PERENCANAAN SALURAN DRAINASE - CBD LIFESTYLE

Spesifikasi : Saluran Pipa Tertutup

I. Dimensi Saluran m II. Perhitungan Debit


Elevasi Slope Ukuran Land Cover Galian tanah Dimensi manhole Catchment Area Debit Prosen
Segmen Jarak EL. Top Jalan / Berm EL. Dasar Sal. Sal. PIPA Saluran (*) Keterangan No EL Tinggi Ca.A Total Ca.A q Q lapangan Q sal. Qlap/Qsal
(m) Up Down Up Down (m) Up Down (m3) dasar (m) (m 2) (m2) (l/det/ha) (m3/det.) (m3/det) (%)

Saluran Ruko
1-2 149.68 27.00 24.50 25.43 22.93 1.67% 1.00 0.50 0.50 379.82 1 25.23 1.78 13275.01 13275.01 120 0.159 1.61 10%
3-4 255.57 24.50 19.90 22.93 18.33 1.80% 1.00 0.50 0.50 648.52 3 22.73 1.78 6351.62 6351.62 120 0.076 1.67 5%
5-6 137.45 27.00 24.50 25.43 22.93 1.82% 1.00 0.50 0.50 348.79 5 25.23 1.78 17535.54 17535.54 120 0.210 1.68 13%
7-8 188.42 24.50 19.90 22.93 18.33 2.44% 1.00 0.50 0.50 478.12 7 22.73 1.78 14444.54 14444.54 120 0.173 1.95 9%
8 - 10 15.00 19.90 19.90 18.13 18.10 0.20% 1.20 0.50 0.53 48.63 crossing 8 17.93 1.98 - 14444.54 120 0.173 0.91 19%
9 - 10 225.37 24.50 19.90 23.43 18.83 2.04% 0.50 0.50 0.50 267.62 9 23.23 1.28 2274.98 2274.98 120 0.027 0.28 10%
10 - 4 19.22 19.90 19.90 18.13 18.07 0.30% 1.20 0.50 0.56 62.76 crossing 10 17.93 1.98 - 16719.52 120 0.201 1.11 18%
11 - 12 116.11 19.90 18.65 18.33 17.08 1.08% 1.00 0.50 0.50 294.62 3 18.13 1.78 8379.17 8379.17 120 0.101 1.29 8%
12 - 14 32.34 18.65 18.65 16.88 16.81 0.20% 1.20 0.50 0.56 105.77 crossing 8 16.68 1.98 - 8379.17 120 0.101 0.91 11%
13 - 14 107.85 19.90 18.65 18.33 17.08 1.16% 1.00 0.50 0.50 273.66 3 18.13 1.78 1851.29 1851.29 120 0.022 1.34 2%

