You are on page 1of 24

ZTE Proposed IP Solution for Aftel

01 ZTE Proposal

Contents
02 ZTE Products

03 ZTE Successful Cases


Kabul Metro > Internal Only

© ZTE Corporation. All rights reserved.


3
ZTE Propsoed Solution
Power
Sites System Configuration Power (W)Per equipment Total Power(W)Per Site Power BackTime(H)
Type
8*100G 1990
PTT M6000-8S Plus 48*1GE 3980 DC 12
10*10G 1990

8*100G
Macroryan M6000-3S Plus 48*GE 1460 1460 DC 12
10*10G

M6000-8S Plus 8*100G 1990


48*1GE
MCIT-HQ 3980 DC 12
10*10G
M6000-8S Plus 1990

8*100G
Shahrenaw M6000-3S Plus 48*1GE 1460 1460 DC 12
10*10G

Karte Naw M6000-3S Plus 1020 1020 DC 12

Arzan Qemat M6000-3S Plus 1020 1020 DC 12


Pulecharkhi M6000-3S Plus 1020 1020 DC 12
Darulaman M6000-3S Plus 2*100G 1020 1020 DC 12
Mahtab qala M6000-3S Plus 48*1GE 1020 1020 DC 12
10*10G
Karte Char M6000-3S Plus 1020 1020 DC 12
Khushal Khan M6000-3S Plus 1020 1020 DC 12
Khairkhana M6000-3S Plus 1020 1020 DC 12
Taymani M6000-3S Plus 1020 1020 DC 12

1.SDH will be reused to provide STM4 interface


2.100G interface will be used as 40G interface
ZTE Propsoed Solution

ZTE Solution

Deploy a brand new backbone network with ZXR10 M6000-S;

Move the current service to the new backbone network;

Add three pairs of ZXR10 M600-S at KBL for aggregation.


ZTE Propsoed Solution

Replacing a single swtich with a router


is most likely to cause issues since a
router does not support switch features
Low Risk

Performance Once for All

Efficiency A full-router backbone network


leads to an easy expansion of
service and business in the
Upgrading a single station
future.
can be considerably
uneconomical and time-cost.
01 ZTE Proposal

Contents
02 ZTE Products

03 ZTE Successful Cases


ZXR10 M6000-3S Plus
Power supply AC
DC
module HVDC

Single module 2420W/


3000W
output power 3600W

Power supply
1+1 1+1
redundancy Port capacity 3Tbps
Slot
Smart Fan
throughput 1Tbps
Fan tray x 2
capability
Dual-fan per module
Service slots 3

Line card PFU x 3


Dimensions 264 ×442 ×630
H×W×D 6RU
MPU x 2
(active-standby)

Power supply DC/AC/HVDC


ZXR10 M6000-8S Plus

Smart Fan Tray x 2 Average-current AC


DC
power supply HVDC
11 fans per tray Single module 3300
2408W
output power /3000W Port capacity 8Tbps/16T
Maximal chassis
SFU x 2 5+1 4+4/5+1 Slot
configuration
throughput 1Tbps/2Tbps
3+1 redundancy
capability
Service slots 8
Dimensions 971.5×442×634
SRU x 2
H×W×D 22RU
RP (active-standby)
Switch Fabric (active-
Parallel current
active) Power supply sharing
DC/AC/HVDC
Line card x 8
M6000 Flexible Line Card and Interface Board
2T/1T/500G/400G/240G/200G ETH PIU:
PFU:
Optical
TYPE Module PIU

400GE QSFP-DD 1*400GE


RPZ-01CDG-QDD-S

5*100GE, 4*100GE, 3*100GE,


QSFP28
2*100GE, 1*100GE RPZ-05CG-Q28-S
100GE
CFP2 2*100GE, 1*100GE
RPZ-02CG-CFP2-S
Multi-service interface:
50GE QSFP28 5*50GE, 2*50GE
E1/POS RPZ-05LG-Q28-S

