Instrumentation Inspection and quality Control Questioner
4, what is QA/QC?
Ans: QA/QC means Quality assurance/quality control the purpose of this
(QA/QC) is to establish the sequence of requirement for the quality of the
material , quality of works its inspection and records.
2 What are basic responsibilities of QA/QC person?
Ans : To ensure execution of works and comply fully as per standard and
approved specs.
3, What are the basic required document for QA/QC personal?
Ans:The basic required document for QA/QC personal are as following:
ITP: To conduct he quality check(inspection/witness/surveillance) etc.
WP: Standard procedure to execute the works.
PID: As a reference to ensure that the work is as per standard drawing.
MTC: To ensure that material complies the PES standard specs.
Calibration report:TO ensure parameters are function check as per IDS.
PP: To ensure that the instrument HOOK-UP: To ensure that the remote
connection of pneumatic is done correctly.
are installed as per P&ID and PP as per convenience.
WIRING DIAGRAMS: To ensure that wiring is done correctly.
ILD: To ensure that the sequential wiring is done correctly.
IDS/ISS: To ensure that instruments comply with the basic requirement.
RFI: TO conduct the inspection of completed work.
QR: To maintain the quality records of completed works etc.
QCO: To issue a warning in case of little violation and observation.
NCR: TO issue warning in case serious violations of standard.4,What are QA/QC,s ITP,s andQCP ?Give abrief?
Ans: ITP-This procedure informs about the kinds of quality
check(surveillance, inspection,witness or hold points)means quality of works
is being done in proper sequences
QCP-This procedure addresses the activity and requirement in details.
5,What is NCR?Why does it need for a QA/QC personal?
Ans: NCR means non-compliance report, QA/QC personal have reserve the
right to issue a warning if the contractor does not comply or violate with the
standard procedure.
6,What are general work procedure(WP)?
Ans: The general sequence of activities will be as follow:
:Receiving drawing and documents.
:Reproduction of drawings.
issuing of drawing to site.
:New- issuing new revision.
:Shreading of drawing.
sRer line drawing.
:Transmittal of redlines to client(as-built)
:Work permit perior to start the work.
:Record.
7,What are the common PPE required?Give a brief?
Ans:Following are the PPE for a safe and quality works standard procedure;
Qualification:Awamess about all kinds of safety std/codes and work
procedure.Experience:Qualify the work execution.
USE PPE:Proper equipment and tools shall be used to avoid injuries/loss.
Safety shoes, Helmet,Glass,Gloves,Ear plug,Harness and proper tools and
certified equipments.
8, What is redlining? Briwf its color codding?
Ans: In case of any change occurred to the standard approved drawing while
thee project is being constructed or testing the relevant drawing will be “red
ined” following color codng shall be used for purpose.
Red: If any addition required in the drawing.
Green: If any deletion is required from the drawing.
Blue. If any comment is added.
9, What is difference between inspection (Surveillance), witness and hold
point?
Ans: Inspection: Work can be execute without clients inspection and it can
be inspected some of them if it required.
Witness: Work can be execute, without clients inspection and then it can be
inspected upon the completion of work.
Hold point: Work cannot be execute without clients inspection.
10, What is difference between hazardous and non hazardous area?
Ans: Hazardous; \a hazardous location is defined as an area where a potential
for fire or explosion exists due to the reasons of flammable gases, liquid or
vapors, combustible dust or fiber and flying in sufficient quantities to
produce an explosion or ignitable mixture.
Non Hazardous: An area where no risk of presence of any kind of explosion.44. What are different kinds of certification?
Ans: weather proof, Dust proof, Water tight, Explosion Proof, Frame proof,
Intrinsic safety proof etc.
42, What is 1S0? Explain some of its standards?
Ans: ISO means International Standard Organization, some of them are
1S0:9001, ISO 9002,ISO 003 etc.
13. What is Zone Classification? Give a brief?
Ans: Zone Classification is to define the area of hazards, they are
Zone-0: A Zone in which an explosion gas/air mixture is continuously present
or present for extended periods, during normal operation.
Zone-1: A zone in which an explosion gas/air mixture is not likely to occur in
the normal operation.
Zone-2: A Zone in which an explosive gas/air mixture is not likely to occur in
normal operation and, if it occurs, it will only exit for short time.
Zone-0: A zone in which an explosion dust atmosphere is present
continuously or for extended periodof time.
