You are on page 1of 1

1 2 3 4 5 6 7 8

31700

9000 9000 9000 5000


4500 4500 4500 4500 4500 4500

675
A WC
GV

LAV WC
WC
PWD GV
LAV
HE
LAV

7000
9500
B

2500
C

1 GROUND FLOOR WATERLINE LAYOUT


P-3 SCALE 1:100 M

1 2 3 4 5 6 7 8
31700

9000 9000 9000 5000


4500 4500 4500 4500 4500 4500
675

A WC WC
LAV

LAV
GV
WC
LAV

GV LAV
7000

FHC
9500

B
2500

2 SECOND FLOOR WATERLINE LAYOUT


P-3 SCALE 1:100 M

REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH
PROPOSED PROJECTS
ROMEO C. OCAMPO PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) BOD 36
STANDARD TWO-STOREY GROUND FLOOR WATERLINE LAYOUT
MANAGING PARTNER SECOND FLOOR WATERLINE LAYOUT P-3
PLUMBING DESIGN
POSITION: SANITARY ENGINEER
JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING 52
PRC No.: 000697 TIN No.: 131-678-239 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 6-CLASSROOMS )
PTR No.: 2181627 BUILDINGS DIVISION, BOD (REVISED 3-24-17)

You might also like