wireline lubricator with the blanking
plug or the DHSV. Pressure test as per general note:
2. RIH and set plug or DHSV in the DHSV nipple:
3. Pressure test the plug or DHSV from below to 2000
psi, appling pressure in the annulus through the open
circulating valve or through the punched tubing for
15 minutes:
4; Bleed off pressure to zero and test plug from above
to 2000 psi for 15 minutes.
NOTE: If DHSV is used it cannot be tested from above.
5: Set BPV in the tubing hanger:= 109 ~
OPEN SSD OR PUNCH TBG TO CIRCULATE WORKOVER FLUID
ESTABLISHING FLUID BARRIER:
The well is secured with a tested deep plug and the
tubing string is full of fluid.
1, Rig up wireline lubricator with shifting tool to
open the SSD. Pressure test lubricator at 4000 psi.
RIH and open the SSD, apply sufficient. pressure on
the tubing when opening to obtain an indication of
tubing to annulus communication taking into account
the differential pressure across the sleeve.
If unable to open SSD, rig up Schlumberger with
tubing puncher, 2 feet’ gun, 2 shoot per foot, 0°
phasing and charges color coded according to weight
of tubing.
RIH and perforate tbg at designated depth provided
in individual well procedure: Apply sufficient
pressure on the tubing when perforating’ to obtain an
indication of tubing to annulus communication:
Observe “perforating safety procedure" as stated in
paragraph 6.5.
3. Hook up pump to the annulus valve and displace the
fluid in the hole with workover fluid as per
individual well program. Maximum pumping pressure is
not to exceed 2000 psi: Dump old fluid (if
necessary) and circulate until weifht going in
equals weight coming outs
Make sure no hydrocarbons are dumped into the sea.NOTE:
- 110 -
If communication is suspected to exist high in the
well, pump around a dye solution to establish
circulation point and plug off the communication
to enable deep circulation or run coil tubing at
bottom and circulate:= ai. —
WELL TESTING PROCEDURE: PRESSURE RECORDING, PRODUCTION
LOGGING, BOTTOM HOLE SAMPLING:
This procedure will apply with permanent completion
installed.
The production test program (flowing and shut in time
period, sampling, production logging...) will be given
in the individual well testing program.
if the production. testis the. first. one.. after
completio:
All annuli valves of the well (13°/a"- 9°/a", 95a 7,
7a) mow teu el eleiteeed wih bateuncted pressure
gauges.
7-3 7/2" annulus pressure must be recorded with
pressure recorder.
Rig up cement pump to service wing valve on production
tree and 3°/2- 7" snindivs vanve (4f not done previusly).
Pressure test line to 5000 psi for 15 minutes.
Pressure up 7"- 37/2" annulus at S00 psi. During the
flow and shut in period observe the annulus. The
Pressure should be kept between S00 psi and 1000 psi.
Record bleeding or/and pumping fluid volume.+ Hie -
Always:
Whenever the burners will be use, the same must be
watched closely. Hydraulic master valve, automatic flow
line valve, and DHSV must be connected to the Main Baker
Safety Control Panel when well is flowing and not
wireline cable is in the hole.
All the safety systems, gas and fire detectors, must be
operative.
Wellhead pressure must be recorded with pressure
recorder.
1. Rig up wireline lubricator and retrieve the DHSV
according pull procedure;
2, If necessary, gauge string down to seating nipple
Baker R 2:56" with OD 2:50" gauge cutter, If
requested in the well testing program, check TPD
with gauge cutter OD 2.40",
Run and hang Baker RZB 2.56" instrument hanger with
shock absorber and pressure recorder(s) in seating
nipple Baker R 2.56";
(Use Baker soft release or C1 running tool).
4. Run, set and test DHSV as per standard DHSV run
procedure.
5. Flow the well through choke, flowing and shut in
Periods will be specified in the testing program.
6: Run in hole and pull the DISV.
7. Retrieve the pressure recorders with Baker RB pulling
tool and B probe according with Baker procedure.- 113 -
NOTE: If the well testing program asks for production
log recording:
- Check PTD with 2.40" gauge cutter. Rig down
slick line.
~ Rig up Schlumberger surface equipment (including
the riser gate valve) with PLT and pressure test
at 1000 psi above STHP.
8. Flow the well through choke as specified in the well
testing program: When the requested flow rate is
stabilized, run in hole PLT and record log as per
program.
If the effective flow rate is too high to RIM PLT,
reduce the rate to allow an easy run of the tool.
9. After recorded the log, POOH the tool.
IF THE TESTING PROGRAM ASKS FOR BOTTOM HOLE. SAMPL:
RE TLNG PROGRAM ASKS FOR BOTTOM HOLE SAMPLING
With mechanical samplers
ja. Change wireline equipment from Schlumberger cable to
slick line equipment:
2a. Set the clock to allow for running time and for
surface GOR to stabilize (flow at least one tubing
string capacity) before samples are collected.
Sa. Pressure test wireline equipment with samplers at
1000 psi above STHP:
4a. RIH samplers at required depth.- 114 -
Sa. After sampling time, POOH with samplers. The bubble
point pressure will be field checked. Normally, if
the bubble point pressure of the samples is not
within 60 psi the sampling will be repeated. At
least three samples are recommended.
Details will be included in the well testing
program:
6a. Run and set DHSV.
7a; Turn the well over to production department:
With electrical samplers
1b. Pressure test Schlumberger wireline equipment with
samplers at 1000 psi above STHP:
2b. RIH samplers at required depth.
Flow the well as specified in well testing program:
3b. When the GOR at surface is stabilized (flow at
least one tubing string capacity), collect the
samples.
4b. POOH with samplers: The bubble point pressure will
be field checked. Normally, if the bubble point
pressure of the samples is not within 80 psi the
sampling will be repeated.
At least three samples are raccomended: Details will
be included in the well testing program:
Sb. Run and set DHSV.
6b. Turn the well over to production department: