UNIT:
L Drum/Separator Area:
Rev : 0/2021
BOILER WALKDOWN CHECK LIST, NTPC Unchahar
Shift: M/E/N.GR-ABICD Date:
SL_| Location Remarks | Ifyes, then details
1._| Leakages & Valves passing YES/NO
2. | Any Leakage’ passing in DrunvSeparator/ SH) HR YES 7 NO
Safety Valves/ERV/ Soot blowing SV and impulse lines
3. | All local instruments like hydra step and gauges are ok and | YES 7 NO
no leakages are observed.
_| Lighting ok YES_7_NO
3__|[ Debris, Scrap, dust on Buck Stays or nearby area YES_7_NO
6._[ All SH/RH drains are not passing. (hot or not hot) YES_7_NO
7. | Any unsafe Area’ penthouse area abnormality YES 7 NO
I1.SH Spray Station:
-L_ | Location Remarks | Ifyes, then details
T_| SH Spray Station- Valve Leakages, passing YES_7_NO
2. | Lighting ok YES/NO
3.| Debris, Scrap. dust on Buck Stays or nearby area YES_7_NO.
4] Any unsafe Area YES 7 NO
IILRH Spray Station:
-L__| Location Remarks
T._[ RH Spray Station-valve leakages, passing. YES_7 NO
2. | Deaerator, Aux Steam Header No leakages and No YES | NO
safety valve passing
3._| Lighting ok YES_7_NO
4. | Debris, Serap, dust on Buck Stays or nearby area YES 7 NO
TV. Burner Firing Floor:
SL Tocation Remarks | Iyes, then details
1. _| Bumer area , PF pipe, Feeder and mill input coal pipe | YES 7 NO
coal Dust, Oil. steam, ar leakages
2 | Any Oil, Steam, Air leakage in fuel oil station.
3. | Any Coal dust/Oil accumulations on ducts. pipes, YES 7 NO
buck stays
Z_| HOTV,HOCV HOS YES_7_NO
3. | Feeders, ECO Hoppers, Valves in Bumer Floor, primary | YES 7 NO
sample coolers/SWAS sample coolers-ok
&_[ Lighting ok YES_7_NO
7__| Debris / Scrap accumulation YES/NO
8__[ Any unsafe area YES/NO
9.__ | All Corner burner tlt shear pin/angle indicators ok ‘YES_7_NO
10 | All gauges and limit switches are not physically YES 7 NO
damaged.
TI. | Economiser flushing apparatus ash flow-OK YESRO
V. APH & Bottom Ash Area:
SL_| Location Remarks | Tfyes, then details
1. APH, Oil Pumps, Drives ‘YES _7_NORev : 0/2021
2.__| Goose neck Panel area for tube leakage checking. YES_7_NO
3._| APH inspection lights ok ‘YES_7_NO
4. | APH Air motor and main drive ok, APH air motor YES / NO
lubricator oil level is ok (no abnormal sound, vib. etc.)
5.) All APH area for leakages and adjacent area YES 7 NO
ash accunmilation,
6. | APH firefighting charged with both valve closed YES 7 NO
7. ___| Mills, PA Fans, Bottom ash system-Expansion Readings at] VES 7 NO)
ring header
&.__| Lighting YES_7_NO
9. Debris / Scrap accumulation YES_7_NO.
TO, | Any unsafe area YES_7_NO
T1.__| Burner firing floor Fnmulsifier DV status(charged) YES_7_NO
12, | Eco/APH hopper Ash evacuation YES/NO
13._| S panel peephole clear YES_7_NO
14. | Bottom ash hopper peephole water visible YES 7 NO
(if no Bottom ash deashing ip)
VL Complete Boiler should be thoroughly walked down to identify any tube leakages.
Remarks,
VIL. All wall blower, LRSB home position. YES / NO
VIIL Any passing, leakage in Soot blower Station. YES / NO
IX. All manhole peephole properly closed and sealed. YES / NO
X. Any Significant Ash leakage. YES / NO
XI_ All Boiler insulation OK. YES / NO
XII Any leakage in Sample cooler. YES / NO
‘Note: Care must be taken that any water'Steam leakage should not cause any secondary damage to any instrument or
System,
‘Note: All Critical valves which are vulnerable for Rains should be covered with appropriate muterial
XII Elephant door cooling water charged, Pressure gauge ok YES / NO
XIV. Boiler PA system healthy YES / NO
XV. All Boiler expansion indicators healthy YES / NO
XVI Air leakage from ASLD
XVIL Any Other Communication:
SL [Location Remarks
Boiler Desk Engineer ce
Name/Signature: