Detailed Project Report
of
M/s Eastern Fuels
Installed unit at:
Plot No. 19
Barhi Industrial Area
Hazaribagh
For EASTERN FUELS
ProptisorINTRODUCTION
Ihave established M/s Eastern Fuels at Plot No. 19, Barhi
Industrial Area for manufacture of optimum sized crushed coal
obtained from crushing and screening. The same is established
after receiving Consent to Establish from JSPCB vide Ref. No,
JSPCB/HO/RNCICTE-4426116/2019/74,
Ihave received the letter of land allotment from Jharkhand
Industrial Area Development Authority (JIADA). The total lease
period of the land is for 30 years. The unit will be headquartered at
Baralal Street, Upper Bazar, Ranchi ~ 834 001.
‘The capacity of the is 9600MT per annum ie. 800 Metric
‘Tons per month (Raw material). The manufacturing process, as
detailed here-below involves both machinery and manual sorting
and processing of coal. The detail of the plot allotted is as follows:
SI. No. ‘Khata No. [Survey Plot No.| Area (Acres)
| 1522 Part 0.04
1524 Part | 0.96
Total 1.00 Acres
PROSPECTUS
Coal is the most vital fuel in India. Due to the immense
need of industry and in electricity generation the demand of coal
has recently increased vigorously. Mostly coal is procured by
thermal power plants and industries (all large medium and small
scale) directly from collieries of Coal India Ltd. Some industries
have nowadays resorted to imported coal for better quality and
efficiency.
For EASTER uc
PepateeThe procured coal is directly used by the units in the
furnaces / ovens as fuel. Such coal is not only of improper size but
also contains impurity in the form of stones / colliery overburden /
hard chunks of coal. Feeding the coal directly into the boilers /
ovens / furnaces reduces the quality of output substantially. On
account of this, the coal is not burnt fully and the fuel is under-
utilized giving rise to various problems like low-heat / late ignition
| short burning etc. This not only reduces the efficiency of the
industry but also increases pollution.
The coal sorted, crushed and screened will provide better
efficiency in all respects as the hard pieces / colliery ob / stones
which will be fully removed and only flammable carbon rich coal of
equal size will be the output. The screened coal is used in several
industries viz. tiles industry, soap manufacturing concerns, bricks
kilns and sponge iron plants.
POLLUTION CONTROL MEASURES
As a result growing awareness about atmospheric and
water pollution, consequences due to intensive industrialization in
the country as well as Government's initiatives to combat with
pollution problem, the objective of Eastern Fuels is to make
environment friendly atmosphere of the plant area so as to produce
good quality sized coal for industrial use. The bag filter device
installed on the crusher machine will absorb all the pollutants
generated due to crushing so that the quantity of pollutants
remains well within the prescribed limit. The installed bag filter
system will make this possible by absorbing all the particulate /
micro-sized particle matter. The absorbed particles will be re~
directed to the machine for avoidance of wastage.
For EASTERN FUELS
PreeiotorThe crushing and screening machine is installed under a
covered shed to control the flow of dust / micro-particles in the open.
air. Water sprinkling system is installed for absorption of any
remaining dust. The loading and unloading of raw material and
final product shall be done on water sprinkled land so as to avoid
any flow of dust in the air.
Four feet wide green plantation is provided around the
periphery of entire plant area of one acre to minimize pollution to
maximum possible extent. In addition more plantations is being
done on unused area of the unit so as to compensate the
environment. Moreover, Rain water harvesting system is
constructed and maintained for storage and conservation of water.
PLANT AND MACHINERY
1. Crushing machine (Jaw Crushex)
2. Motor for the crusher
3. Back filter device with motor
4, Screening machine and motor for screening
5 Genset
6. Hand-baskets for carrying coal
7. Submersible / Compressor Water Pump
8. Electricity connection 3 Phase from JIADA (Applied)
9. Shovels and Hoes
10. Other miscellaneous tools & equipments
or EASTERN FuELg
Proptetor10.
1.
