Mounting instruction of Vibration Damper
T, Calculated and marked installation location bi, b2, b3 on the Cable.
2. If the position that decided
of dead-ends or suspensions,
in step 7 is out of the Armor rods
you should installation the rods of
Vibration Dampers. Position the armor rods parallel to the cable
so that the alignment mark on the Armor rods is next to the
cable reference mark installed in step 1, ou can wrap the rods
individual, you can make the loose individual rods into subsets
Consisting of 2 or 3 rods and wrap it. The gpace between the
fittings and vibration damper should not less than 70mm.
3,Loose the screw from keeper, PLACE THE BIGGER
DAMPERING-WEIGHT CLOSE TO TOWER OR POLE.
osition the clamp body on the first location bt.
4, Tighten the bolt. First vibration damper installed.
5. Repeat step 4 for the remaining vibration dampers.
bs
paca ZOE Pe
aby
bi
6, Make sure the vibration dampers are right. Completed.
How to use:
LThe lower frequency damping weight (bigger dar
weight) of installed Vibration damper should close to
pole/tower.
2.You can select vibration damper and armor rods type
from select-information by cable diameter, Confirmed
quantity per span by cable operation tension, span and
landform. Generally, the principle is as follow:
‘Vilbration Damper is not needed where the tree height is
_-Lnigher than the hanged point and cable line goes along
ihe valley lowland, because the OPGW cable, is not
effected by cross wind.
“A unit of Vibration Damper per span is needed in the
living area, mountain area or low woods.
“The specfication as following in the widen and plat
area:
3, Installation distance can be calculated by following
expressions: recite
Distance for the first vibration damper
*b,=0.9~0.95_4 ra (where, the coefficient has
007” Vin
a range in order to that the bis a whole number.)
Where b;—distance for the first vibration damper, in
meter(m);
d—OPGW Cable diameter, in millimeters‘
‘v—wind speed that plumb to OPGW Cable, in
meters per second ( m/s); usually equal to 6m/s;
T—OPGW Cable tension (average operating
Tension or 25%RTS), in Newton (N):
‘m—OPGW weight, in kilogram per meter (Kg/m)
+ Distance for the second vibration damper: bz =1.75bs
+ Distance for the third vibration damper: bs =2.50b:
Saris San ana
faa cetera roees ye| re oe between the end of suspension or
om)_| ee) | |_| | deattend armor rods and vibration damper rods should
120