PROYECTO: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y
OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
UBICACIÓN:
Localidad: AJOYANI CENTRAL, CHAQUEYLLA, JARUMA CHAQUELLA, JARUMA SALLANI, JARUMA SORA, PRADO ESPERANZA, HUALCA, KANAKATA
Distrito: PALLPATA, OCORURO
Provincia: ESPINAR
Depart.: CUSCO
ENTIDAD: MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO
PROGRAMA NACIONAL DE VIVIENDA RURAL
PROYECTISTA: ING. GONZALO VICENTH HUARCAYA PORTILLA TO N° VIVIENDAS: 63
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
01. 01. 01. LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
01. 01. 02. EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR PREVIO AL INICIO A OBRA glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
01. 01. 04. SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO EN EL CENTRO DE TRABAJO glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
01. 02. 01. PROCESO PARA INICIO DEL TRABAJO glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
02. 01. 02. EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 6.77 426.61
E-01 A Longitud de excavación de zanja 1.00 5.63 0.40 0.60 1.35 63.00 85.05
E-01 A' Longitud de excavación de zanja 1.00 3.01 0.40 0.60 0.72 63.00 45.51
E-01 B Longitud de excavación de zanja 1.00 5.63 0.40 0.60 1.35 63.00 85.05
E-01 C Longitud de excavación de zanja 1.00 3.02 0.40 0.60 0.72 63.00 45.59
E-01 1 Longitud de excavación de zanja 1.00 3.78 0.40 0.60 0.91 63.00 57.15
E-01 2 Longitud de excavación de zanja 1.00 3.38 0.40 0.60 0.81 63.00 51.11
E-01 3 Longitud de excavación de zanja 1.00 3.78 0.40 0.60 0.91 63.00 57.15
01. 05. 02. SUMINISTRO DE PIEDRA MEDIANA (APORTE) glb 2.26 142.20
E-01 A Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 A' Longitud de nivelacion de cama de piedra para muro 1.00 3.01 0.40 0.20 0.24 63.00 15.17
E-01 B Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 C Longitud de nivelacion de cama de piedra para muro 1.00 3.02 0.40 0.20 0.24 63.00 15.20
E-01 1 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
E-01 2 Longitud de nivelacion de cama de piedra para muro 1.00 3.38 0.40 0.20 0.27 63.00 17.04
E-01 3 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
03. 01. 03. NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA ( APORTE) m3 2.26 142.20
E-01 A Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 A' Longitud de nivelacion de cama de piedra para muro 1.00 3.01 0.40 0.20 0.24 63.00 15.17
E-01 B Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 C Longitud de nivelacion de cama de piedra para muro 1.00 3.02 0.40 0.20 0.24 63.00 15.20
E-01 1 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
E-01 2 Longitud de nivelacion de cama de piedra para muro 1.00 3.38 0.40 0.20 0.27 63.00 17.04
E-01 3 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
E-01 3: C-A' Longitud de sobrecimiento para muro 1.00 3.22 0.25 0.35 0.28 63.00 17.75
PLANILLA DE METRADOS
PROYECTO: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y
OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
UBICACIÓN:
Localidad: AJOYANI CENTRAL, CHAQUEYLLA, JARUMA CHAQUELLA, JARUMA SALLANI, JARUMA SORA, PRADO ESPERANZA, HUALCA, KANAKATA
Distrito: PALLPATA, OCORURO
Provincia: ESPINAR
Depart.: CUSCO
ENTIDAD: MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO
PROGRAMA NACIONAL DE VIVIENDA RURAL
PROYECTISTA: ING. GONZALO VICENTH HUARCAYA PORTILLA TO N° VIVIENDAS: 63
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
04. 01. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 11,521.44
E-01 Calculo de Acero Corrugado 1.00 182.88 63.00 11,521.44
04. 02. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS kg 5,632.20
E-01 Calculo de Acero Corrugado 1.00 89.40 63.00 5,632.20
06. 02. 00. CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 6.15 387.64
PLANILLA DE METRADOS
PROYECTO: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y
OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
UBICACIÓN:
Localidad: AJOYANI CENTRAL, CHAQUEYLLA, JARUMA CHAQUELLA, JARUMA SALLANI, JARUMA SORA, PRADO ESPERANZA, HUALCA, KANAKATA
Distrito: PALLPATA, OCORURO
Provincia: ESPINAR
Depart.: CUSCO
ENTIDAD: MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO
PROGRAMA NACIONAL DE VIVIENDA RURAL
PROYECTISTA: ING. GONZALO VICENTH HUARCAYA PORTILLA TO N° VIVIENDAS: 63
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
08. 02. 00. SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10 m2 54.53 3,435.38
Area total interior 2.00 3.60 1.95 14.04 63.00 884.52
2.00 3.60 1.95 14.04 63.00 884.52
2.00 3.68 1.95 14.35 63.00 904.18
2.00 2.07 1.95 8.07 63.00 508.60
6.00 0.78 0.86 4.02 63.00 253.56
0.00
08. 03. 00. BRUÑAS DE MUROS DE LADRILLO m 284.96 17,952.62
Longitud total de bruñas m x m2 7.00 2.04 1.95 27.85 63.00 1,754.30
7.00 2.04 1.95 27.85 63.00 1,754.30
7.00 1.56 1.95 21.29 63.00 1,341.52
7.00 0.78 0.86 4.70 63.00 295.82
7.00 2.45 1.95 33.44 63.00 2,106.88
7.00 1.25 1.95 17.06 63.00 1,074.94
7.00 0.78 0.86 4.70 63.00 295.82
7.00 1.25 1.95 17.06 63.00 1,074.94
7.00 1.36 1.95 18.56 63.00 1,169.53
7.00 1.33 1.95 18.15 63.00 1,143.73
7.00 1.23 1.95 16.79 63.00 1,057.74
7.00 0.78 0.86 4.70 63.00 295.82
7.00 1.56 1.95 21.29 63.00 1,341.52
7.00 1.00 2.76 19.32 63.00 1,217.16
7.00 1.00 2.76 19.32 63.00 1,217.16
7.00 1.00 0.72 5.04 63.00 317.52
7.00 1.00 0.56 3.92 63.00 246.96
7.00 1.00 0.56 3.92 63.00 246.96
09. 00. 00. REVOQUES
09. 01. BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON MORTERO 1:4 E= 1.5 CM m2 0.70 44.23
Bota agua en vanos de ventana 3.00 0.78 0.3 0.70 63.00 44.23
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
A-01, D-03 C: 2-4 Area interior -Dormitorio 02 5.38 1.00 5.38 63.00 338.94
11. 03. 00. PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO m2 19.90 1,253.70
A-01, D-02 C: 2-3 Area interior -espacio social 1.00 9.51 9.51 63.00 599.13
A-01, D-02 C: 2-3 Area interior -Dormitorio 01 5.01 1.00 5.01 63.00 315.63
A-01, D-03 C: 2-4 Area interior -Dormitorio 02 5.38 1.00 5.38 63.00 338.94
12
### 0 0 VEREDAS
12. 01. 00. NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (APORTE) m2 2.40 151.20
A-01 2-3:A-B Area exterior frontal para vereda 1.00 2.40 1.00 2.40 63.00 151.20
12. 02. 0 VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO FROTACHADO INCLUYE BRUÑADO m2 2.40 151.20
A-01 2-3:A-B Area exterior frontal para vereda 1.00 2.40 1.00 2.40 63.00 151.20
13. 02. 00. CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M m 16.92 1,065.96
Long dorm 01 8.26 8.26 63.00 520.38
Long dorm 02 8.66 8.66 63.00 545.58
14. PUERTAS
14. 01. 00. PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 1.00 63.00
A-01, D-08 Puerta Exterior P1, incl instalacion. Según lo indicado en planos 1.00 1.00 1.00 63.00 63.00
14. 02. 00. PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 1.00 63.00
A-01, D-09 Puerta Interior P2 , incl instalacion. Según lo indicado en planos 1.00 1.00 1.00 63.00 63.00
14. 03. 00. PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 2.00 126.00
A-01, D-10 Puerta Interior P3, incl instalacion. Según lo indicado en planos 2.00 1.00 2.00 63.00 126.00
15. VENTANAS
15. 01. 00. VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON CONTRAVENTANA DE MADERA und 3.00 189.00
Ventana de aluminio, incl instalacion. Según lo indicado en planos 3.00 1.00 3.00 63.00 189.00
###
17. 00. 00. EVACUACION AGUAS PLUVIALES
17.### 01. 0 SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 2.00 126.00
Sistema de evacuacion de aguas pluviales (Canaleta y montante) 2.00 2.00 63.00 126.00
17.### 03. 0 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION m3 2.76
Volumen de dados de concreto 2.00 0.25 0.25 0.35 0.04 63.00 2.76
19. ACARREOS
19. 01. ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE) 0 1.00 63.00
Global 1.00 1.00 63.00 63.00
20 0 0 FLETES
20 01. 0 FLETE Y TRANSPORTE DE MATERIALES
