You are on page 1of 1

NOTE:

C B A

14
B37

3051 4 B160
+9500 4 4
+9200 14 14 4 4 LEGENDS:
24 4
4
B5 3032
53 P9 Z RUNNER 4

4
4 P14
P14 4 P9 4 3032
4 4
4 Z RUNNER 4

3014 4 4 P14
4

5200
2
B1
P14
4 4 4
P9 4 4
3032
3014 Z RUNNER

4 P14
4
P14
3032
4 4 3
4

9200
4 P9 4
4 4 4
3014 Z RUNNER 3032

+4000 P35 B13


P14
4 M/s. INDOVEDIC
4
4 4
P14 4 3032
4 P9 4 4
Z RUNNER
BOILER PLANT
3014 4 P14 5
C1 4

4000
3050
B1

4 P14 4
4

P14
4 ERECTION GA GRID @ ELEVATION 1
P9 4 4 3032
3014 Z RUNNER

42
4
4 PROPOSED LAYOUT OF INDOVEDIC
4

+0
4 M 24 BOLT A1
4 M 24 BOLT 4 M 24 BOLT
APM-IV-EGA-006 00
4115 4115
-- 1:30

8230

M/s. APM DESIGN BUILD PVT LTD


NO.205, 1ST FLOOR, South West Corner,
Sri HAri Road, Naidu layout,
Near abbayya naidu studio,
GRID @ ELEVATION -1 subramaniyapura post,BANGALORE
Karnataka, India, 560061

D:\SURESH\INDO VEDIC\BOILER PLANT\STRUCTURAL GA\APM-IV-EGA-006.dwg, 06-07-2022 16:47:03

You might also like