Zone-14: A zone in which there is likelihood that explosive atmosphere may
occur for short periods due to unsettled dust layers.
14, What are area classification? Give brief?
Ans::A zone classification is to define the area of hazards, they are as below,
Zone-0:A zone in which an explosion gas/air mixture is continuously
present or present for extended periods, during normal operation.
Zone-1:A zone in which an explosion gas/air mixture is likely to occur in
normal operation.
zone in which an explosion gas/air mixture is not likely to
only exists for a shot
Zone-21
occur in the normal operation and,if it occurs ,it
time.Zone-10:A zone in which explosive dust atmosphere is continuously or for
extended periods of time..
Zone-14:A zone in which there is a likelihood that explosive atmospheres
may occur for shorts period due to unsettled dust layé
15, What are area classification 7Give a brief?
Ans:As per NEC and NACA, following are the hazards classification,
Class1:Location in which flammable gases or vapors may be present in the
atmosphere in quantities sufficient to produce explosive or ignitable mixture.
Glass‘ gases/vapors are divided into four following groups:
GroupA-Present of Acetylene.
GroupB-Present of Hydrogen, butadiene,ethylene oxide etc.
GroupC-present Ethylene,cyclo-propone,carbon mono-oxide etc.
GroupD-Present of gasoline, acetone,butane,propone,alcohol,natural
gas(METHANE)
CLASS2:Location in which the presence combustible dusts are in the air in
sufficient quatity to ignite or explode.
Class 2 conductive non-conductive are divided into three as below
GroupE-presence of metal dusts(aluminium,magnesium and chemical dust
etc).
GroupF-Presence of black carbon ,charcoal,coal or coke dust etc.
GroupG-Presence of non-conductive dust(foam,starch,combustible plastics
etc).
CLASS,3:location in which easily ignitable fibers or flying are present but are
not likely to be in suspension in air in quantities sufficient to produce
ignitable mixture.
Division-1: The hazard are present countinuously or periodically under normal
operation condiDivision-2: The hazard are only presents during accidental or abnormal
condition.
16, What are the standard height to install the instrument?
Ans:-Standard height install the instrument is 14,meters,but it can vary less
or more as per locations’s convenience.
47, What are the standard nozzle orientation for process contro! system?
Ans(a)Gas service-It should be 45 degree side of the pipe or vertical.
‘A
Figure:
(b)Liquid service Horizontal or 45 degree below of either pipe.
ree 9 |
(c)Steam service- Horizontal or above it 45 degree either side of pipe.
Figure:-
NI
18,What is loop check?
Ans:-To ensure that the system wiring from field to control console
functioning fine.49, What is different between open-loop or close-loop?
Ans:-Open -loop:A loop system which operates direct without any feedback
and it generates the out put in response to an input signal.
Close-loop :A loop system which uses a measurement of the output signal
through feedback and a comparison with the desired output to generate and
error signal that is applied to the actuator.
20, What is feed forward and feed back ward control system?
i/o
24, What is logic gate?
h one or more input voltage but only one output
Ans:-A digital logic circuit
voltage.
22, What is foundation fi
Idbus system?
Ans:-A fully digital control system is called foundation fieldbus system.
23, What are meant by FAT,SAT,RAT?
Ans:-FAT-Factory acceptance test,SAT-site acceptance test,RAT-Run
acceptance test.24, What is micro processor control system? Give a brief of PLC, DCSand
SCADA?
‘Ans:-Computer based control processor system is called micro processor
system.
‘The brief of PLC,DCSand SCADA are as following:
PLC-prgramable logic control system,PLC’s are used in practice with the aim
of achieving higher degree of availability or fault tolerance.The types are as
follow:
Fault tollerent-1 out of 2 system objective: Reduce the probality of losses of
production by switching to a stand by system.
Fail Safe: 2 out of 2 system objectives : Protect life, the environment and
investment by safely disconnecting to a secured “off” position
DCS: Distributed Control System.
SCADA: Supervisory control and data acquisition.
25, What are inspection point for a tray installation?
Ans, Material check as per approved specification, size and type, trays hook-
up, proper distance structure, tray to tray (I e) power /control /and signal! low
voltage and high voltage, support and fixed strongly not shaking.
26. What are inspection points for field instruments with impulse tubing?
Ans: Material check as per approved specification, material size and type,
installation as per hook up, check line route to avoid any obstruction, check
tube bending, and check tube support, compression fittings of ferrules, and
then pressure test shall be done.
