E mol
" M/V TBN (Yacht Fiber) " Quotation
Prepared by ng. Mahmoud Hassan C fi {
L.O.A 40.00
Breadth : 14.00
Gross Tonnage:
Dry Dock
Dues Dock cleaning
First and last day
Subsequent days. per day
Remove /refit keel blocks. per one
02 — Services
02.010 Electric power
connection and disconnection 80
012 Electric power supply . per KW 04
fighting
watchmen, per man. per shift (7 hours ) 90
Line connection and disconnection 80
1023 Keep line under pressure . per day 20
02.030 Cooling water
031 Line connection and disconnection 80
<032 Supply . per day 58
02.040 Garbage removal
041 Garbage removal . per day 90
02.050 Crane services
081 Dock crane . per hour 100
02,060 Shore telephone -
4061 Callls. at cost
02.070 Gas free certificates
071 Initial. per position 225
072 Following - per position 120
02.080 Compressed air
081, Line connection and disconnection 80
082 Supply . per hour 30
02,090. Ballast water
091 Line connection and disconnection 80
092 Supply . per ton 06
02.100. Fresh water
101 Line connection and disconnection 80
102 Supply . per ton 6
02.110 Bottom plugs / scupper
‘IIL Remove / refit bottom plugs . per plug 28
112 Fit/ remove wooden scupper . per one 60
02.120 Disposal of oil water
121. Disposal of bilge water . per ton 50
(122 Line connection and
123 Pumping out . per ton
ark
isconnection 18002.130 Storage of fuel oil
TI3L_ Storage . per ton. Per day 28
02.140 Mud removal
Mud removal . per ton 28
Hull treatment
Preparation of su
‘Washing down by fresh water . per m* 0.80
HP Water jet (from 270 to 500 bar). per m* 2
Normal seraping . per m* 1.25
‘Sand sweep . per m? 5.00
Sand blast GR SA 1.0. per m? 8.00
Sand blast GR SA 2.0. per m? 9.00
Sand blast GR SA 2.5. per m* 10.00
‘Wash down oil stains by chemicals . per m? 12.00
Hull painting (all paints owner supply )
FIC. per coat . per m* 1
Repaint marks
Repaint ship name-IMO and home port side 250
Repaint draft-plimsoll marks /side 200
04 Subcontractor -
041 Ifowner will carrying out all works by owner, subcontractor our
Prices will Be 40 % ae
Zz