You are on page 1of 1

N

15

NP. LCSS UHL102


UHF006

+ER03 UHL001

15

+5500 +5500

+5500

-40 -40 -40

-40 -40

-840

-840

-2500 -2500

-2500

1. "P" STANDS FOR "POWER CKT."


2. "C" STANDS FOR "CONTROL CKT."
3. ``IC" STANDS FOR INCOMING CIRCUIT M. N. DASTUR & COMPANY (P) LTD
4. ``OG" STANDS FOR OUTGOING CIRCUIT
5. 75x10mm G.I STRIP FOR EARTHING PURPOSE SHALL BE INSTALLED ALONG THE CABLE TRAY CONSULTING ENGINEERS, KOLKATA
6. IN SOME CASES, POWER CABLES MAY HAVE TO BE PARTIALLY LAID IN DOUBLE LAYER IN CABLE TRAY DUE TO
SPACE LIMITATION. 1:1 GPH ISPAT LIMITED
7. CONTROL CABLES WILL BE LAID IN 2 - 3 LAYER IN CABLE TRAY.
8. CABLE TRAY SUPPORT SHALL BE PROVIDED @1500mm FOR HORIZONTAL RUNS & @1000mm
CHITTAGONG,BANGLADESH
FOR VERTICAL RUNS.
9. 300mm GAP SHALL GENERALLY BE CONSIDERED BETWEEN TWO CABLE TRAYS INSTALLATION OF 0.8 MTPY INTEGRATED STEEL PLANT PROJECT
10. ALL BENDS SHALL HAVE 600mm BENDING RADIUS AT THE INNER SIDE OF BEND
CABLE ROUTING IN ROLL SHOP

28763 28763-60A-VBB-ELE-3006 0