20. 01. 01. FLETE TERRESTRE TRANSP. MATERIALES DEL PROVEEDOR AL ALMACEN (INCL. CARGA-DESCARGA) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 01. 02. FLETE TERRESTRE TRANSP. MATERIALES DE ALMACEN A PUNTA DE CARRETERA (INCL. CARGA-DESCARGA) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 01. 03. FLETE RURAL DE MATERIALES PUNTA DE CARRETERA A VIVIENDA (APORTE) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 01. 04. ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE MATERIALES PUNTA DE CARRETERA A VIVIENDA (APORTE) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 02. 02. FLETE TERRESTRE TRANSP. PIEDRA DE CANTERA A PUNTA DE CARRETERA (INCL. CARGA-DESCARGA) 0.00 1.00
Ver calculo de flete de agregados y piedra. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 02. 03. FLETE TERRESTRE TRANSP. DE AGREGADO Y PIEDRA DE PUNTA DE CARRETERA A VIVIENDA (APORTE) glb 1.00
Ver calculo de flete de agregados y piedra. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 02. 04. ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE AGREGADO Y PIEDRA DE PUNTA DE CARRETERA A VIVIENDA (A glb 1.00
Ver calculo de flete de agregados y piedra. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
PROYECTO:
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
01. OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 0.00 0.00 29,176.65 29,176.65 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01. 01. PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 5,395.00 5,395.00 100.00%
01. 01. 01. LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO glb 1.00 465.00 465.00 1.00 465.00 100.00%
01. 01. 03. LAVADO Y DESINFECCION DE MANOS glb 1.00 1,740.00 1,740.00 1.00 1,740.00 100.00%
01. 02. PROCEDIMIENTO OBLIGATORIO PARA INICIO DE LOS TRABAJOS 8,625.00 8,625.00 100.00%
01. 02. 01. PROCESO PARA INICIO DEL TRABAJO glb 1.00 8,625.00 8,625.00 1.00 8,625.00 100.00%
01. 03. TRABAJOS PRELIMINARES 0.00 473.32 473.32 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01. 01. 01. CARTEL DE OBRA DE 4.00 X 2.50 und 1.00 473.32 473.32 1.00 473.32 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 04. TRAZO NIVELES Y REPLANTEO PRELIMINAR 0.00 0.00 0.00 3,800.71 0.00 3,800.71 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
01. 02. 01. TRAZOS, NIVELES (REPLANTEO PRELIMINAR) m2 2,621.18 1.45 3,800.71 2,621.18 3,800.71 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 05. SEGURIDAD Y SALUD 0.00 0.00 0.00 10,882.62 0.00 10,882.62 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
01. 03. 01. EQUIPO DE SEGURIDAD INDIVIDUAL glb 63.00 93.90 5,915.70 63.00 5,915.70 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 03. 02. EQUIPO DE SEGURIDAD COLECTIVA glb 63.00 26.62 1,677.06 63.00 1,677.06 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 03. 03. SEÑALIZACION TEMPORAL DE SEGURIDAD glb 63.00 7.22 454.86 63.00 454.86 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 03. 04. CAPACITACION EN SALUD Y SEGURIDAD glb 63.00 45.00 2,835.00 63.00 2,835.00 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
02. MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 39,590.79 0.00 39,590.79 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
02. 01. EXCAVACIONES 0.00 0.00 0.00 39,590.79 0.00 39,590.79 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02. 01. 01. CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) m3 1,310.59 22.79 29,868.35 1,310.59 29,868.35 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02. 01. 02. EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 426.61 22.79 9,722.44 426.61 9,722.44 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
03. OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 89,168.33 0.00 49,786.82 55.83% 0.00 39,381.51 44.17% 0.00 0.00 0.00% 0.00 0.00 0.00%
03. 01. CIMIENTOS 0.00 0.00 0.00 46,072.65 0.00 36,858.12 80.00% 0.00 9,214.53 0.20 0.00 0.00 0.00 0.00
03. 01. 02. SUMINISTRO DE PIEDRA MEDIANA (APORTE) m3 142.20 32.50 4,621.50 113.76 3,697.20 80.00% 28.44 924.30 20.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
03. 02. SOBRECIMIENTOS 0.00 0.00 0.00 43,095.68 12,928.70 30.00% 30,166.98 70.00% 0.00 0.00