27, What are inspection point for cable laying?
Ans, Material check as per approved material, types and size, meggering,
cable routing drawing, completion of cable route( trays, conduit or trenchetc), and cable numbering, cable bending, use of proper tools and
equipments for cable pulling.
28. What are inspection points for JB and marshalling cabinats?
Ans. Material inspection, size, type as per approved specification,
installation hook-up for frame, bracket or stands, fixed properly means
shaking free, name plate and tag number.
29, What are standard method of ferrules addressing to and from a JB?
Ans. For two side terminal address required which shall be closed to terminal
either side and complete information shall be of from side after or before as
per left and right side.
30, What are standards of installing a DP Transmitter in GAS service and
why?
Ans, Installing DP Transmitter in GAS service shall be above the process to
avoid the malfunctioning and drain the liquid(condensate)into the process
easily.
31. How do you determine the correct installation of flow orifice?
Ans. The orifice data shall be punched in the up stream of orifice, the data
side shall be in the up stream of flow direction .
32. Explain why shield of signal cable is not earthed on both side?
Ans.To avoid the current noise(resonance).
33,What is final RFI?When it shall be raised up?
Ans. When the QA/QC department of contractor is satisfied that the work
details in the construction RF! is completed ,then request shall be submitted
for inspection to the client QA/QC department.
34,What the required document for an inspection?
Ans.Following are the required for an inspection:
-RFl(request for inspection)-Pand ID for line verification
-PP for location
‘Wiring diagram for wiring details
-Data sheet for calibration and pressure test
-Hook-up etc for remote tubing/air line
-QR for maintaining record
-WP, work procedure,to check each and every steps as per specification
-QCO, for issuing incase of little violation
-NCR, for issuing incase of major violation etc.
35,What are the required document for a remote loop folder?
Ans. Following are the required document for a remote loop folder,
-Loop package check list
-ILD(instrument loop diagram)
-Instrument loop acceptance record(UR test record)
-P and 1D(piping and instrument diagram)
-ISS/IDS(ins.spec.sheet/data sheet)
-Alarm list
-Calibration record(TR)
-Cable meger report(primary to pulling)
-Cable meger report (secondry after pulling)
-Pressure test record(IR)
-MC check record(remote loop)(green col
-MC punch listLoop check punch list.
36,What are the required document for a local loop folder?
Ans. Following are the required document for a local loop folder,
-Loop package check list
-ILD(if not mechanical loop)
-Cable meyger report(primary prior to pulling) if not mechanical loop
-Cable megger report(secondary after pulling) if not mechanical loop
-Alarm list(if not mechanical loop)
-P&ID
Iss/IDS
-Calibration report(TR)
Pressure test record(TR) if required
MC check record(local loop)(green color)
-MG punch list
-Visual check punch list/loop check punch list
37. What is schedule Q?
Ans, Schedule Q is attachment to the contract, which is the provision of
Quality Assurance and Control, Inspection and Test Plan
38. What are the various levels of inspection? Explain
Ans. They are
a- Level 0- Document required only, no inspection
b- Level-1 Inspection prior to shipping
¢ Level-2 Minimum requirements, pre-inspection meetings, one or more
d “in progress” surveillance visitsLevel 3- Same as level 2 except that “in progress” surve
inspection shall be in regular basis
e- Level 4- Resident Inspector continuously monitor the works
-Level inspection for construction phase:
a- Hold points(H) The inspection activity will not proceed without the
presence of inspector
b- Witness Points(W) Inspection activities can be proceeded after issuing
RFI.
c Review (R) Verification of documentation (NMR) on its correctness as per
spec approved drawings
d- Surv
without Client Inspection
jance (S) Inspector has right to conduct random inspection of works
39. What is !TP’s? What are hold and witness point?
Ans, ITP mean Inspection test plan, details of work scope and required types
of inspections.
Hold point (H) is the level of inspection that client inspection must require
through RFI and cannot proceeded until inspection is done by client
Witness Point(W) is the level of inspection that inspection activity can be
proceeded without ciient inspection or if ciient is not available as per RFi
timing
40. What is RFI ? When an RFI will be raised 7
Ans. Request for Inspection (RFI), RFI shall be raised only when the status of
the preliminary inspection is satisfactory, and the works (items) are HOLD or
Witness Points.