ESTIMATING AND COSTING
Time Allowed: 1.5 Hours Full Marks: 70
Answer to Question No.1 is compulsory and Answer any two questions from the rest.
2x20
1 Answer the following questions (any tw
Choose the correct answer from the given alternatives.
i. Volume of one bag cement is -
(a) 0.0374 cum (b) 0.0307 cum (c) 0.0347 cum (d) 0.0437 cum
i, In 15 class brickwork at foundation and plinth cement morter is used in the ratio of -
(a) 1:3 (b) 14 (@) 1:6 a) 12
iii, The minimum diameter of the ventilation pipe in a septic tank is usually considered as
(a) 30mm (b) 50mm (¢) 70mm (d) 100mm
iv. Detention period of septic tank is usually considered.
(a) 12 to 24 hours (b) 24 10 48 hours (¢) 48 10 56 hours (d) $6 to 72 hours,
¥. ‘The capacity of brick work in superstructure, ground floor per day mason is
(a) 0.5 cu, m.(b) 1.0 cu, m.@) Ll cu, md) 1.5 cu. m.
vi, One mason should do cement concrete work per day as
(a) 2.Scu.m (b) 3.5cu.m (c) 5.0 cum (d) 5.5 cum
vii, No of painter required for 100 sq m white washing two coats with a coat of primer
(a) Wanos, (b) Yenos. () Manos. (A) 32 nos,
viii. Unit of measurement for Woodwork in door and window frame is taken as
(a Cum (b) meter (sqm @) kg
ix. Number of traditional bricks required for 10 cu.m brickwork -
(a) $000 nos (b) 4100 nos (ec) 4500 nos (@) 4000 nos
Fill in the blanks.
xX. Service unit method is associated with extin
xi, Floor area is the plinth area the area of
xii, The minimum width of septic tank is
xili, The most economical shape of building is
xiv. The multiplying factor for painting collapsible gate measured flat (size of opening) all over is
xv. For work-charged establishment an amount of ____ of the estimated cost of work is considered.
xvi, Cost determination of an item of work per unit is known as
Xvi, 10 mv of (1:2:4) cement concrete shall required me,
State whether the following statements are TRUE or FALSE:
xvii, Technical sanction of project to be taken before administrative approval
xix. Inthe site plan the orientation of the building along with the north direction is shown.
1
https://www.wbseteonline.comhtips://www.wbscteonline.com
2
xx. ‘The Minimum width of a septic tank is taken 75 em.
xxi. A.C, sheet roofing is measured by sym.
xxii. Unit of measurement of steel truss is in MT ( Metric Ton).
xaili, Estimate is never an actual cost
xxiv. In measurement of collapsible gate multiplying is taken as 1.5.
xxv. One cu
meter of mild steel weights about 7850 kg.
a) What is the type of Estimate and how we prepared the detailed Estimate,
b) Write unit of measurement of ten items for the construction of a residential building.
TSA
‘To draw preliminary estimate of school building the following data are given:
{nth area—1000sqam.
Cost of plinth area—Rs.4000/-per sqm
Cost of water supply —5% of building cost
Cost of sanitation—6% of building cost
Cost of approach road and boundary wall—3% of building cost
Calculate the total cost of the project allowing for suitable contingency and work charge establishment per.
15
Define the following (any three):
i) Contingencies
ii) Work-Charge Establishment.
iii) Tool & Plants.
iv) Floor area Ratio Sx3e15
Estimate the quantities of item involved for construction of a septic with soak pit 15
cova
+f Bremer
s
REESE Lumen,
Aad
508 anecxoans
al |2o
88
rcs
SECTIONAL ELEVATION - P-P “ ?
Per
DETAIL OF SEPTIC TANK & SOAK PIT.
2
ttps:/www wbscteonline.comhttps://www.wbscteonline.com
6
9,
Prepare a list of material item involved for a 100 mum deep 40 mm nominal bore tube well filled with deep
well hand pump. Assume 100 mm casing pipe 15 m long. Is
Estimate the quantities for the following item of work of one storey two roomed building:
Room size 4 m X $m cach, all thickness 25 em.
i) Earthwork in excavation in foundation
ii) Cement concrete in foundation
iit) class brickwork in foundation and plinth
iv) 2.5 em thick DPC\
v) I class brickwork in superstructure
Assume suitable foundation and others. Is
8) Distinguish between centre line & long & short wall method
b) Calculate the Quantity of materials required for — (i) cu. m cement conerete (1:1.5:3), (ii) 12 mm
thick plaster in 1:6 cement morter on 100 sq. m. area. T5175
Prepare a bar bending schedule for a rectangular beam of size 230 X 500 mm,
The beam is reinforced with 2 No’s — 10 mm , at Bottom, 2 no's 16 mm , legged stirrups are provided at
150mm c/c through the length. Length of the beam is 4.5 m. IS
Prepare a detailed estimate of a slab culvert of 1.5 m clear span and 4 m road way. Assume any suitable
data. 1S
Analysis the rate of following items of work (any two}
i) Ordinary Cement Conerete (:2:4),
ii) 20 mm thick, plaster with L: 6 cement mortar,
iii) Brick work in Cement Mortar (1:6)
You may assume Cement -Rs.8500/MT, Brick-Rs.8900/%0 number, sand (coarse)-Rs.1450/m, Sand
(Medium)-1150/n?, Head Mason-350/duy, Ordinary mason-31 day, Mazdoor -285/day