03. 02. 01. SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 110.57 159.30 17,613.80 33.17 5,284.14 30.00% 12,329.66 70.00% 0.00 0.00
03. 02. 02. ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m m2 1,078.37 23.63 25,481.88 323.51 7,644.56 30.00% 17,837.32 70.00% 0.00% 0.00 0.00 0.00%
04. CONCRETO ARMADO 0.00 0.00 205,105.94 0.00 0.00 0.00% 0.00 106,149.8 51.75% 98,956.17 48.25% 0.00 0.00 0.00% 0.00 0.00
04. 01. COLUMNAS 0.00 0.00 111,544.97 0.00 0.00 0.00% 0.00 78,081.48 70.00% 33,463.49 30.00% 0.00 0.00 0.00 0.00
04. 01. 01. CONCRETO COLUMNAS f'c=175 kg/cm2 m3 80.68 318.52 25,698.19 0.00 0.00 0.00% 56.48 17,988.73 70.00% 24.20 7,709.46 30.00% 0.00 0.00
04. 01. 02. ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 902.95 31.53 28,470.01 0.00 0.00 0.00% 632.07 19,929.01 70.00% 270.89 8,541.00 30.00% 0.00
04. 01. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 11,521.44 4.98 57,376.77 0.00 0.00 0.00% 8,065.01 40,163.74 70.00% 3,456.43 17,213.03 30.00% 0.00
04. 02. VIGAS 0.00 0.00 93,560.97 0.00 0.00 0.00% 0.00 28,068.29 30.00% 65,492.68 70.00% 0.00 0.00 0.00%
04. 02. 01. CONCRETO VIGAS f'c=175 kg/cm2 m3 99.09 282.06 27,949.33 0.00 0.00 0.00% 29.73 8,384.80 30.00% 69.36 19,564.53 70.00% 0.00 0.00 0.00%
04. 02. 02. ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1,030.26 36.46 37,563.28 0.00 0.00 0.00% 309.08 11,268.98 30.00% 721.18 26,294.30 70.00% 0.00 0.00 0.00%
04. 02. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS kg 5,632.20 4.98 28,048.36 0.00 0.00 0.00% 1,689.66 8,414.51 30.00% 3,942.54 19,633.85 70.00% 0.00 0.00 0.00%
05. TIJERALES Y RETICULADOS 0.00 0.00 0.00 87,956.06 0.00 0.00 0.00% 0.00 0.00 0.00% 52,773.64 60.00% 0.00 35,182.42 40.00% 0.00 0.00%
05. 01. TIJERAL DE MADERA DE 2"X4" und 252.00 223.89 56,420.28 0.00 0.00 0.00 0.00 0.00% 151.20 33,852.17 60.00% 100.80 22,568.11 40.00% 0.00 0.00 0.00%
05. 02. CORREAS DE MADERA 2"X2" p2 3,996.06 6.96 27,812.58 0.00 0.00 0.00 0.00 0.00% 2,397.64 16,687.55 60.00% 1,598.42 11,125.03 40.00% 0.00 0.00 0.00%
05. 03. FRISO DE MADERA DE 1 1/2" X 2 1/2" p2 482.28 7.72 3,723.20 0.00 0.00 0.00 0.00 0.00% 289.37 2,233.92 60.00% 192.91 1,489.28 40.00% 0.00 0.00 0.00%
06. COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 0.00 0.00 0.00 116,755.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 58,377.84 50.00% 58,377.84 50.00%
06. 01. COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 2,585.65 41.89 108,312.88 0.00 0.00 0.00 0.00 0.00% 1,292.83 54,156.44 50.00% 1,292.83 54,156.44 50.00%
06. 02. CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 387.64 21.78 8,442.80 0.00 0.00 0.00 0.00 0.00% 193.82 4,221.40 50.00% 193.82 4,221.40 50.00%
07. CIELO RASOS 0.00 0.00 0.00 62,439.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 18,731.79 30.00% 43,707.51 70.00%
08. MUROS 0.00 0.00 0.00 314,657.09 0.00 0.00 0.00% 0.00 0.00 0.00% 188,794.3 60.00% 0.00 125,862.8 40.00%
PROYECTO:
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
08. 01. MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO m2 4,599.00 52.17 239,929.83 0.00 0.00 0.00 0.00 0.00% 2,759.40 143,957.90 60.00% 1,839.60 95,971.93 40.00%
08. 02. SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10 m2 3,435.38 13.60 46,721.17 0.00 0.00 0.00 0.00 0.00% 2,061.23 28,032.70 60.00% 1,374.15 18,688.47 40.00%
08. 03. BRUÑAS DE MUROS DE LADRILLO m 17,952.62 1.56 28,006.09 0.00 0.00 0.00 0.00 0.00% 10,771.57 16,803.65 60.00% 7,181.05 11,202.44 40.00%
09. REVOQUES 0.00 0.00 1,139.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 1,139.81 100.00%
10. ENLUCIDO DE YESO 0.00 0.00 84,924.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 42,462.22 50.00% 42,462.22 50.00%
10. 01. ENLUCIDO DE YESO EN MURO DE LADRILLO m2 3,860.10 17.17 66,277.92 0.00 0.00 0.00 0.00 0.00% 1,930.05 33,138.96 50.00% 1,930.05 33,138.96 50.00%
10. 02. DERRAMES DE VANOS CON YESO E=1.5CM m 1,979.46 9.42 18,646.51 0.00 0.00 0.00 0.00 0.00% 989.73 9,323.26 50.00% 989.73 9,323.26 50.00%
11. PISOS 0.00 0.00 0.00 51,414.24 0.00 0.00 0.00% 0.00 0.00 0.00% 10,282.85 20.00% 0.00 41,131.39 80.00% 0.00 0.00%
