Kingdom of Saudi Arabia

Client:

SCHEDULE No. 01 National Guard Health Affairs

SPLIT ROOM AIR CONDITIONERS


PROJECT NAME:

NATIONAL GUARD HEALTH AFFAIRS


7 8 9 11 12 13
COLUMN No. 1 2 3 4 5 6 10
SPECIALIZED HOSPITALS IN REGIONS
SRAC-FS-GF-01/ SRAC-FS-GF-02/ SRAC-FS-GF-03/ SRAC-FS-GF-04/ SRAC-FS-GF-05/ SRAC-FS-GF-06 & 07/ SRAC-FS-GF-08/ SRAC-FS-GF-09 & 10 SRAC-FS-GF-11/ SRAC-FS-GF-12 & 13/ SRAC-FS-GF-14/ SRAC-FS-GF-15 & 16/ SRAC-FS-GF-17/
UNIT No. SRCU-FS-RF-01 SRCU-FS-RF-02 SRCU-FS-RF-03 SRCU-FS-RF-06 & 07 SRCU-FS-RF-09 & 10
SRCU-FS-RF-04 SRCU-FS-RF-05 SRCU-FS-RF-08 SRCU-FS-RF-11 SRCU-FS-RF-12 & 13 SRCU-FS-RF-14 SRCU-FS-RF-15 & 16 SRCU-FS-RF-17
Consultants :
SYSTEM SERVED PRAYER ROOM BEDROOM LOUNGE OFFICE 015 OFFICE 016 CORRIDOR OFFICE 002 MDF ROOM PUMP ROOM ELECTRICAL ROOM PANTRY/DINING EQUIPMENT STORAGE FIRE STATION

TOTAL COOLING LOAD (KW) 3 3.1 2.1 2.1 2.7 3.2 2.1 0.6 4 3.4 2.2 13.9
1.9

COOLING SENSIBLE LOAD (KW) 2.6 3.1 2.1 2.1 2.7 3.2 2.1 0.6 4 3.4 2.2 7
1.9

HEATING LOAD (KW) 0.7 1.6 0.7 0.6 0.7 1.3 1.4 1 0.3 1.1 1.6 2.3 _

FRESH AIR FLOW (L/S) 60 25 25 25 25 65 25 0 0 0 95 80 410

36.9 36.9 36.9 36.9 36.9 36.9 36.9 36.9 36.9 36.9
N 2369600

36.9 36.9 36.9 KEY PLAN


N 2369400

1 1 2 1 2 1 1 2 1
QUANTITY 1 1 1 2
N 2369200

WITH HEAT PUMP WITH HEAT PUMP WITH HEAT PUMP WITH HEAT PUMP 1 NORMAL & 1 STANDBY _ WITH HEAT PUMP -
REMARKS WITH HEAT PUMP WITH HEAT PUMP WITH HEAT PUMP 1 NORMAL & 1 STANDBY - N 2369000

N 2368800

1) DESIGN AIRFLOWS ARE NOT ACTUAL. CONTRACTOR MUST FOLLOW THE AIRFLOW OF THE APPROVED UNIT MEETING THE SPECIFIED SENSIBLE, TOTAL AND HEATING CAPACITIES.
2) COOLING AND HEATING LOAD VALUES ARE LOAD TO BE AVAILABLE WITHIN INTERNAL SPACES. CONTRACTOR TO DERATE SELECTED EQUIPMENT TAKING INTO CONSIDERATION N 2368600

COPPER PIPING DISTANCES FROM CONDENSING UNITS TO FAN COIL UNITS TO MEET ROOM LOADS. ROOM TEMPERATURE IS 24 C. N 2368400

3) EXTERNAL STATIC PRESSURE TO BE VERIFIED BY CONTRACTOR UPON SELECTION OF ACTUAL UNIT.


SCHEDULE No. 03

E 648600

E 648800

E 649000

E 649200

E 649400

E 649600

E 649800

E 650000

E 650200

E 650400
SITE ORIENTATION
SCHEDULE No. 02
ELECTRIC WATER HEATERS
FANS
NORTH

QIBLA

COLUMN No. 1 2 3 4 5 6 7 8 COLUMN No. 1 2 3


LEGEND

UNIT No. EF-FS-RF-01 EF-FS-RF-02 EF-FS-RF-03 EF-FS-RF-04 EF-FS-TR-01 FF-FS-RF-01 FF-FS-RF-02 FF-FS-TR-01 UNIT No. EWH-T-FS-GF-01 EWH-T-FS-GF-02 EWH-T-FS-GF-03

