METHOD NATURALISASI DRAINAGE AT SAVYAVASA GALERY

ALTERNATIVE 2

PLAN NATURALISASI DRAINAGE STEP 1


SECTION - A
1 INSTALL BARICADE BY SCAFOLDING
200 2 INSTALL BLUESHEET
1

BARICADE BY SCAFFOLDING 2000

0
& BLUE SHEET

249
353 1371 276

GE
2 ND 923
STA
EXISTING ROADWAY

300
6

A
813

0
252

991
3 DEMOLISH EXISTING DRAINAGE
*DISMANTEL EXISTING TILE
*EXCAVATION BY MANUAL
E
AG
1 ST 4210
ST

STEP 2
SECTION - A
WIRE MESH
M8 DOUBLE

FLOOR DECK
T=0.75

2000
794

50 250

354
EXISTING ROADWAY
EXISTING DRAINAGE
SECTION - A

800
5 CONCRETE K-350

INSTALL U-DITCH 800x800x1200

150 100
4
HEAVY DUTY TYPE
EXISTING ROADWAY

PLASTIC SHEET
LEAN CONCRETE
BASE COURSE

STEP 3
SECTION - A
7 DEMOLISH BARICADE &
CONTINUE NEXT STAGE
6 INSTALL WITH
EXISTING TILE

EXISTING ROADWAY

5 CURRING TIME 7 DAYS