11. 01. BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM m2 1,253.70 4.73 5,930.00 0.00 0.00 0.00 0.00 0.00% 250.74 1,186.00 20.00% 1,002.96 4,744.00 80.00%
11. 02. ACERO DE TEMPERATURA m2 1,253.70 9.04 11,333.45 0.00 0.00 0.00 0.00 0.00% 250.74 2,266.69 20.00% 1,002.96 9,066.76 80.00%
11. 03. PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO m2 1,253.70 27.24 34,150.79 0.00 0.00 0.00 0.00 0.00% 250.74 6,830.16 20.00% 1,002.96 27,320.63 80.00% 0.00 0.00 0.00%
12. VEREDAS 0.00 0.00 6,608.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 6,608.51 100.00%
12. 01. NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (APORTE) m2 151.20 4.73 715.18 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 151.20 715.18 100.00%
12. 03. ENCOFRADO Y DESENCOFRADO DE VEREDAS 0.00 44.13 22.98 1,014.11 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 44.13 1,014.11 100.00%
13. ZOCALOS Y CONTRAZOCALOS 0.00 0.00 27,092.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 11,753.13 43.38% 0.00 15,339.02 56.62%
13. 02. CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M m 1,065.96 8.41 8,964.72 0.00 0.00 0.00 0.00 0.00% 319.79 2,689.42 30.00% 746.17 6,275.30 70.00%
14. PUERTAS 0.00 0.00 106,705.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 21,341.12 20.00% 0.00 85,364.50 80.00%
14. 01. PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 63.00 630.05 39,693.15 0.00 0.00 0.00 0.00 0.00% 12.60 7,938.63 20.00% 50.40 31,754.52 80.00%
14. 02. PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 63.00 441.23 27,797.49 0.00 0.00 0.00 0.00 0.00% 12.60 5,559.50 20.00% 50.40 22,237.99 80.00%
14. 03. PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION und 126.00 311.23 39,214.98 0.00 0.00 0.00 0.00 0.00% 25.20 7,843.00 20.00% 100.80 31,371.98 80.00%
15. VENTANAS 0.00 0.00 84,569.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 16,913.86 20.00% 0.00 67,655.45 80.00%
PROYECTO:
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
15. 02. VENTANA CENITAL und 63.00 296.78 18,697.14 0.00 0.00 0.00 0.00 0.00% 12.60 3,739.43 20.00% 50.40 14,957.71 80.00%
16. INSTALACIONES ELECTRICAS 0.00 0.00 22,630.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 22,630.23 100.00%
16. 01. INSTALACION ELECTRICA EN MÓDULO glb 63.00 359.21 22,630.23 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 63.00 22,630.23 100.00%
17. EVACUACION AGUAS PLUVIALES 0.00 0.00 37,927.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37,927.37 100.00%
17. 01. SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 126.00 287.60 36,237.60 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 126.00 36,237.60 100.00%
17. 02. ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO. m2 44.10 24.67 1,087.95 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 44.10 1,087.95 100.00%
17. 03. CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION m3 2.76 218.05 601.82 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 2.76 601.82 100.00%
18. MITIGACION Y LIMPIEZA 0.00 0.00 8,617.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8,617.14 100.00%
18. 01. MITIGACION DEL IMPACTO AMBIENTAL (APORTE) glb 63.00 136.78 8,617.14 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 63.00 8,617.14 100.00%
19. ACARREOS 0.00 0.00 17,234.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17,234.91 100.00%
19. 01. ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE) glb 63.00 273.57 17,234.91 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 63.00 17,234.91 100.00%
20. FLETES 0.00 0.00 0.00 292,976.90 0.00 216,035.52 73.74% 0.00 76,941.39 26.26% 0.00 0.00 0.00%
20. 01. FLETE Y TRANSPORTE DE MATERIALES 0.00 0.00 139,094.13 0.00 139,094.13 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
20. 02. FLETE Y TRANSPORTE DE PIEDRA Y AGREGADOS glb 0.00 0.00 153,882.77 0.00 76,941.39 50.00% 0.00 76,941.39 50.00% 0.00 0.00
1,686,690.5 334,589.78 19.84% 222,472.66 13.19% 350,806.9 20.80% 371,756.6 22.04% 407,064.5 24.13%
