You are on page 1of 7

FORM PENGAJUAN BIA

Nama Pelaksana BOBY ALAMSYAH


Divisi Operasional
Tgl Pelaksanaan Project 18-Nov
PENGAJUAN DANA DI DASARKAN PADA PERALIHAN RUTE TRIP
Tanggal Diajukan : 16 November
PENGAJUAN DANA
Deskripsi Jumlah Biaya / Satuan Total Biaya

Trip Guide 12 km 7 100,000 700,000


Trip Guide 21 km 0 0 0
Porter Perahu 3 15,000 45,000
Snack peserta 15 2,000 30,000
Kerja dapur 1 75,000 75,000
Belanja dapur 1 300,000 300,000
Edwin Supir 1 50,000 50,000
Nur Gudang 1 50,000 50,000
Pepen Service Care 1 50,000 50,000
Trip Leader & foto guide 1 40,000 40,000
Bensin bak 1 100,000 100,000
Bensin motor 0 0 0
Solar 1 120,000 120,000
Angkot 0 0 0
Kelapa 10 5,000 50,000
Admin 1 50,000 50,000
Sewa bak 0 0 0
Freelance lalay 0 0 0
TOTAL 1,660,000
GAJUAN BIAYA PELAKSANAAN KEGIATAN

Jumlah Tamu Rafting Trip Pagi 7


Jumlah Tamu Rafting Trip siang
Jumlah Tamu Menginap

Tanggal Dilaporkan :
LAPORAN PENGGUANAAN DANA
Deskripsi Jumlah
TOTAL Pengeluaran
- Sisa Operasional
Sisa Uang Operasional ( MINUS )
ANA
Biaya / Satuan Total Biaya

Uang Operasional :
Sisa Operasional :

Catatan :

.
-
-
-
0

You might also like