15 - 16 143.29 27.00 27.00 25.43 25.28 0.10% 1.00 0.50 0.64 378.50 15 25.23 1.78 18519.10 18519.10 120 0.222 0.39 56%
17 - 18 143.06 27.00 27.00 25.43 25.28 0.10% 1.00 0.50 0.64 377.84 17 25.23 1.78 19064.09 19064.09 120 0.229 0.39 58%
19 - 20 281.13 27.00 20.40 25.28 18.83 2.30% 1.00 0.50 0.50 742.57 19 25.08 1.92 19033.18 37552.28 120 0.451 1.89 24%
20 - 25 13.40 20.40 20.40 18.63 18.60 0.20% 1.20 0.50 0.53 43.42 crossing 20 18.43 1.98 - 37552.28 120 0.451 0.91 50%
21 - 22 228.56 27.00 20.40 25.28 18.83 2.83% 1.00 0.50 0.50 603.66 21 25.08 1.92 14788.51 33852.59 120 0.406 2.10 19%
22 - 24 14.86 20.40 20.40 18.63 18.60 0.20% 1.20 0.50 0.53 48.16 crossing 22 18.43 1.98 - 33852.59 120 0.406 0.91 45%
23 - 24 198.32 23.60 20.40 22.53 19.33 1.61% 0.50 0.50 0.50 235.50 23 22.33 1.28 1967.98 1967.98 120 0.024 0.25 9%
24 - 25 17.75 20.40 20.40 18.60 18.56 0.20% 1.20 0.50 0.57 58.52 crossing 24 18.40 2.00 - 35820.57 120 0.430 0.91 47%
25' - 26 216.06 20.40 20.00 18.83 18.43 0.19% 1.00 0.50 0.50 548.25 25' 18.63 1.78 2764.82 2764.82 120 0.033 0.54 6%
27 - 28 212.48 20.40 20.00 18.83 18.43 0.19% 1.00 0.50 0.50 539.16 27 18.63 1.78 18324.94 18324.94 120 0.220 0.54 41%
28 - 26 27.82 20.00 20.00 18.23 18.17 0.20% 1.20 0.50 0.56 90.77 crossing 28 18.03 1.98 - 18324.94 120 0.220 0.91 24%
29 - 34 175.65 20.00 18.65 18.43 17.08 0.77% 1.00 0.50 0.50 445.72 27 18.23 1.78 2210.60 2210.60 120 0.027 1.09 2%
30 - 31 167.52 20.00 18.65 18.43 17.08 0.81% 1.00 0.50 0.50 425.09 27 18.23 1.78 24029.86 24029.86 120 0.288 1.12 26%
31 - 33 11.97 18.65 18.65 16.88 16.85 0.20% 1.20 0.50 0.52 38.76 crossing 28 16.68 1.98 - 24029.86 120 0.288 0.91 32%
32 - 33 63.30 19.20 18.65 18.13 17.58 0.87% 0.50 0.50 0.50 75.17 23 17.93 1.28 672.90 672.90 120 0.008 0.18 4%
33 - 34 13.56 18.65 18.65 16.85 16.82 0.20% 1.20 0.50 0.55 44.48 crossing 28 16.65 2.00 - 24702.76 120 0.296 0.91 32%

7,603.89

REKAPITULASI :
Satuan Panjang
A. Saluran Ruko
1 Saluran tertutup Pipa Beton-Non Crossing
Diameter 0.5 m m 487
Diameter 1.0 m m 2,523
2 Saluran tertutup Pipa Beton-Crossing
Diameter 1.2 m m 166

3 ManHole bh 30
4 Galian saluran tanah m3 7,604
5 Outlet ke saluran utama bh 5
PERENCANAAN SALURAN DRAINASE - CBD LIFESTYLE
Spesifikasi : Saluran Pipa Tertutup

I. Dimensi Saluran m
Elevasi Slope Ukuran Land Cover Galian tanah Dimensi manhole
Segmen Jarak EL. Top Jalan / Berm EL. Dasar Sal. Sal. PIPA Saluran (*) Keterangan No EL
(m) Up Down Up Down (m) Up Down (m3) dasar

Saluran Jalan CBD

1-2 32.46 20.40 20.40 18.63 18.56 0.20% 1.20 0.50 0.56 106.19 crossing 1 18.43
1-3 212.48 20.40 20.00 18.83 18.43 0.19% 1.00 0.50 0.50 539.16 - 18.63
4-5 49.44 20.10 20.00 19.03 18.93 0.20% 0.50 0.50 0.50 58.71 4 18.83
3-5 12.03 20.00 20.00 18.23 18.20 0.20% 1.20 0.50 0.52 38.93 crossing 3 18.03
5-6 15.79 20.00 20.00 18.20 18.17 0.20% 1.20 0.50 0.56 51.84 crossing 5 18.00
3-7 163.80 20.00 18.65 18.43 17.08 0.82% 1.00 0.50 0.50 415.63 - 18.23
7' - 7 21.33 18.65 18.65 17.08 17.03 0.20% 1.00 0.50 0.54 54.77 7' 16.88
7-9 13.20 18.65 18.65 16.88 16.85 0.20% 1.20 0.50 0.53 42.74 crossing 7 16.68
8-9 63.30 19.30 18.65 18.23 17.58 1.03% 0.50 0.50 0.50 75.17 8 18.03
9 - 10 15.73 18.65 18.65 16.85 16.62 1.47% 1.20 0.50 0.76 54.28 crossing 9 16.65

