You are on page 1of 1
{AIG HR (GOVERNMENT OF INDIA) {ca stata (MINISTRY OF RAILWAYS) ‘tad ats (RAILWAY BOARD) No. 2015/CEIL/TKII4 New Delhi Dated: 14.03.2022 1G) Principal Chief Engineers AAlIZonal Railways: Sub: Safety of Railway staff Incidences of run over eases of Railway staff while working on track have boen reported over Zonal Railways, Instructions on ensuring safely at worksites have been issued to Zonal Railways trom time to time. The same are reiterated a8 under: 1 Protection of work sites must be rechecked for eorret location of eaution boards, Alagiea ts Altempt should he made 0 open less number of sites and progress work by pooling of Maite nce work on tack to be done only after ensuring proper protection of teack/vorkste as per laid down instructions. Wherever require, a staff should be posted for lookout dy No supervisor a staff shouldbe foreed todo maintenance work without protstion of track worksite NNo harassment of staf or supervisor for puting banner fag for sey reasons, Full supply of safety gears to sta working on tack should be ensured, ‘VHF based approaching tain warning system (RAKSHAK) should be commissioned and provided to P. Way gangs, for advance warning of approaching trains, Regular counseling af ea eeganting personal sity should done involving supervisors and officers, Knowledge of staff regarding safety precautions to be checked during regular inspections, Viotations, if any, should be monitored and severe action shotld be defaslters, tken against onal Railways ate requested to follow the above in tue spirit, Aetion taken on ahove may be ased to Board atthe earliest. { Yryt rae Director Civil Engg. (Pl) ) Railway Board

You might also like