New Mac Warehouses Collection Boq
New Mac Warehouses Collection Boq
Face Plates
Racks
Note 1 : the riser will be executed by the Engineering Department of MAC according to our requirements.
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the customer and a
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Department of MAC
about the paths routes it may be some change in the lengthes.
Note 3 : Please be informed that this offer doesn't include the accommodation and it will be charge on the customer
This offer will be done in one visit and any extra visit will be with extra charge
407900471 108
700206725 216
140 15,120
407900422 216
N/A 108
N/A 40 20 800
N/A 90 36 3,240
N/A 42 42 1,764
N/A 52 47 2,444
ements.
ge on the customer
MAC Carpets
S.N Description
Face Plates
3 Supply of LF80 .
Racks
Note 1 : the length of fiber cable that link between new MAC and Warehouses
collection is not included because there is no obvious outdoor path for it , so
we can not calculate this length now.
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the c
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Depa
about the paths routes it may be some change in the lengthes.
Note : Please be informed that this offer doesn't include the accommodation and it will be charge on the cus
This offer will be done in one visit and any extra visit will be with extra charge
Piece 407900471 2
Piece 700206725 4
140 280
Piece 407900422 4
Piece N/A 2
FT 760002386 35 0
Bar N/A 10 0