EQUIPMENT STORAGE & EQUIPMENT STORAGE & PANTRY,TOILETS, JENITOR CLOSET


SYSTEM SERVED TOILET 004 TOILET 010 KITCHEN APPARATUS BAY FIRE STATION APPARATUS BAY SYSTEM SERVED TOILET
CAR WASHING AREA ABLUTION & SHOWER & SHOWER
CAR WASHING AREA
FIRE STATION FIRE STATION FIRE STATION
FLOOR ROOF FLOOR ROOF FLOOR ROOF FLOOR ROOF FLOOR TOP OF ROOF FLOOR ROOF FLOOR ROOF FLOOR TOP OF ROOF FLOOR BUILDING

SPECIFICATION TYPE CENTRIFUGAL INLINE FAN CENTRIFUGAL INLINE FAN CENTRIFUGAL INLINE FAN CENTRIFUGAL INLINE FAN CENTRIFUGAL INLINE FAN CENTRIFUGAL INLINE FAN CENTRIFUGAL INLINE FAN CENTRIFUGAL INLINE FAN FLOOR GROUND GROUND GROUND

AIR FLOW RATE (L/S) 425 50 175 130 760 410 460 860 STORAGE ( liters ) 200 30 220

TOTAL STATIC PRESSURE 150


150 150 150 150 250 250 150 HEATER CAPACITY ( kW ) 2.4 1.5 2.4
( Pa )

BASE TYPE BASE MOUNTED BASE MOUNTED BASE MOUNTED BASE MOUNTED BASE MOUNTED BASE MOUNTED BASE MOUNTED BASE MOUNTED QUANTITY 1 NOTES
1 1
1. THE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
ALL OTHER ARCHITECTURE, STRUCTURE, ELECTRICAL AND
ENVIRONMENT DRAWINGS.
QUANTITY 1 1 1 1 1 1 1 REMARKS - -
1 - 2. FOR GENERAL NOTES, LEGEND AND SYMBOLS REFER TO
SYMBOL & LEGENDS DRAWING.
3. FOR SITE PLANS REFER TO SITE PLAN DRAWINGS.
4. FOR MISCELLANEOUS DETAILS REFER TO MISCELLANEOUS
REMARKS - - - - - - - - DRAWING SET.
5. FOR BUILDING MANAGEMENT SYSTEM DRAWINGS REFER
TO BUILDING MANAGEMENT SYSTEM DRAWINGS SET.
6. DUCTWORK CROSSING FIRE RATED/ SMOKE RATED WALLS
1) EXTERNAL STATIC PRESSURE TO BE VERIFIED BY CONTRACTOR UPON ACTUAL SELECTION OF EQUIPMENT. 2 HOURS OR MORE FIRE RATING SHOULD BE EQUIPPED WITH
FIRE DAMPERS.
7. ALL RETURN AIR DUCT OPENINGS (RDO)/ EXHAUST AIR
DUCT OPENINGS (EDO) SHOULD BE COMPLETE WITH VOLUME
DAMPER & ALUMINUM WIRE MESH SCREEN.

SCHEDULE NO. 4 SCHEDULE NO. 5 8. ALL VAV/ CAV/ FCU SHOULD BE PROVIDED WITH ACCESS
HATCHES FOR MAINTENANCE.

FOAM PUMPS FOAM TANKS


9. DUCT BRANCHES TO BE PROVIDED WITH VD & FD AS
REQUIRED WHETHER SHOWN ON DRAWINGS OR NOT.
10. EACH HVAC TERMINAL UNIT (FCU, VAV) TO BE PROVIDED
WITH THERMOSTAT WHETHER SHOWN ON DRAWINGS OR NOT.
EXACT LOCATION OF THERMOSTAT TO BE OBTAINED FROM ID
COLUMN NO. 1 COLUMN NO. 1
PLANS.
11. ALL MECHANICAL SHAFTS AND SERVICE TO BE PROVIDED
WITH MAINTENANCE ACCESS.

UNIT No. FMP-FS-GR-01 UNIT No. FMT-FS-GR-01 12. EXACT LOCATIONS OF ALL AIR OUTLETS TO BE AS PER ID
DRAWINGS.
13. MOTORIZED VOLUME DAMPERS TO BE PROVIDED AT
FOAM SUPPLY TO FOAM SUPPLY TO SUPPLY, RETURN, RELIEF AND FRESH AIR DUCTS OF AIR
SYSTEM SERVED VEHICULE SYSTEM SERVED VEHICULE HANDLING UNITS.
14. ALL ROOMS PROTECTED BY NOVEC FIRE PROTECTION
SYSTEM SHALL BE PROVIDED WITH MOTORIZED FIRE DAMPERS
LOCATION GROUND FLOOR LOCATION GROUND FLOOR AT DUCT PENETRATIONS & WALL OPENINGS / GRILLS.
FLUID FOAM FLUID FOAM 15. PROVIDE ALUMINUM JACKETING TO OUTDOOR ALL
INSULATED PIPE WORK & DUCT WORK.

