You are on page 1of 2

Government of Nepal

Ministry of Energy, Water Resources and Irrigation


Department of Electricity Development
Sano Gaucharan

REVISED DRAFT FINAL REPORT


for
Feasibility and Environmental Impact Assessment
Study of Arun 4 Hydropower Project

VOLUME 3: Annex 2 (Hydrology and Sedimentology Studies)


Annex 4 (Power Market, Power System and Power
Evacuation Study Report)
Annex 5 (Seismic Hazard Assessment Report)
Annex 6 (Cost Estimation Calculation Sheets)
Annex 7 Financial and Economic Analysis Report)

Version 2
Submitted by the JV of:

M/s Fichtner GmbH & Co. K.G.,


M/s Silt Consultants (P.) Ltd. and
M/s Insight Engineering Consult (P.) Ltd.
April, 2021