KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Annexure A
PROJECT DATA FOR PRUDENCE CHECK
Name of the ESCOM: KPTCL
Zone + Tumakuru
Circle + Davanagere W & M circle
Division + Chitradurga MW division
Location : Konasagara
Work Code 81100
Project Description Establishing 1X12.8, 66/11KV Sub-Station with associated line
Date of Sanction 22-May-19
Estimated Cost Rs, 902.0 Lakhs
Awarded Cost + Rs.977.23 Lakhs
Date of Work Award 12-May-20
Date of Commencement ——:-28-May-20
Targeted Date of Completion: 11-May-21
‘Actual Date of Completion: 10-Dec-21
BRIEF DESCRIPTION OF THE WORK
|. Briefly record the reasons (circumstances necessitating) for taking up the work.
: Presently.the areas in and around Konasagara are fed by 1 No. Of 11kV feeder each from 66/1 KV B.
G.Kere Sub-Station,Hangal Sub-Station and Gowrasamudra Sub-Station,
: The installed capacity of 66/1 1kV BG Kere Sub-Station is 1"12.5 MVA,66/11KV Hangal Sub-Station is
2°8 MVA and 66/1 1kV Gowrasamudra Substation is 1°6.3 MVA +1"8 MVA.
. Existing 66kV Gowrasamudra SC line emanating from 220KV Thallak Sub-Station has recorded peak
oad of 10 MW with Coyote conductor. The installed capacity of 220kV Thallak is 2° 100MVA with peak load of
120 MW.
Il. What was the Primary/Major objective or the purpose intended to be achieved! Results to flow from the
work? Please quantify the results intended (Ex:Meeting the load of ....MVA/KVA)
. ‘There will be reduction in the length of 11KV feeders feeding that area which reduced the interruptions.
: Tail end. voltage of these 11kV feeders will also improve.
: Future load growth can be catered.
: ‘There will be improvement in voltage profile of the areas fed from the proposed 66/1 1kV Konasagara
‘Sub-Station.
IIL Whether the primary objective / Results of the work was intended to be achieved in full on completion of
the work or was it meant for a phased realisation7a. To be achieved in full on commissioning b. To be
achieved in phases of 1st Yea 2nd Year :..uj 3rd year: ....% and $0 on.
Intended to be achieved in ful on Completion
20% achieved as on date,
‘any, to be achieved and the time planned for such achievement:
IV, List other intended objectives,
= name ote Objective ee |
June 17, 2022 Page 1 of 41
2
|| aeons
4]
@ ‘The load on the existing 66/T1KV BG kere
langal and Gowrasamudra substations will
\V. Planning of Expenditure:
| S| amount att)
[Ty seams poataa
(Zils Oc =
a niall
la oo] Suns oun |
sp wa |
Vi Details of financing plan for the project undertaken, if any. Else Please provide the sources from which
the funds were diverted
Commercial Bank,
provided, Mention the basis on which
Vil. Provide the list of alternatives considered. Ifthe alternatives at
the proposed scheme is finalised
Alternative-t
in the proposal, bifurcation of 11KV lines by express/ink lines using Rabbit ACSR from existing 66/1 1kV
‘Sub-Stations at BG Kere, Hangal and Gowrasamudra are studied.
‘After bifurcation of load, the regulations cannot be brought down to permissible limits.
List of basis on which proposed scheme is finalised.
{Total load on proposed 1°72.5 MVA Konasagara sub-station will be 6962 KVA
2.Proposed for construction of 66RV SC line from existing 66kV Gowrasamudra Substation for a distance of 7km
‘along with construction of 1 No. Of 66KV Terminal bay at 66KV Gowrasamudra.
3.Annual energy savings willbe 3.1254 MU.
4.-Approximate cost of the project is Rs 609.08 Lakhs.
S.BCR will be 2.53.
