Ministry of Energy, Water Resources and Irrigation
Department of Electricity Development Sano Gaucharan
REVISED DRAFT FINAL REPORT
for Feasibility and Environmental Impact Assessment Study of Arun 4 Hydropower Project
VOLUME 3: Annex 2 (Hydrology and Sedimentology Studies)
Annex 4 (Power Market, Power System and Power Evacuation Study Report) Annex 5 (Seismic Hazard Assessment Report) Annex 6 (Cost Estimation Calculation Sheets) Annex 7 Financial and Economic Analysis Report)
Version 2 Submitted by the JV of:
M/s Fichtner GmbH & Co. K.G.,
M/s Silt Consultants (P.) Ltd. and M/s Insight Engineering Consult (P.) Ltd. April, 2021