RAB PEMBUATAN KOLAM PALEM

NO URAIAN PEKERJAAN SATUAN VOLUME

A PEMBUATAN KOLAM
1 PAS. KOLAM IKAN & FILTRASI BETON COR m3 20.29
2 PAS.PALUDARIUM BETON COR & KACA m3 6.92
3 Pas Deck Bamboo (Bahan + Jasa Pas) m2 24.48
4 PAS. Batu Alam m2 10.35

B SPESIFIKASI KOLAM
1 Beton K225 sitemix 3 Roda
2 Waterproofing Upox+Sika+DamDex
3 Pipa Plumbing Set Rucika
4 WireMesh 8mm SNI 8 mm
5 Kaca Tamper Tamper 1cm
6 Decking Bamboo Proses fireproof 30yrs guarantee
7 Batu Alam Andesit
8 BIO Filter Lava Rock
9 Mekanis Filter Jap Mat + Nylon
10 Pompa Palud JPT Sunsun taiwan- 8rb Liter
11 Pompa Kolam Tsurumi japan- 16rb Liter
12 Lampu UV kolam koi 35w Aquanice 75
13 Aerator suplai oksigen LP 100 Resun LP 100
14 Aerator Instalasi Eheim
15 Lampu Under Water LED 12V DC
16 Lampu Palud Mayin LED RGB
17 Instalasi Kelistrikan Brocoo
18 Dekorasi set dan tema paludarium Riverscape plus ikan chiclid
M PALEM

HARGA SATUAN JUMLAH TOTAL

4,415,000 89,580,350
4,700,000 32,524,000
1,585,000 38,800,800
350,000 3,622,500
164,527,650

30yrs guarantee