CONTROL "S" DE TIEMPO - AVANCE FISICO - FINANCIERO - SEGUN PRESUPUESTO EXPEDIENTE TECNICO
NE 12
2 DEL 15 DE MARZO AL 31 DE #REF! #REF! #REF! 43,936.19 #REF! #REF! 0.00 #REF! #REF!
MARZO
3 DEL 01 DE ABRIL AL 30 DE #REF! #REF! #REF! 0.00 #REF! 0.00% 0.00 #REF! #REF!
ABRIL
4 01 DE MAYO AL 31 DE MAYO #REF! #REF! #REF! 0.00 #REF! 0.00% 0.00 #REF! 0.00%
5 01 DE JUNIO AL 30 DE JUNIO #REF! #REF! #REF! 0.00 #REF! 0.00% 0.00 #REF! 0.00%
6 01 DE JULIO AL 31 DE JULIO #REF! #REF! #REF! 0.00 #REF! 0.00% 0.00 #REF! 0.00%
01 DE AGOSTO AL 13 DE
7 AGOSTO #REF! #REF! #REF! 0.00 #REF! 0.00% 0.00 #REF! 0.00%
110%
100%
% de Avances Acumulados
90%
80%
70%
60%
50%
40%
30%
20%
10%
0% 0.00% 0.00% 0.00% 0.00% 0 00.00% 0 00.00% 0 00.00% 0 00.00% 0 00.00%
INICIO DEL 15 DE DEL 01 DE 01 DE MAYO AL 01 DE JUNIO AL 01 DE JULIO AL
MARZO AL 31 ABRIL AL 30 DE 31 DE MAYO 30 DE JUNIO 31 DE JULIO
DE MARZO ABRIL
Meses Valorizados
0% 0.00% 0.00% 0.00% 0.00% 0 00.00% 0 00.00% 0 00.00% 0 00.00% 0 00.00%
INICIO DEL 15 DE DEL 01 DE 01 DE MAYO AL 01 DE JUNIO AL 01 DE JULIO AL
MARZO AL 31 ABRIL AL 30 DE 31 DE MAYO 30 DE JUNIO 31 DE JULIO
DE MARZO ABRIL
Meses Valorizados
_____________________ _____________________
Asistente Administrativo Residente de Obra
FORMATO N° 23
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRAL, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO” COSTO DIRECTO : S/1,686,690.46
PERIODO
Mes 1° MES - ABRIL 2° MES - MAYO 3° MES - JUNIO 4° MES - JULIO 5° MES - AGOSTO 6° MES - SET.
PLAN PARA LA VIGILANCIA, Programado 345.28 345.28 194.22 194.22 269.75 269.75 269.75 215.80 53.95 269.75 269.75 215.80 161.85 53.95 107.90 269.75 269.75 269.75 161.85 107.90 345.28 345.28 194.22 194.22
01.01 PREVENCION Y CONTROL DE COVID- 5,395.00
19 Ejecutado 0.00
PROCEDIMIENTO OBLIGATORIO PARA Programado 1,380.00 1,380.00 776.25 776.25 1,078.12 1,078.12 1,078.12 862.50 215.64
01.02 8,625.00
INICIO DE LOS TRABAJOS Ejecutado 0.00
Programado 473.32
01.03 TRABAJOS PRELIMINARES 473.32
Ejecutado 0.00
TRAZO NIVELES Y REPLANTEO Programado 851.36 851.36 478.89 478.89 570.21 342.00 228.00
01.04 PRELIMINAR 3,800.71
Ejecutado 3,076.77
Programado 3,047.13 3,047.13 1,523.57 816.00 816.00 816.00 653.79 163.00
01.05 SEGURIDAD Y SALUD 10,882.62
Ejecutado 8,809.74
Programado 8,868.00 8,868.55 4,988.56 4,988.44 2,969.30 2,969.30 2,969.30 2,375.00 594.34
02.00 MOVIMIENTO DE TIERRAS 39,590.79
Ejecutado 32,049.69
Programado 16,349.84 16,349.84 16,349.66 13,081.00 3,269.00 7,130.70 7,130.70 4,753.80 4,753.79
03.00 OBRAS DE CONCRETO SIMPLE 89,168.33
Ejecutado 0.00
Programado 13,943.12 13,943.12 13,943.12 11,155.00 2,788.13 17,721.97 17,721.97 14,177.58 10,633.18 3,544.39 7,088.79 17,272.37 17,272.37 17,272.37 6,908.95 10,363.42 2,339.02 2,339.02 2,339.02 2,339.02
04.00 CONCRETO ARMADO 205,105.94
Ejecutado 0.00
Programado 5,277.36 5,277.36 5,277.36 12,313.85 1,759.13 5,277.36 10,994.51 10,994.51 10,994.51 6,596.70 4,397.80 2,198.90 2,198.90 2,198.90 2,198.91
