You are on page 1of 1

DOCUMENT NO.

: R/INST/006
PAGE : 01 OF 01
CALIBRATION FORM FOR Cl2 ISSUE NO. : 01
ANALYSER ISSUE DATE : 01/07/02
REVISION NO. : 01
REVISION DATE : 30.06.10

TAG NO. XIT421D / 421E UNIT 54


LOCATION DMF (UD5421N1 A/B/C) OUTLET /ACF OUTLET
PURPOSE 1. PM (OSM) 2. PM (SDM) 3. BM
NAME OF INSPECTOR DATE OF INSPECTION
MODEL FC400G MAKE YOKOGAWA
DETECTOR TYPE CONVERTER TYPE
MEASUREMENT
0 – 3 PPM LOOP DETAILS INDICATION / ALARM
RANGE
AMBIENT TEMP. o
C AMBIENT HUMIDITY %
ACCURACY
ANALYSER READING BEFORE MAINTENANCE PPM
1. INTERLOCK BYPASSED 2. CONTROLLER PUT IN MANUAL MODE
SAFETY MEASURES
3. ALARM OFF 4. PROCESS ISOLATION
REF. WI NO. WI/INST/006
CHECK POINTS
SEQUENCE PARAMETERS OBSERVATIONS REMARKS
BEFORE ZERO CHECK PPM
MAINTENANCE SPAN CHECK (REF. : PPM) PPM
LEAKAGE FROM MEAS. TANK,
SAMPLE LINE
MOUNTING STATUS ANY CORROSION, BREAKAGE
PRESENCE OF ANY NOISES
CONDITION OF ELECTRODES & CABLE
DIRTYNESS OF MEASURING TANK
CONDN. OF SLIP RING / BRUSH OF
ROTATING SHAFT
DETECTOR CHECK RESISTANCE BETWEEN SLIP RING &
BRUSH
Ohms
CONTAMINATION OF GOLD
ELECTRODE
CONTAMINATION OF CERAMIC BEADS
FRONT WINDOW & RUBBER
GASKET
LIQUID CRYSTAL OF DISPLAY
CONDITION OF CABLE &
CONVERTER CHECK
CONNECTION
Au – Ag ELECTRODE :
CABLE INSULATION RESISTANCE,
Au ELECTRODE – GND :
MOhms
Ag ELECTRODE – GND :
ZERO CHECK PPM
CALIBRATION AFTER
SPAN CHECK (REF. : PPM) PPM
MAINTENANCE
RESPONSE TIME FOR 90% sec.
RESTORATION FOR 1. INTERLOCK ON 2. CONTROLLER PUT IN AUTO
NORMAL WORKING 3. ALARM ON 4.
ANALYSER READING AFTER RESTORATION PPM
RESULT PASSED NOT PASSED
SIGNATURES
LEADER AREA IN-CHARGE DEPTT. IN-CHARGE

DATE DATE DATE

You might also like