You are on page 1of 1

Tribhuvan University

Institute of Engineering
Group No:
Pulchowk Campus
19/20
Department of Civil Engineering
Survey Instruction Committee
Fly Levelling (RL Transfer) -Forward Data
Stadia Hz. Dst
Chainage

Back Sight BS Mean S1 Fore Sight FS Mean S2 Rise Fall


Interval (m)
Remarks
Top Mid Bot BS (T-B) Top Mid Bot FS (T-B) + - S=S1+S2 Sx100
TBM2 1.685 1.587 1.489 1.587 0.196 0.196 19.600
TP1 1.605 1.515 1.423 1.514 0.182 1.761 1.665 1.570 1.665 0.191 0.000 0.078 0.373 37.300
TP2 1.380 1.275 1.170 1.275 0.210 1.145 1.060 0.972 1.059 0.173 0.455 0.000 0.383 38.300
TP3 0.870 0.835 0.795 0.833 0.075 1.395 1.300 1.205 1.300 0.190 0.000 0.025 0.265 26.500
TP4 0.745 0.685 0.625 0.685 0.120 1.970 1.930 1.890 1.930 0.080 0.000 1.095 0.200 20.000
TP5 0.844 0.801 0.761 0.802 0.083 1.680 1.619 1.558 1.619 0.122 0.000 0.934 0.205 20.500
TP6 0.677 0.640 0.603 0.640 0.074 1.707 1.668 1.628 1.668 0.079 0.000 0.867 0.153 15.300
SBM 1.246 1.217 1.186 1.216 0.060 0.000 0.577 0.060 6.000
Sum 7.338 10.459 0.455 3.576 183.5
∑BS-∑FS= -3.121
∑RISE-∑FALL= -3.121

You might also like