11 - 12 245.43 24.50 19.90 22.93 18.08 1.97% 1.00 0.50 0.75 666.44 11 22.73
13 - 14 220.24 24.50 19.90 23.43 18.83 2.09% 0.50 0.50 0.50 261.53 13 23.23
15 - 16 198.16 24.50 19.90 22.93 18.33 2.32% 1.00 0.50 0.50 502.83 15 22.73
16 - 14 12.35 19.90 19.90 18.13 18.10 0.20% 1.20 0.50 0.52 39.99 crossing 16 17.93
14 - 12 22.44 19.90 19.90 18.13 18.08 0.20% 1.20 0.50 0.54 73.02 crossing 14 17.93
16 - 17 123.78 19.90 18.65 18.33 16.95 1.11% 1.00 0.50 0.62 325.19 16 18.13
17 - 18 27.07 18.65 18.65 16.88 16.82 0.20% 1.20 0.50 0.55 88.29 crossing 17 16.68

1,449.00 3,394.74

REKAPITULASI :
Satuan Panjang
A. Saluran Jalan CBD
1 Saluran tertutup Pipa Beton-Non Crossing
Diameter 0.5 m m 333
Diameter 1.0 m m 965
2 Saluran tertutup Pipa Beton-Crossing
Diameter 1.2 m m 151

3 ManHole bh 18
4 Galian saluran tanah m3 3,395
5 Outlet ke saluran utama bh 5
II. Perhitungan Debit
Dimensi manhole Catchment Area Debit Prosen
Tinggi Ca.A Total Ca.A q Q lapangan Q sal. Qlap/Qsal
(m) (m2) (m2) (l/det/ha) (m3/det.) (m3/det) (%)

1.98 39,733 39733.38 120 0.477 0.91 53%


1.78 13825.08 13825.08 120 0.166 0.54 31%
1.28 525.17 525.17 120 0.006 0.09 7%
1.98 - 13825.08 120 0.166 0.91 18%
2.00 - 14350.25 120 0.172 0.90 19%
1.78 23675.73 23675.73 120 0.284 1.13 25%
1.78 7891.91 7891.91 120 0.095 0.56 17%
1.98 - 31567.63 120 0.379 0.91 42%
1.28 672.90 672.90 120 0.008 0.20 4%
2.00 - 32240.54 120 0.387 2.46 16%

1.78 19329.28 19329.28 120 0.232 1.75 13%


1.28 19761.17 19761.17 120 0.237 0.28 84%
1.78 14444.54 14444.54 120 0.173 1.90 9%
1.98 - 14444.54 120 0.173 0.91 19%
1.98 - 34205.71 120 0.410 0.91 45%
1.78 8379.17 8379.17 120 0.101 1.31 8%
1.98 - 8379.17 120 0.101 0.91 11%
PERENCANAAN SALURAN DRAINASE - CBD LIFESTYLE
Spesifikasi : Saluran Pipa Tertutup

I. Dimensi Saluran m
Elevasi Slope Ukuran Land Cover Galian tanah Dimensi manhole
Segmen Jarak EL. Top Jalan / Berm EL. Dasar Sal. Sal. PIPA Saluran (*) Keterangan No EL
(m) Up Down Up Down (m) Up Down (m3) dasar

Saluran Jalan CBD

1-2 32.46 20.40 20.40 18.63 18.56 0.20% 1.20 0.50 0.56 106.19 crossing 1 18.43
1-3 212.28 20.40 20.00 18.83 18.43 0.19% 1.00 0.50 0.50 538.67 - 18.63
1a - 5 213.52 20.10 20.00 19.03 18.71 0.15% 0.50 0.50 0.71 275.21 4 18.83
3-5 8.68 20.00 20.00 18.23 18.21 0.20% 1.20 0.50 0.52 28.06 crossing 3 18.03
5-6 20.52 20.00 20.00 18.21 18.17 0.20% 1.20 0.50 0.56 67.28 crossing 5 18.01
4-6 61.99 20.10 20.00 19.03 18.93 0.16% 0.50 0.50 0.50 73.61 4 18.83
3-7 162.44 20.00 18.70 18.43 17.13 0.80% 1.00 0.50 0.50 412.20 7' 18.23
8-7 22.77 18.70 18.70 17.13 17.08 0.20% 1.00 0.50 0.55 58.52 7' 16.93
5-9 170.61 20.00 18.70 18.93 17.63 0.76% 0.50 0.50 0.50 202.59 4 18.73
7-9 9.75 18.70 18.70 16.93 16.91 0.20% 1.20 0.50 0.52 31.51 crossing 7 16.73
9 - 10 20.82 18.70 18.70 16.91 16.86 0.20% 1.20 0.50 0.56 68.36 crossing 9 16.71