25GE SFP28 20*25GE, 10*25GE


RPZ-20QCG-S28-S

10GE/ 24*10GE, 20*10GE, 12*10GE, 10*10GE,


SFP+
GE 12*10GE+8*GE, 24*GE RPZ-24XGL-SFP+-S
Cooling Design

The air comes in from


the front bottom and
goes out from the rear
The air flows from top.
d
rce
the right to the rear
Di
F o ir - co str
a ing ol ict
ol in
g
co

M6000-3S Plus

In
rev ual-

te
fan rse

ll
ad spe igen
e
s
D

jus ed t
tm M6000-8S Plus
en
t

l Smart FAN: Automatically adjust based on the real-time temperature of each slot-zone.
l Dual-reverse fans: When a rotor fails, the other rotor and other fans automatically rotate at the highest speed.
AC Model:
DC Model:
Propsoed M6000 8S-Plus Layout & Boards

Idle Idle
Idle Idle
RPZ-10XG-SFP+-S(10*10G) Idle

RPZ-24G-SFP-S )
24GE (
RPZ-24G-SFP-S )
24GE
(48GE+10*10G+8*100G)

&M6KS-PFU-A02-H2
Power Module

M6KS-PFU-202-H2
M6KS-SRU-8-1JXEC
Cable Tray
Air Outlet

Air Inlet
Fan 1

Fan 0
PTT&MICT Nodes:

M6KS-SFU-8-JE M6KS-SFU-8-JE
M6KS-SRU-8-1JXEC

RPZ-04CG-Q28-S )
4*100G RPZ-04CG-Q28-S(4*100G)
Idle Idle
Idle Idle
Idle Idle
Idle Idle
Idle Idle
RPZ-10XG-SFP+-S(10*10G) Idle

RPZ-24G-SFP-S )
24GE (
RPZ-24G-SFP-S )
24GE

&M6KS-PFU-A02-H2
(48GE+10*10G+8*100G)

M6KS-PFU-202-H2
Power Module
M6KS-SRU-8-1JXEC

Cable Tray
Air Outlet

Air Inlet
Fan 1

Fan 0
PTT&MICT Nodes:

M6KS-SFU-8-JE M6KS-SFU-8-JE
M6KS-SRU-8-1JXEC

RPZ-04CG-Q28-S )
4*100G RPZ-04CG-Q28-S(4*100G)
Idle Idle
Idle Idle
Idle Idle
Propsoed M6000 3S-Plus Layout & Boards

For Macroryan &Shahr-e-naw Nodes:(48GE+10*10G+8*100G)


DC Model:
RPZ-10XG-SFP+-S (10*10GE) RPZ-24G-SFP-S (24*GE)
M6KS-PFU-A02-H2
RPZ-24G-SFP-S (24*GE) RPZ-04CG-Q28-S (4*100GE)

RPZ-04CG-Q28-S (4*100GE) Idle M6KS-PFU-202-H2

M6KS-MPU-3-1JX M6KS-MPU-3-1JX
Power Supply Power Supply

For other sites:(48GE+10*10G+2*100G)


AC Model:

RPZ-01CG-Q28-S(1*100G) RPZ-01CG-Q28-S(1*100G)
M6KS-PFU-202-H2
RPZ-24G-SFP-S (24*GE) RPZ-24G-SFP-S (24*GE)
RPZ-10XG-SFP+-S (10*10GE) Idle M6KS-PFU-202-H2
M6KS-MPU-3-1JX M6KS-MPU-3-1JX
Power Supply Power Supply
01 ZTE Proposal

Contents
02 ZTE Products

03 ZTE Successful Cases


Success Cases
ZXR10 M6000-S helped China Telecom construct
broadband MAN backbone network

ZTE continuously won the bid for China Telecom's MSE centralized procurement
project, ranking top in the overall ranking

ZXR10 M6000-S in China Telecom


In 2020, M6000-s won 50% of the share in MSE centralized procurement of China Telecom, and won the bid
continuously for many years.
In 2019, M6000-s won the bid of mse-a for the core routing and switching equipment of China telecom.

In 2018, high-end data centralized procurement of China Telecom, M6000-S won 45% share of MSE-A
section with excellent performance.

In 2017, ZTE M6000-S won 50% of the share in MSE centralized procurement of China Telecom and ranked
No. 1 comprehensive assessment.