05.00 TIJERALES Y RETICULADOS 87,956.06
Ejecutado 0.00
COBERTURA DE PLANCHA Programado 1,751.50 1,751.40 1,751.50 4,086.40 583.70 1,751.07 14,594.46 14,594.46 14,594.46 5,837.78 8,756.68 8,756.68 8756.6758275 8756.6758275 8,756.68 5,837.78 5,837.78
06.00 116,755.68
CORRUGADA GALVANIZADA Ejecutado 0.00
Programado 7,804.91 7,804.91 7,804.91 3,121.97 4,682.95 6,243.93 6,243.93 6,243.93 6,243.93 3,121.97 3,121.97
07.00 CIELO RASOS 62,439.30
Ejecutado 0.00
Programado 39,332.14 39,332.14 39,332.14 31,465.71 7,866.41 23,599.28 23,599.28 23,599.28 9,439.71 4719.86 9,439.72 15,732.86 15,732.86 15,732.86 6,293.14 9,439.71
08.00 MUROS 314,657.09
Ejecutado 0.00
Programado 199.47 199.47 199.47 199.47 341.95
09.00 REVOQUES 1,139.81
Ejecutado 0.00
Programado 8,492.44 8,492.44 8,492.44 8,492.44 2,123.11 6,369.35 10,615.56 10,615.56 10,615.56 6,369.33 4,246.21
10.00 ENLUCIDO DE YESO 84,924.43
Ejecutado 0.00
Programado 3,084.85 3,084.85 3,084.85 3,084.85 771.23 2,313.64 3,856.07 3,856.07 3,856.07 2,313.64 1,542.43 2,570.71 2,570.71 2,570.71 2,570.72 5,141.42 5,141.42
11.00 PISOS 51,414.24
Ejecutado 0.00
Programado 1,321.70 1,321.70 1,321.70 1321.70408 1,321.70
12.00 VEREDAS 6,608.51
Ejecutado 0.00
Programado 1,359.56 1,359.56 1,359.56 815.73 543.82 3,162.40 4,370.90 5,267.37 5,267.37 3,585.88
13.00 ZOCALOS Y CONTRAZOCALOS 27,092.15
Ejecutado 0.00
Programado 17,784.27 35,568.54 35,568.54 17,784.27
14.00 PUERTAS 106,705.62
Ejecutado 0.00
Programado 14,094.89 28,189.77 28,189.77 14,094.89
15.00 VENTANAS 84,569.31
Ejecutado 0.00
Programado 2,828.78 2,828.78 5,657.56 5,657.56 5,657.56
16.00 INSTALACIONES ELECTRICAS 22,630.23
Ejecutado 0.00
Programado 4,740.92 9,481.84 9,481.84 9,481.84 4,740.93
17.00 EVACUACION AGUAS PLUVIALES 37,927.37
Ejecutado 0.00
Programado 2,154.29 4,308.57 2,154.29
18.00 MITIGACION Y LIMPIEZA 8,617.14
Ejecutado 0.00
Programado 4,308.73 8,617.46 4,308.73
19.00 ACARREOS 17,234.91
Ejecutado 0.00
Programado 118,487.98 78,991.98 95,496.94
20.00 FLETE 292,976.90
Ejecutado 0.00
Programad 14,965.09 14,492.32 7,961.49 6,437.80 193,816.46 75,100.27 74,986.09 138,800.78 14,950.47 67,327.85 67,327.75 61,352.61 52,966.07 109,052.31 32,347.83 82,500.04 82,500.04 82,500.04 38,419.10 44,080.92 34,707.79 40,657.21 76,110.55 114,452.73 106,433.52 52,443.34
PPTO COSTO DIRECTO 1,686,690.46
Ejecutado 2.60%
P = PROGRAMADO 0.89% 0.86% 0.47% 0.38% 11.49% 4.45% 4.45% 8.23% 0.89% 3.99% 3.99% 3.64% 3.14% 6.47% 1.92% 4.89% 4.89% 4.89% 2.28% 2.61% 2.06% 2.41% 4.51% 6.79% 6.31% 3.11%
AVANCE SEMANAL (%)
E = EJECUTADO 2.60%
AVANCE ACUMULADO P = PROGRAMADO 0.89% 1.75% 2.22% 2.60% 14.09% 18.54% 22.99% 31.22% 32.10% 36.10% 40.09% 43.73% 46.87% 53.33% 55.25% 60.14% 65.03% 69.92% 72.20% 74.81% 76.87% 79.28% 83.79% 90.58% 96.89% 100.00%
(%) E = EJECUTADO 2.60%
43,856.70 2.60% 497,654.07 29.50% 390,374.42 23.14% 330,000.13 19.56% 265,928.28 15.77% 158,876.86 9.42%
MES DE ABRIL MES DE MAYO MES DE JUNIO MES DE JULIO MES DE AGOSTO MES DE SETIEMBRE
