METHOD NATURALISASI DRAINAGE AT SAVYAVASA GALERY

ALTERNATIVE 2

PLAN NATURALISASI DRAINAGE STEP 1


SECTION - A
1 INSTALL BARICADE BY SCAFOLDING
200 2 INSTALL BLUESHEET
1

BARICADE BY SCAFFOLDING
2000

0
& BLUE SHEET

249
387 1302 311

GE
2 ND 923
STA
3
EXISTING ROADWAY
6

A
813

300
0
252

814
3 DEMOLISH EXISTING DRAINAGE
*DISMANTEL EXISTING TILE
*EXCAVATION BY MANUAL
E
AG
1 ST 4210
ST

STEP 2
SECTION - A
WIRE MESH
M8 DOUBLE

FLOOR DECK
T=0.75

2000

250 50
EXISTING ROADWAY
FFL+23.483
EXISTING DRAINAGE
SECTION - A

600
5 CONCRETE K-350

4 INSTALL U-DITCH 600x600x1200


EXISTING ROADWAY 600
PLASTIC SHEET
LEAN CONCRETE
BASE COURSE

STEP 3
SECTION - A
7 DEMOLISH BARICADE &
CONTINUE NEXT STAGE
6 INSTALL WITH
EXISTING TILE

50
EXISTING ROADWAY
FFL+23.483

5 CURRING TIME 7 DAYS