In October 2016, China Telecom's 2016 IP centralized procurement project,won a 45% of the share in
MSE.
In December 2015, Telecom IP centralized procurement project, sub company had a total
demand of 7 routers. The M6000 series products obtained 5 of them with excellent
ZXR10 M6000-S Intelligent Full-
comprehensive capabilities.
Service Router
In November 2015, China Telecom's IP centralized procurement results were released. The M6000 series
products have doubled in the expansion of MSE and SR centralized procurements.
Success Cases
ZXR10 M6000-S helped Ethiopia construct the
national broadband backbone network

M6000-S helped to build high-performance Internet HUB in East Africa,


promoting fast development of industry in the area

Project Background and Customer Demands


With rapid development of data and voice services, emergence of substantial new service
demands and fast growing traffic between core nodes of Ethiopia national backbone network,
the 10G platforms of existing core nodes face rigorous challenges
New services caused new technology deployment demands to boom such as integrated
deployment of IPv6, CGN and BRAS, posing huge challenges to existing network devices

Solution Highlights and Customer Benefits


Five pairs of BRs were interconnected, one of the highest-speed backbone network linked in Africa

Service expansion capability and flexible and fast service deployment helped the customer to
make profits and increase revenues. Industry-leading load-balance CGN cards & BRAS
protection technology provide optimal user experience and save cost
Success Cases
ZXR10 M6000-S helped TP increase market share
& sustainable network development

ZTE provided advanced products and technologies to build highly


efficient and secure network for TP

PE PE PE PE Project Background and Customer Demands


PE PE
The existing IP Backbone network linked bandwidth were less than 2.5G, and the network
PE PE bandwidth pressure were increasing huge
There were a large number of PTN devices on the current network, which cannot meet the
PE P P PE
growth demand of LTE services. In order to reduce the investment, the existing network PTN
PE PE needed to be upgraded and upgraded, and a new IP RAN was built to carry the LTE service
P P M6000-S
RR RR
T8000/
PE
P
RR RR
P
T8000-18
Solution Highlights and Customer Benefits
PE PE The M6000-S replaced the existing Cisco routers, and used L2 and L3VPN to carry all network
PE P P
PE
services to create a high-reliability, large-bandwidth, converged, and future network
ZTE provided advanced products and technologies to meet customers' new business deployment
PE PE needs. At the same time, it used the old network to ensure the smooth expansion of the network
and protect the customer's investment. TP also appreciated efficient and secure network
PE PE PE PE PE
Success Cases
ZXR10 M6000-S helped smartfren to improve its
market competitiveness

ZTE provided end-to-end network solution, unified O&M and


efficiency improvement
Other Cities
T8000/T8000- Background and Demands
18 The number of users increased greatly year by year, and the network needed to be expanded
RR continuously. The bandwidth requirement was increasing.
M6000-S
Deploy large-capacity devices, reduced network hops and save costs.

T8000/T8000-
18 Highlights and Benefits
ZXR10 M6000-S with high capacity and high security was selected to reduce the number of
network hops in different network areas and achieve low latency.
The L3VPN was adopted. There were 23 sites in the whole network, and the dual-plane

... design was used. The redundancy can realize the load balancing. Even if a link fails, the
service transmission would not be affected.
PE PE PE PE Smartfren is one of the leading network operators in Indonesia: It accounts for 40% of 4G
M6000-S M6000-S M6000-S M6000-S users and ranks first in the market.
Success Cases
ZXR10 M6000-S helped Nepal Telecom
construct long-term evolution of IP backbone
network

Large-capacity M6000-S provided perfect expansion capability

Project Background and Customer Demands


• Fixed network and wireless services in Nepal were becoming more popular, and traffic
M6000-16
in the backbone network was increasing sharply.
M6000-8S
• Existing backbone network devices were obsolete. The expansion capacity was limited.
• Wireless services became the main service growth point of Nepal Telecom.
• Urgently needed to build an IP backbone network to carry voice and wireless services.

