Methode Naturalisasi Drainage at Galeri Alternative 1
Methode Naturalisasi Drainage at Galeri Alternative 1
ALTERNATIVE 1
PLAN NATURALISASI DRAINAGE STEP 1
SECTION - A
1 INSTALL BARICADE BY SCAFOLDING
2 INSTALL BLUESHEET
140
0
BARICADE BY SCAFFOLDING
& BLUE SHEET 1420 347
0
249
EG
2 ND 933
STA
EXISTING ROADWAY
A
3
FFL+23.483
1
813
9
252
1361
3 DEMOLISH EXISTING DRAINAGE
*DISMANTEL EXISTING TILE 1080
*EXCAVATION BY MANUAL
E
AG
1 ST 4196
STEP 2
ST
SECTION - A
1400
156 1080 164
50
EXISTING ROADWAY
EXISTING DRAINAGE FFL+23.483
SECTION - A
1080
800
1256
5 CONCRETE K-350
176
EXISTING ROADWAY
PLASTIC SHEET
LEAN CONCRETE
BASE COURSE
STEP 3
SECTION - A 7 DEMOLISH BARICADE &
CONTINUE NEXT STAGE
6 INSTALL WITH
EXISTING TILE
EXISTING ROADWAY
FFL+23.483