Professional Documents
Culture Documents
This form is a checklist for the control of the Clean Water Tank and related Drainage Pipe System.
The checks are carried out on a monthly basis and are more frequent during monsoon season. The
tank will be inspected annually or immediately in case of leakage.
Please fill in white cells.
Date of Check:
NOTES
*Measurements from calibrated gas meter
Parameter Reading: Target
O2 [%] 21%
Signatures
COPY OF THE DOCUMENT MUST BE RETAINED FOR MIN. 3 MONTHS AFTER LAST CHECK.