CS/PS NEs

Highlights and Benefits of the Solution


• The solution guarantee large-scale capacity expansion and traffic growth of wireless
services
• The fixed network and mobile service backbone network were constructed on different
CS/PS NEs planes , which made maintenance of the backbone network easier and service
deployment more flexible
• The high-end router with high capacity provided perfect expansion capability
Success Cases
ZXR10 M6000-S helped Turkcell increase the
capacity of IP Core Network

Turkcell IP Core (NPE) project, increasing the capacity of the existing


network and introducing new features for future 5G.
Project Background and Customer Demands
• Turkcell is the largest mobile operator in Turkey.
• The existing network equipment is old and the platform capacity is low, unable to meet the
increasing demand for traffic.
• The evolution capability of existing network equipment is not strong enough to meet the new
needs of 5G in the future.
• Huawei and Cisco have a high level of business control in the existing network, and the operating
cost pressure is high. It is necessary to introduce a third supplier to reduce Capex and Opex.

Highlights and Benefits of the Solution


• Increase existing network capacity:Using the latest V5 new platform product-M6000-
8S Plus, with 1T high-performance line card, greatly increasing the capacity of the
existing network.
• Introduce new features for future 5G:Relying on our self-developed chips to provide
new features for future 5G evolution.
• Ensure supplier safety and balance&Reduce operator expenses:Smoothly replace
NE40E products of Huawei on the existing network.
Success Cases
ZXR10 M6000-S helped Vodacom realize the
modernization reconstruction of bearer networks

ZTE helped Vodacom maintaining a leading position, and enlarged the


profitability and competitive strength
Lubumbashi Goma
Background and Demands
M6000-S M6000-S M6000- M6000-S
CORE The telecom market in Congo-Kinshasa was in the early stage of development, and operators were driven by
S
increasing network Demands to implement broadband coverage, large bandwidth, and high reliable network
reconstruction
AGG 9000-2E10 Wireless LTE reconstruction was imminent. To meet the LTE service transmission Demands, the bearer network
also needed to be updated. Facing many competitors, Vodacom should adopt a more efficient transmission
solution to meet the multi-service transmission Demands, ensure the rapid deployment of services and lead the
Congo-Kinshasa market

Highlights and Benefits


Commercial deployment of 6 ZXR10 M6000-5S devices in MAN backhaul network in the core layer, 36
ZXCTN 9000-2E4 devices used for IP RAN scenario

6120 The IPRAN network started to be deployed by ZTE in 2016. It was stable and there was no equipment
9000-2E4 fault.
MW+IP RAN solution solved the shortage of optical fiber resources and provided high quality transmission.
Success Cases
100G IP backbone network helps Tanzania's
communication infrastructure develop rapidly

ZTE lays the foundation for long-term healthy development of Tanzania


national backbone network
Project background and customer requirements
CITCC needs to build new IP networks to implement flexible transport of IP services, playing
A B
the foundation for fast development of telecom market.
A B A B A B A B
A A A A A NMS-U31
B B B B B A A
B
A
B
A
B
B
A A It needs to deploy third-party network management systems (NMS) to perform unified
management of SDH/OTN/IP.
B B
B B A A
B
B
It needs highly reliable network protection technologies and network architecture to reach the
A A
A A
B B B B
A A A A
B
protection level of 99.999%.
B

B A
A
A
B
A
B Solution highlights and customer benefits
B A B A A

E2E dual-plane architecture and multiple protection technologies provide carrier-class


B IGW-A
B A B A B IGW-B
A B IGW-A
A B A B A B A
reliability.
B IGW-B
B A B A B A B A

3*10GE CR-T8000 BR-M6000-8S


Large-capacity 100G/200G devices provide long-term capacity expansion capability. IPv6 and
10GE
GE IGW-M6000-8S SW-8905E
related transition technologies ensure smooth network evolution.
Third-party unified NMS is introduced to relieve the difficulty of maintaining devices from two
suppliers. Cooperation and price/service competition are also introduced to provide better
services.
Before We End...

1. The configuration of the switches that need to be replaced;


The size of their MAC table;
2. The service path of the current network;
3. The protection measures of the current network;
4. The detail of VLAN;
5. Spare optical fiber.
Thank you!

You might also like