You are on page 1of 2
UNIT: L Drum/Separator Area: Rev : 0/2021 BOILER WALKDOWN CHECK LIST, NTPC Unchahar Shift: M/E/N.GR-ABICD Date: SL_| Location Remarks | Ifyes, then details 1._| Leakages & Valves passing YES/NO 2. | Any Leakage’ passing in DrunvSeparator/ SH) HR YES 7 NO Safety Valves/ERV/ Soot blowing SV and impulse lines 3. | All local instruments like hydra step and gauges are ok and | YES 7 NO no leakages are observed. _| Lighting ok YES_7_NO 3__|[ Debris, Scrap, dust on Buck Stays or nearby area YES_7_NO 6._[ All SH/RH drains are not passing. (hot or not hot) YES_7_NO 7. | Any unsafe Area’ penthouse area abnormality YES 7 NO I1.SH Spray Station: -L_ | Location Remarks | Ifyes, then details T_| SH Spray Station- Valve Leakages, passing YES_7_NO 2. | Lighting ok YES/NO 3.| Debris, Scrap. dust on Buck Stays or nearby area YES_7_NO. 4] Any unsafe Area YES 7 NO IILRH Spray Station: -L__| Location Remarks T._[ RH Spray Station-valve leakages, passing. YES_7 NO 2. | Deaerator, Aux Steam Header No leakages and No YES | NO safety valve passing 3._| Lighting ok YES_7_NO 4. | Debris, Serap, dust on Buck Stays or nearby area YES 7 NO TV. Burner Firing Floor: SL Tocation Remarks | Iyes, then details 1. _| Bumer area , PF pipe, Feeder and mill input coal pipe | YES 7 NO coal Dust, Oil. steam, ar leakages 2 | Any Oil, Steam, Air leakage in fuel oil station. 3. | Any Coal dust/Oil accumulations on ducts. pipes, YES 7 NO buck stays Z_| HOTV,HOCV HOS YES_7_NO 3. | Feeders, ECO Hoppers, Valves in Bumer Floor, primary | YES 7 NO sample coolers/SWAS sample coolers-ok &_[ Lighting ok YES_7_NO 7__| Debris / Scrap accumulation YES/NO 8__[ Any unsafe area YES/NO 9.__ | All Corner burner tlt shear pin/angle indicators ok ‘YES_7_NO 10 | All gauges and limit switches are not physically YES 7 NO damaged. TI. | Economiser flushing apparatus ash flow-OK YESRO V. APH & Bottom Ash Area: SL_| Location Remarks | Tfyes, then details 1. APH, Oil Pumps, Drives ‘YES _7_NO Rev : 0/2021 2.__| Goose neck Panel area for tube leakage checking. YES_7_NO 3._| APH inspection lights ok ‘YES_7_NO 4. | APH Air motor and main drive ok, APH air motor YES / NO lubricator oil level is ok (no abnormal sound, vib. etc.) 5.) All APH area for leakages and adjacent area YES 7 NO ash accunmilation, 6. | APH firefighting charged with both valve closed YES 7 NO 7. ___| Mills, PA Fans, Bottom ash system-Expansion Readings at] VES 7 NO) ring header &.__| Lighting YES_7_NO 9. Debris / Scrap accumulation YES_7_NO. TO, | Any unsafe area YES_7_NO T1.__| Burner firing floor Fnmulsifier DV status(charged) YES_7_NO 12, | Eco/APH hopper Ash evacuation YES/NO 13._| S panel peephole clear YES_7_NO 14. | Bottom ash hopper peephole water visible YES 7 NO (if no Bottom ash deashing ip) VL Complete Boiler should be thoroughly walked down to identify any tube leakages. Remarks, VIL. All wall blower, LRSB home position. YES / NO VIIL Any passing, leakage in Soot blower Station. YES / NO IX. All manhole peephole properly closed and sealed. YES / NO X. Any Significant Ash leakage. YES / NO XI_ All Boiler insulation OK. YES / NO XII Any leakage in Sample cooler. YES / NO ‘Note: Care must be taken that any water'Steam leakage should not cause any secondary damage to any instrument or System, ‘Note: All Critical valves which are vulnerable for Rains should be covered with appropriate muterial XII Elephant door cooling water charged, Pressure gauge ok YES / NO XIV. Boiler PA system healthy YES / NO XV. All Boiler expansion indicators healthy YES / NO XVI Air leakage from ASLD XVIL Any Other Communication: SL [Location Remarks Boiler Desk Engineer ce Name/Signature:

You might also like