11 - 12 245.43 24.50 19.95 22.93 18.38 1.85% 1.00 0.50 0.50 622.77 11 22.73
13 - 14 331.22 24.50 18.70 23.43 17.63 1.75% 0.50 0.50 0.50 393.32 13 23.23
15 - 16 321.60 24.50 18.70 22.93 17.13 1.80% 1.00 0.50 0.50 816.05 15 22.73
16 - 14 8.90 18.70 18.70 16.93 16.91 0.20% 1.20 0.50 0.52 28.77 crossing 16 16.73
14 - 17 18.16 18.70 18.70 16.91 16.87 0.20% 1.20 0.50 0.55 59.52 crossing 14 16.71

1,861.14 3,782.64

REKAPITULASI :
Satuan Panjang
A. Saluran Jalan CBD
1 Saluran tertutup Pipa Beton-Non Crossing
Diameter 0.5 m m 777
Diameter 1.0 m m 965
2 Saluran tertutup Pipa Beton-Crossing
Diameter 1.2 m m 119

3 ManHole bh 15
4 Galian saluran tanah m3 3,783
5 Outlet ke saluran utama bh 5
II. Perhitungan Debit
Dimensi manhole Catchment Area Debit Prosen
Tinggi Ca.A Total Ca.A q Q lapangan Q sal. Qlap/Qsal
(m) (m2) (m2) (l/det/ha) (m3/det.) (m3/det) (%)

1.98 39,733 39733.38 120 0.477 0.91 53%


1.78 12186.56 12186.56 120 0.146 0.54 27%
1.28 525.17 525.17 120 0.006 0.08 8%
1.98 - 12186.56 120 0.146 0.91 16%
1.99 - 12711.73 120 0.153 0.90 17%
1.28 709.69 709.69 120 0.009 0.08 11%
1.78 22310.48 22310.48 120 0.268 1.12 24%
1.78 17486.19 17486.19 120 0.210 0.56 38%
1.28 3295.21 3295.21 120 0.040 0.17 23%
1.98 - 39796.67 120 0.478 0.91 53%
1.99 - 43091.88 120 0.517 0.90 58%

1.78 19045.33 19045.33 120 0.229 1.70 13%


1.28 4463.37 4463.37 120 0.054 0.26 21%
1.78 21695.58 21695.58 120 0.260 1.67 16%
1.98 - 21695.58 120 0.260 0.91 29%
1.99 - 26158.96 120 0.314 0.91 34%
PERENCANAAN SALURAN DRAINASE - CBD LIFESTYLE
Spesifikasi : Saluran Pipa Tertutup

I. Dimensi Saluran m
Elevasi Slope Ukuran Land Cover Galian tanah Dimensi manhole
Segmen Jarak EL. Top Jalan / Berm EL. Dasar Sal. Sal. PIPA Saluran (*) Keterangan No EL
(m) Up Down Up Down (m) Up Down (m3) dasar

Saluran Jalan CBD

1-3 33.72 20.40 20.40 18.63 18.56 0.20% 1.20 0.50 0.57 110.35 crossing 1 18.43
1-4 210.73 20.40 20.00 18.83 18.43 0.19% 1.00 0.50 0.50 534.72 1 18.63
2-5 211.97 20.10 20.00 19.03 18.71 0.15% 0.50 0.50 0.71 273.06 2 18.83
4-5 8.68 20.00 20.00 18.23 18.21 0.20% 1.20 0.50 0.52 28.06 crossing 4 18.03
5-6 14.38 20.00 20.00 18.21 18.18 0.16% 1.20 0.50 0.54 46.94 crossing 5 18.01
4-7 162.53 20.00 18.70 18.43 17.13 0.80% 1.00 0.50 0.50 412.42 4 18.23
8-7 22.25 18.70 18.70 17.13 17.08 0.20% 1.00 0.50 0.54 57.17 8 16.93
5-9 170.16 20.00 18.70 18.93 17.63 0.76% 0.50 0.50 0.50 202.07 5 18.73
7-9 9.28 18.70 18.70 16.93 16.91 0.20% 1.20 0.50 0.52 29.99 crossing 7 16.73
9 - 10 14.85 18.70 18.70 16.91 16.88 0.20% 1.20 0.50 0.55 48.60 crossing 9 16.71

