You are on page 1of 7

FORM PENGAJUAN BIA

Nama Pelaksana BOBY ALAMSYAH


Divisi Operasional
Tgl Pelaksanaan Project 17-Nov
PENGAJUAN DANA DI DASARKAN PADA PERALIHAN RUTE TRIP
Tanggal Diajukan : 16 November
PENGAJUAN DANA
Deskripsi Jumlah Biaya / Satuan Total Biaya

Trip Guide 12 km 8 100,000 800,000


Trip Guide 21 km 0 0 0
Porter Perahu 4 15,000 60,000
Snack peserta 25 2,000 50,000
Kerja dapur 2 75,000 150,000
Belanja dapur 1 650,000 650,000
Edwin Supir 1 50,000 50,000
Nur Gudang 1 50,000 50,000
Pepen Service Care 1 50,000 50,000
Trip Leader & foto guide 1 40,000 40,000
Bensin bak 1 100,000 100,000
Bensin motor 1 40,000 40,000
Solar 1 120,000 120,000
Angkot 2 75000 150000
Kelapa 25 5,000 125,000
Admin 1 50,000 50,000
Sewa bak 2 130,000 260,000
Freelance lalay 1 50,000 50,000
TOTAL 2,795,000
GAJUAN BIAYA PELAKSANAAN KEGIATAN

Jumlah Tamu Rafting Trip Pagi


Jumlah Tamu Rafting Trip siang 15
Jumlah Tamu Menginap

Tanggal Dilaporkan :
LAPORAN PENGGUANAAN DANA
Deskripsi Jumlah
TOTAL Pengeluaran
- Sisa Operasional
Sisa Uang Operasional ( MINUS )
ANA
Biaya / Satuan Total Biaya

Uang Operasional :
Sisa Operasional :

Catatan :

.
-
-
-
0

You might also like