12,
13.
14,
16.
INFRASTRUCTURE
Land 1 acres procured for 30 yrs lease from JIADA
Boundary wall of 10 feet height throughout. (10'x2’)
Big Steel Gate for trucks and one small gate carved inside.
Ramp for Crushing machine.
Platform for installation of screening device.
‘Two rooms (15'x15’) each for office and labour wit
attached in labour room. Open verandah of 80°x5’
room.
washroom
ittached to
‘Two sheds 20°x20’ each for raw material and finished product
with Pukka platform.
Bag filter device with motor.
Platform / room for installation of gen-set
LAND USE PATTERN
‘Total Land for Unit = Lacres
Land for two rooms (Labor and office) :: 10 dee. approx.
Land for shed for machinery = 16 dee. approx.
Land for storage of raw material ‘10 dec. approx.
Land for storage of finished product 10 dec. approx.
Miscellaneous uses like rain-water 5 dec. approx.
Harvesting, Bore-well pump, eto.
For EASTERN FueLs
ProsrivioeINVESTMENT
LAND AND BUILDING
1, Land lease payment payable to JIADA
2. Annual charges to JIADA (with GST)
8. Boundary wall of 10 feet height(with gates) ::
4, Rooms and Ramp
5. Two sheds for storage
‘Total Land and Building cost
PLANT AND MACHINERY
1. Jaw Crusher machine with motor
2. Screening machine with motor
8. Gen-set
4, Bore-well with motor connection
‘Total Plant and Machinery cost
POLLUTION CONTROL
1. Bag filter with motor and storage
2. Rain water harvesting system
8. Water sprinkling system
4, Tree plantation in the premises
‘Total Pollution Control cost
‘TOTAL PROJECT COST
Rs. 459799.00
Rs. 14161,00
Rs. 950000.00
Rs. 360000.00
Bs._600000,00
Rs, 2373960.00
Rs. 825000.00
Rs. 220000.00
Rs. 270000.00
Rs, 100000,00
Bs. 915000.00
Rs. 210000.00
Rs. 150000.00
Rs, 0000.00
Rs._20000,00
‘Rs, 430000.00
‘Rs, 8718960.00
For EASTERN FUELS
ProsrietarMANUFACTURING PROCESS
‘Though, the manufacturing process flow chart has been
explained in a separate document, this is a brief overview of the
process. The process will involve both use of man-power and
machinery.
‘MANUAL PROCESS
After the raw material will be received in plant, it shall be
stored at the raw material stockyard. There, general screening of the
coal will be done manually by separation of stones, hard pieces and
factory ob from the lot of the lump. The fresh lump will be then
broken into machine feed-able sizes and will be segregated. The sized
coal will then be put into feeder of Jaw crusher machine.
‘MACHINERY PROCESS
‘The Jaw crusher will crush and break the lumps of coal into
various sizes which will pour directly into the screening machine
which contains various sizes holes (jalis) which will segregate the
lumps. This continuous process will enable to manufacture and stock
as per demand.
‘MANUAL PROCESS
‘After the finished goods heap will have good amount of
stock, it will be stored in the stockyard as per sizes and will be ready
for dispatch in trucks.
CAPACITY AND ANNUAL UTILIZATION
‘The capacity of the plant is to process 9600 MT per annum i.e.
800 MT per month. The detail of annual utilization is as under.
Max production in one day = 32MT
No. of working days in plant = 26 days
No. of working days per annum (25x12) :: 800 days
Total annual capacity (32x300) = 9600 MTPA
For EASTERN FUELS
eR
Proprietor,MANPOWER REQUIREMENT
‘The following is the manpower requirement of the plant.
1. Proprietor
2, Manager / Supervisor a)
3. Accountant / Clerk ae
‘Total managerial staff =: 8.
4, Skilled labours no4
) 5. Semi-skilled labours no@
6. Unskilled labours
‘Total labours 9
seneanaenananeeeneaee Thank yount*eeennananennannes
for easTepn rusts
Propricior