Bro. Yaw
TOTAL 4,960.00
TOTAL 392.00
TOTAL 8,615.00
Workmanship 8,300.00
MATERIAL COST
(A) FOUNDATION WORKS UP TO FLOW 4,960.00
(B) PLUMBING MATERIALS 392.00
(C') FROM FLOW TO LENTLE 8,615.00 13,967.00
Workmanship 8,300.00
TOTAL 24,067.00