11 - 12 200.64 24.50 19.95 22.93 18.38 2.27% 1.00 0.50 0.50 509.12 11 22.73
13 - 14 329.68 24.50 18.70 23.43 17.63 1.76% 0.50 0.50 0.50 391.49 13 23.23
15 - 16 317.36 24.50 18.70 22.93 17.13 1.83% 1.00 0.50 0.50 805.30 15 22.73
16 - 14 8.40 18.70 18.70 16.93 16.91 0.20% 1.20 0.50 0.52 27.14 crossing 16 16.73
14 - 17 13.80 18.70 18.70 16.91 16.88 0.18% 1.20 0.50 0.54 45.06 crossing 14 16.71

1,728.42 3,521.50

REKAPITULASI :
Satuan Panjang
A. Saluran Jalan CBD
1 Saluran tertutup Pipa Beton-Non Crossing
Ø 0.5 m m 712
Ø 1.0 m m 914
2 Saluran tertutup Pipa Beton-Crossing
Ø 1.2 m m 103

3 ManHole bh 12
4 Galian saluran tanah m3 3,522
5 Outlet ke saluran utama bh 5
II. Perhitungan Debit
Dimensi manhole Catchment Area Debit Prosen
Tinggi Ca.A Total Ca.A q Q lapangan Q sal. Qlap/Qsal
(m) (m2) (m2) (l/det/ha) (m3/det.) (m3/det) (%)

1.98 39,733 39733.38 120 0.477 0.91 53%


1.78 12186.56 12186.56 120 0.146 0.54 27%
1.28 525.17 525.17 120 0.006 0.08 8%
1.98 - 12186.56 120 0.146 0.91 16%
1.99 - 12711.73 120 0.153 0.81 19%
1.78 22310.48 22310.48 120 0.268 1.12 24%
1.78 17486.19 17486.19 120 0.210 0.56 38%
1.28 3295.21 3295.21 120 0.040 0.17 23%
1.98 - 39796.67 120 0.478 0.91 53%
1.99 - 43091.88 120 0.517 0.90 58%

1.78 19045.33 19045.33 120 0.229 1.88 12%


1.28 4463.37 4463.37 120 0.054 0.26 21%
1.78 21695.58 21695.58 120 0.260 1.69 15%
1.98 - 21695.58 120 0.260 0.91 29%
1.99 - 26158.96 120 0.314 0.86 37%
PERENCANAAN SALURAN DRAINASE - CBD LIFESTYLE
Spesifikasi : Saluran Pipa Tertutup 0.40 19.709

21.20 2.38 21.2


I. Dimensi Saluran m
Elevasi Slope Ukuran Land Cover Galian tanah Dimensi manhole
Segmen Jarak EL. Top Jalan / Berm EL. Dasar Sal. Sal. PIPA Saluran (*) Keterangan No EL
(m) Up Down Up Down (m) Up Down (m3) dasar

Saluran Jalan CBD

1-2 9.65 20.40 20.40 18.63 18.61 0.20% 1.20 0.50 0.52 31.21 crossing 1 18.43
2-3 22.56 20.40 20.40 18.61 18.56 0.20% 1.20 0.52 0.56 74.16 crossing 2 18.41
1-4 209.73 20.40 20.00 18.83 18.43 0.19% 1.00 0.50 0.50 532.19 1 18.63
2-5 210.97 20.40 20.00 19.33 18.93 0.19% 0.50 0.50 0.50 250.53 2 19.13
4-5 7.68 20.00 20.00 18.23 18.21 0.20% 1.20 0.50 0.52 24.81 crossing 4 18.03
5-6 13.88 20.00 20.00 18.21 18.19 0.17% 1.20 0.50 0.54 45.28 crossing 5 18.01
4-7 161.53 20.00 18.70 18.43 17.13 0.80% 1.00 0.50 0.50 409.87 4 18.23
8-7 18.50 18.70 18.70 17.13 17.09 0.20% 1.00 0.50 0.54 47.44 8 16.93
5-9 169.16 20.00 18.70 18.93 17.63 0.77% 0.50 0.50 0.50 200.88 5 18.73
7-9 8.28 18.70 18.70 16.93 16.91 0.20% 1.20 0.50 0.52 26.75 crossing 7 16.73
9 - 10 14.35 18.70 18.70 16.91 16.88 0.20% 1.20 0.50 0.55 46.92 crossing 9 16.71

