CHECKLIST FOR STYROFOAM BLOCKS

Site Work Activity


CHECKLIST FOR STYROFOAM BLOCKS
Site
Location
Date
Grid & Level
Drawing No.
Refer to the approved relevant drawings
SL.No. Description Details
1 Are the Safety norms being covered as per HSEM Process? Yes No NA

Yes No NA
2 Check for availability of material and methodology for Styrofoam
Yes No NA
Check for preparation of surface is as per method given in specification like
3
cleaning,dust free dry surface etc.
Yes No NA
4 Check for proper lighting arrangements in the area.
Yes No NA
Check for completion of plumbing lines, electrical lines, provision of pipe
5
sleeves , bore packing & finishing of wall chasing
NA NA NA
Check for fixing of styrofill blocks to required line & level using rubberised
6
cold bitumen adhesive (RBA compound)
Yes No NA
7 Check for the sprinkling adhesive at the surface and styrofoam block.

Yes No NA
8 Check for applying uniformly with brush / roller
Yes No NA
9 Check for cutting the blocks as per layout.
Yes No NA
10 Check for Fixing the blocks line level as per drawing.
Yes No NA
11 Check for the Application of weld mesh
Yes No NA
12 Finally pour the M15 Grade of concrete 175 mm for top layer
Yes No NA
13 IPS floor finishing on AUDI Area

Signature : Site Engineer


Observations:
Whether the above points checked and in order? YES NO
Corrective Action Proposed