Professional Documents
Culture Documents
Dokumen Kapal MV Babitonga
Dokumen Kapal MV Babitonga
93.1% 10,801 M/T 86.6% 10,707 M/T 89.2% 10,204 M/T 91.3% 10,109 M/T 96.0% 11,010 M/T 97.5% 12,055 M/T 96.4% 10,114 M/T
WBT NO. 5 WBT NO. 4 WBT NO. 3 WBT NO. 2 WBT NO. 1
Total : Grade : Tonnes Grade: Tonnes Tonnes Total : 75,000.00 M/T Tonnes
23.46 Calculated Departure 6.61 8.62 -97.95% 78.75% 7.62 2.01 42.29 15.86 15.17 14.45
TOTAL 75,000 300.0h
NO DEVIATION FROM ABOVE PLAN WITHOUT PRIOR APPROVAL OF CHIEF MATE Signed Terminal *Bending moments (BM) & shear forces (SF) are to be expressed as %age of maximum
Pours to numbered 1A, 1B, 2A, 2B, etc. when using two loaders. permitted in-port values for intermediate stages, and of maximum permitted at-sea
Abbreviations: PI = Pump In GI = Gravitate In F = Full PO = Pump Out GO = Gravitate Out mt = Empty Signed Ship values for the final stage. Every step in the loading/unloading plan must remain within
All entries within the box must be completed as far as possible. The entries outside the box are optional. the allowable limits for the hull girder shear forces, bending moments and tonnage per
Rommel C. Furigay Capt. Leonardo B. Acejo Jr. hold, where applicable. Loading/unloading operations may have to be paused to
HMK - PR - MN - 06 (Bulk Carrier) Chief Officer Master allow for ballasting/deballasting in order to keep actual values within limits.
Rev. - 0 Appendix - A
SHIP'S PARTICULARS