Professional Documents
Culture Documents
MAC1 Passive
MAC1 Passive
Face Plates
Note 1 : the riser and the cable trays inside the factory will be executed
by the Engineering Department of MAC according to our requirements.
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the customer and a
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Department of MAC
about the paths routes it may be some change in the lengthes.
Note 3 : Please be informed that this offer doesn't include the accommodation and it will be charge on the customer
This offer will be done in one visit and any extra visit will be with extra charge
407900471 425
700206725 850
140 59500
407900422 850
N/A 425
N/A 88 36 3168
N/A 68 47 3196
N/A 28 53 1484
N/A 40 92 3680
Imported 3 7500 22500
415813
ge on the customer
MAC Carpets
S.N Description
Face Plates
3 Supply of LF80 .
Racks
Note 2 : the second floor (Part 2 - Gibson Board) paths should be internal paths because
it has a lot of cables - according to the recieved drawings - and these paths are not
included in the BOQ as it should be installed by the Engineering Department of MAC
according to our requirements.
Note 3 : all the lengthes of the cables are calclated according to the drawings that have been got from the c
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Depa
about the paths routes it may be some change in the lengthes.
Note 4 : Please be informed that this offer doesn't include the accommodation and it will be charge on the c
This offer will be done in one visit and any extra visit will be with extra charge
321,373
hat have been got from the customer and according
sed by the Engineering Department of MAC
S.N Description
Face Plates
3 Supply of LF80 .
Note 1 : the riser and the cable trays inside the factory will be executed
by the Engineering Department of MAC according to our requirements.
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the c
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Depa
about the paths routes it may be some change in the lengthes.
Note 3 : Please be informed that this offer doesn't include the accommodation and it will be charge on the c
This offer will be done in one visit and any extra visit will be with extra charge
Terms & Conditions :
* Prices :All prices in EGP including sales tax
* Payment :50% down payment with purchase order
40% upon delivery
10% after installation & testing
* Validity :One week
* Delivery :Within One week
pets
Date : 22/7/2008
Piece 407900471 12
Piece 700206725 24
140 1,680
Piece 407900422 24
Piece N/A 12
46,755
S.N Description
Face Plates
3 Supply of LF80 .
Racks
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the c
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Depa
about the paths routes it may be some change in the lengthes.
Note 3 : Please be informed that this offer doesn't include the accommodation and it will be charge on the c
This offer will be done in one visit and any extra visit will be with extra charge
Piece 407900471 65
Piece N/A 65
99,034
hat have been got from the customer and according
sed by the Engineering Department of MAC