Vill, Details of Cost Benefit Analysis and Payback period calculations. Whenever projects were taken up
with CBA < 1 or Payback period higher than 5 years, specify reasons for taking up the same
‘Annual Energy savings 3.1254MU and 4.26/30 Years
PERFORMANCE EVALUATION
Project Performance | Results in terms of the Objectives
|. Cost Data Analysis:
| Sanctioned/ Awarded Cost of Estimate : Rs.977.23
Actual Expenditure + Rs. 683.75
Comparision of actual expenditure Vs SanctionediAwarded Cost ——;_-Rs. 293.48 Less
Variation in % of the cost of Sanctioned estimate /Awarded Cost 1-30.03 %
Romarks : Financially not closed
June 17, 2022 Page 2 of 4I. Schedule of Implementation
Targeted date of
completion as
Actual Date of Completion Per Detailed Work Order; 11-May-21
+ 10-Deo-21
Time Overrun
: OYears 7 Months
Reasons for dela f
delay/ delays y, If any, as ascertained (describe reasons attributable for project delay! justification for
; vs atbutable to Contractor or Licensee ) :
'e 11KV PCVCB P.O was issued |
Ltd Bangalore ts deloyoa sued to M/s MEI Itd, Bangalore. The 11KV PCVCB supplied by M/s MEI
Swners/ 1,22 in completion of transmission line works were due to severe ROW issves, protest by the land
9 farmers and almost unreasonable demands lke demanding more than the KPTCL orders.
he delay due to Ist wave and lind wave Covid-19 pandemic, there is a considerable delay in the
execution ofthe project.
lil. Primary Objective (Quantitative description . Ex : Demand in MVA met
te)
Actual Achievement after Completion: 90.0
Load taken on 12.5 MVA transformer is 5 MW
IV. Other Objectives realised till date
si ~]
No BS Quantity, ‘Plan achievement
aa ip 0.0 0.0
Z| E 00 oo]
ray = rs
|4 | Be ara8 0.0 0.0
1B TThe load on the existing 66/1 TRV BG kere Mangal and | 330/390
Gowrasamudra substations will be reduced i)
‘Observations on outstanding features/ Major problems in the design / implementation of the project :
19 pandemic, there is a considerable delay in the
: ‘The delay due to Ist wave and lind wave Covi
execution of the project .
: The delay in completion of transmission line works were due to severe ROW issues, protest by the land
owners! farmers and almost unreasonable demands like demanding more than the KPTCL orders.
V. Capitalisation / Asset Categorisation :
Status of Accounting and Categorisation
‘Amount of ‘Amount of
Date of Asset | Amountof asset | gorreciation mount
si le tergorisation(in | Categorisation(In
pacts a charged(In Rs. capitalised (In Rs.
[No
Remarks
| Re.Lakhe) | ReLakhs) | SPAGEANO RS [oP |
ee eo oo] «(00
tie or: | aay Ona 0.0 0.0
- |_00 00 00
31-Mar-22, 683.27 «| 14.42 8.02 (51.26 €
je} | Lakhs
|
| tree cut compansation/employee
| | Costiterest curing
‘construction/DEPT MENT |
I UPPLY/SURVEY
June 17, 2022 Page 3 of 4[EXPENSES/CONTINGENCY
Observations on asset categorisation and capitalisation:
es ‘sotive Engineer (Ble) Stoned
ajor Works Sub-Division Executive Engineer (Ele)
KPTCL, Chitradurga Major Works Division
KPTCL, Chitradurga
June 17, 2022
Page 4 or4Salas POWER TRANSMISSION CORPORATION LIMITED
Annexure B
SCORING OF PRUDENCE CHECK PROJECT
Work Code + BC1100
Place : Konasagara
Project Description: Establishing 1X12.5, 66/1 1kV Sub-Station with associated line
Maximum] Marks- | Marks-
Pai 1C Remarks
some Marks | Division | TAQC Tecan
ie
| Planning
Investment Proactive or] 5
Reactive
DPRand Cost Benefit | E
‘Analysis,
t
Alternatives 5 5
| implementation
‘Schedule Of = ;
implementation “|
Cost Ofimplementation | 10 | 10 |
fe |
‘Quality OF Execution 10 | 100
Ex-Post Analysis
chievement of Primary] 9 | 450
bjective
[achievement of Other | 4g | gg
‘Objectives
Total | 100 | 92.80
Asst Exog hve Engineer (Ele) Execttive hears —
Divisi Major Works Division
Seer Hedda oe KPTCL, Chitradurga
June 17, 2022