11 - 11' 190.08 24.50 20.00 22.93 18.43 2.37% 1.00 0.50 0.50 482.32 11 22.73
13 - 13' 161.29 24.50 20.00 23.43 18.93 2.79% 0.50 0.50 0.50 191.53 13 23.23
15 - 15' 150.06 24.50 20.00 22.93 18.43 3.00% 1.00 0.50 0.50 380.78 15 22.73
15' - 13' 7.46 20.00 20.00 18.23 18.21 0.20% 1.20 0.50 0.51 24.11 crossing 15' 18.03
13' - 11' 14.18 20.00 20.00 18.21 18.19 0.14% 1.20 0.50 0.54 46.22 crossing 13' 18.01
11' - 12 9.61 20.00 19.98 17.55 17.50 0.52% 1.20 0.50 1.21 41.87 11' 17.35
15" - 16 158.41 20.00 18.70 18.43 17.13 0.82% 1.00 0.50 0.50 401.96 15" 18.23
13" - 14 159.02 20.00 18.70 18.93 17.63 0.82% 0.50 0.50 0.50 188.84 13" 18.73
16 - 14 7.40 18.70 18.70 16.93 16.91 0.20% 1.20 0.50 0.51 23.90 crossing 16 16.73
14 - 17 13.30 18.70 18.70 16.91 16.89 0.19% 1.20 0.50 0.54 43.39 crossing 14 16.71

1,717.12 3,514.96

REKAPITULASI :
Satuan Panjang
A. Saluran Jalan CBD
1 Saluran tertutup Pipa Beton-Non Crossing
Ø 0.5 m m 700
Ø 1.0 m m 888
2 Saluran tertutup Pipa Beton-Crossing
Ø 1.2 m m 128

3 ManHole bh 17
4 Galian saluran tanah m3 3,515
5 Outlet ke saluran utama bh 5
1.491

2.58
II. Perhitungan Debit
Dimensi manhole Catchment Area Debit Prosen
Tinggi Ca.A Total Ca.A q Q lapangan Q sal. Qlap/Qsal
(m) (m2) (m2) (l/det/ha) (m3/det.) (m3/det) (%)

1.98 39,733 39733.38 120 0.477 0.91 53%


1.99 - 39733.38 120 0.477 0.91 53%
1.78 12186.56 12186.56 120 0.146 0.54 27%
1.28 525.17 525.17 120 0.006 0.09 7%
1.98 - 12186.56 120 0.146 0.91 16%
1.99 - 12711.73 120 0.153 0.83 18%
1.78 22310.48 22310.48 120 0.268 1.12 24%
1.78 17486.19 17486.19 120 0.210 0.56 38%
1.28 3295.21 3295.21 120 0.040 0.17 23%
1.98 - 39796.67 120 0.478 0.91 53%
1.99 - 43091.88 120 0.517 0.92 56%

1.78 4213.26 4213.26 120 0.051 1.92 3%


1.28 1838.89 1838.89 120 0.022 0.33 7%
1.78 10360.92 10360.92 120 0.124 2.16 6%
1.98 - 10360.92 120 0.124 0.91 14%
1.99 - 12199.81 120 0.146 0.77 19%
2.65 500.54 16913.61 120 0.203 1.46 14%
1.78 11640.69 11640.69 120 0.140 1.13 12%
1.28 2321.97 2321.97 120 0.028 0.18 16%
1.98 - 11640.69 120 0.140 0.91 15%
1.99 - 13962.66 120 0.168 0.88 19%