FLOW RATE (L/S) 6.7 CAPACITY (LITERS) 2000 16. FCU CONDENSATE DRAIN PIPING SHALL BE INSULATED AND
TERMINATED TO NEAREST FD.
TOTAL HEAD (M OF WATER) 15 CONFIGURATION VERTICAL 17. EXECUTION OF WORK ON SITE SHOULD BE BASED ON FINAL
DESIGN/ SHOP DRAWINGS.
MAX RPM 1450 QUANTIY 4 18. ROOM DESIGN TEMPERATURE IS AS BELOW:
GARBAGE ROOM : 18 C
BASE TYPE CAST IRON BASE REMARKS - ELECTRICAL ROOM : 27 C
IDF ROOM : 21 C
QUANTIY 2
REMARKS 1 ACTING & 1 STAND-BY

1) TOTAL HEAD TO BE VERIFIED BY CONTRACTOR


FOR CONSTRUCTION
UPON ACTUAL SELECTION OF EQUIPMENT. SEPTEMBER 2014

SCHEDULE OF EQUIPMENT- MH & MP


1
NTS

SCHEDULE No. 01 SCHEDULE No. 02


SQUARE DIFFUSERS FOUR WAY SUPPLY REGISTER

COLUMN No. 1 2 3 4 5 6 COLUMN No. 1 2 3 4 5 6 7 8 9 10 11 12 13

SCD-1 SCD-2 SCD-3 SCD-4 SCD-5 SCD-6


UNIT No. SR-1 SR-2 SR-3 SR-4 SR-5 SR-6 SR-7 SR-8 SR-9 SR-10 SR-11 SR-12 SR-13
UNIT No. RCD-1 RCD-2 RCD-3 RCD-4 RCD-5 RCD-6
ECD-1 ECD-2 ECD-3 ECD-4 ECD-5 ECD-6
DIMENSION (mm) 150X150 200X150 200X200 300x200 300x250 450x200 450X300 900X150 750X200 600X350 900X350 900X900 1200X900 0 30-09-2014 APPROVED ISSUE J.A.A.
Rev Date Description Approved
DIMENSION (mm) 600x600 600x600 600x600 600x600 600x600 600x600
Revisions
MAXIMUM AIR FLOW (l/s) 75 95 130 185 230 280 395 395 435 590 900 1300 2465
83 148 206 294 352 461
Date 30-09-2014
MAXIMUM AIR FLOW (l/s)
Job No. S14061-0100D
THROW (M) 5.0 5.8 6.6 6.6 8.7 9.6 11.5 11.5 12.1 14.1 16.3 16.3 21.3
Scale NTS
NECK SIZE (mm) 150 200 250 300 350 400
Drawn Y.S.
Designed Y.S.
THROW (m) 2.1 3.0 3.6 4.2 4.8 5.5
Checked J.A.A.
Approved N.E.
Title

SCHEDULE No. 03 SCHEDULE No. 04


EXHAUST & RETURN REGISTERS DOOR GRILLS

COLUMN No. 1 2 3 4 5 6 7 8 9 10 COLUMN No. 1 2 3 4 5 6 7 8 9

ER-1 ER-2 ER-3 ER-4 ER-5 ER-6 ER-7 ER-8 ER-9 ER-10
UNIT No. UNIT No. DG-1 DG-2 DG-3 DG-4 DG-5 DG-6 DG-7 DG-8 DG-8
RR-1 RR-2 RR-3 RR-4 RR-5 RR-6 RR-7 RR-8 RR-9 RR-10

SHAPE RECTANGULAR DIMENSION (mm) 200X150 350X150 300X250 550X250 450X450 500x500 600X250 750X600 750X750
Sheet No.

DIMENSION (mm) 150x150 200x150 200X200 300X200 300X250 450X200 450X300 750X200 600X350 900X350 MAXIMUM AIR FLOW(l/s) 37 57 85 129 195 243 324 445 561

Building Type
Project No.
70 95 130 185 235 280 425 465 655 935

Serial No.
MAXIMUM AIR FLOW(l/s)

Drawing
Phase

Trade

Rev.
Site
AIR TERMINAL SCHEDULE
2 S14061-0100D FD 3 FS MH 60001 0