P = PROGRAMADO 43,856.70 2.60% 564,981.92 33.50% 323,046.57 19.15% 330,000.13 19.56% 372,361.80 22.08% 52,443.34 3.11%
AVANCE MENSUAL (%)
E = EJECUTADO 43,936.19 2.60%
AVANCE ACUMULADO P = PROGRAMADO 43,856.70 2.60% 608,838.62 36.10% 931,885.19 55.25% 1,261,885.32 74.81% 1,634,247.12 96.89% 1,686,690.46 100.00%
(%) E = EJECUTADO 43,936.19 2.60%
RESUMEN DE METRADOS REALES DIARIOS CORRESPONDIENTE AL MES DE ABRIL DEL 2021
PRESUPUESTO
ACUMULADO
PARTIDA DESCRIPCIÓN ANTERIOR
L M M J V S D
ACUM. METRADO
SALDO
Unid. Metrado P.Unit. S/. Presup. 5 6 7 8 9 10 11 SEMANAL ACUM
01.01.02 EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR PREVIO AL INICIO glb 1.00 250.00 0.00 0.00 1.00
A OBRA 250.00
glb 63.00 93.90 12.00 8.00 10.00 10.00 6.00 5.00 51.00 51.00 12.00
01.05.01 EQUIPO DE SEGURIDAD INDIVIDUAL 5,915.70
glb 63.00 26.62 12.00 8.00 10.00 10.00 6.00 5.00 51.00 51.00 12.00
01.05.02 EQUIPO DE SEGURIDAD COLECTIVA 1,677.06
glb 63.00 7.22 12.00 8.00 10.00 10.00 6.00 5.00 51.00 51.00 12.00
01.05.03 SEÑALIZACION TEMPORAL DE SEGURIDAD 454.86
glb 63.00 45.00 12.00 8.00 10.00 10.00 6.00 5.00 51.00 51.00 12.00
01.05.04 CAPACITACION EN SALUD Y SEGURIDAD 2,835.00
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACIONES
02.01.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) m3 1310.59 22.79 166.4241 208.03 249.64 208.03 124.82 104.02 1,060.95 1,060.95 249.64
29,868.35
m3 426.61 22.79 54.1727 67.7159 81.259 67.7159 40.6295 33.8579 345.35 345.35 81.26
02.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) 9,722.44
03.01 CIMIENTOS
03.01.01 CIMIENTO CORRIDO DE CONCRETO CICLOPEO MEZCLA CEMENTO HORMIGON m3 284.41 127.05 0.00 0.00 284.41
1:10 + 50% P.G. 36,134.29
03.02 SOBRECIMIENTOS
04 CONCRETO ARMADO
04.01 COLUMNAS
04.02 VIGAS
05 TIJERALES Y RETICULADOS
07 CIELO RASOS
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL DE ALUMINIO
07.01 m 1135.26 55.00 62,439.30 0.00 0.00 1,135.26
0.61x0.61 e=6MM / INC. ACCESORIOS E INSTALACION
08 MUROS
09 REVOQUES
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON MORTERO 1:4 E= 1.5
09.01 m2 44.23 25.77 1,139.81 0.00 0.00 44.23
CM
10 ENLUCIDO DE YESO
11 PISOS
m2 1253.70 4.73 0.00 0.00 1,253.70
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM 5,930.00
12 VEREDAS
13 ZOCALOS Y CONTRAZOCALOS
13.01 ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=58 CM E= 2 CM INCLUYE BRUÑAS m2 720.20 25.17 18,127.43 0.00 0.00 720.20
14 PUERTAS
15 VENTANAS
VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON CONTRAVENTANA DE
15.01 und 189.00 348.53 65,872.17 0.00 0.00 189.00
MADERA
16 INSTALACIONES ELECTRICAS
18 MITIGACION Y LIMPIEZA
19 ACARREOS
20 FLETES
20.01.03 FLETE RURAL DE MATERIALES PUNTA DE CARRETERA A VIVIENDA (APORTE) glb 1.00 23,291.26 23,291.26 0.00 0.00 1.00
AVANCE
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN
ANTERIOR ACTUAL ACUMULADO
Valorizado
Unid. Metrado P.Unit. S/. Presup. Metrado % Metrado Valorizado S/. % Metrado Valorizado S/. % Metrado Valorizado S/. %
S/.