An Tet Dovelopment
Main EPC Contract Petrofac a
(NENT-CON 000-60282
REQUEST FOR INSPECTION S
[roa we ar2048 Sean PRELINE Tene TaDIS SARPTPL OS
‘Sub Contactor: SARPI |ArewiLocation: — CRTI (CSC Expertise) [Sub System Noo NIA
Date otipecion 14/09/2002 [FE _on soa ven | — Jean corn
Phe SORT ~[fiPienne 5 TRACE Ne,
Wineseo7Mechoicat Tet or png POR a Fe Laeraony robe
iepecion AcityDevsinion. [ees rem ea
ncpecion NemTap Nurber: WPS-SARGTSM.SS-PIPS
Drawing & Rov No
‘CHECKED & READY FORINSPECTION
frame Aer ae Cn Pye
lconsanobione: | 0662 YO SESS —=
[Sinatra Acer
[Date & Time e221 08( 2002] A036 Fe PESTER Ne ae
FOR QUALITY CONTROL DEPARTMENT USE ONLY
‘Sub Contactor 06 PUL ac onrae
REceVeDeY | _curcxrnnvadl RECENED EY RECEIVED BY
co u [ap Roo ep wee
Jcomactsoode No: | nA. f0 £3 SX | obs Jo.(3 SZ Mira 72
sionstore ats | ae i EAP
ose ete 2 of dol 99.0% dor | mle TH
firresnow Rese: ever | ~ ono fox [panes BW [owe
INSPECTION RESULTS ck as appli
[ACCEPTABLE ap o [PARTALLY ACCEPTABLE PAC [RAen HOLD a
CANCELLED a ResEcTED ®) INOT READY FOR INSPECTION NR) CT
TREN FR ANGELA TORT BERD FOR WEPECTOMRESECTION
cae Wk [inaioen document tached [= Repestearvnecossany RFT
[eo acon tr RF en ld [sNo Power Supply avelste state |e PTWratavalable
Safety ues bc Test Crew rat raat [Test vient nat evlabe
10: Matial not sper daasheeravra | -Unaccetable Tet PrecegreReaut”[12.VoigonoFTP
Peer Woseanship feSpec Velen stato not pe ring
-Oter Conners Remar
[poner Cat rane
apo SARPIOE FUL Contraction GE Company OS
None
Snatte
RF Ctsad on
TRIACS Can be signed off or not? C-Complete =
No.of TRIAGS Signed of
P-Partal =
“Total No, of TRIACS:
NIA Not Applicable o
TRIACS Signed off on:SS Petrofac 6 SS
rene Sao
PROJECT NAME: AN TSILA DEVELOPMENT PROJECT
PRELIUNARY WELOING PROCEDURE SPECIFICATION (5)
(Aste 831.3 Gs, 201, ASME Seton KE, 217, AGAC-S>E000.3006, ATL-SPE0000004)
contracToR Pets nen oral UAE into PL
suscoxrAcTen ann
Pani Weg Pre cto SAROT RPS
SuyrteyFORNAG)—__Tabecuted Dae
saa Pet ow
TanTe ene)
serioson sre
saan ve Te
ne Maes ie =
Tab Ba AT
Owe [ventana is
1 seeneate EJ cae at
oote=a= 2
Roatan = 2 29.
ete ca
Testi (1 Sento)
ase
one
(CASE MTAL 03)
Phe
‘Senco Tp ed rade asmaasta
‘a Annie
cen 4 Pa, Gein 4
Met ove setoststen te Precis eer
no Pass Thicke sR ) z wm
spec na
TALS oa raw
om)
ams) ER
stom
a SS aT
Mot apptes
Hot agpiesbe
“SARPL Prue
Jame AUWANTTOUGHE —_|Wame: VUAVKUMAR PATEL
[strates
loate: somerazt Jost =11/0472021—_ Petrofac 6 S
ove
pens amerest mk
a aearen eno
See Seen i
waite ee aa
eterae = | ie =
So
Saar a
RT sn as ee
Sc, —— a ome TS St
pails aa .
= Se ee See
man earamiemes — | Se” panellist
A TTT
ghee
Fler Mata Curent na einin,
- we PT ‘ra Sct
1 fia | ie | oe] ES | ena | ate
mer] ows [em | Am | nem | | orp | eat
Se ee eee eee
Se aoe fesre) “er” Lesa} gt eer Sosa
Sea es-fey Sae'te, Piss ber at [eae [saa
fag an Wa Rag 3 rr aly
‘Ano nv, or poe a shal be pei rea sve se, ei an ness,
Pauses cunt exnepleae aco ra)
Tngson ode Sean Tipe 25mm ew 24mm 75 tora 2
The Tengu. 7 Ms)
Waar sh resag RED
‘ronacu (ae)
Singer Wane Bead ing eave wh tbe eased fr GTA
‘ts ana aps hci, GAPS Te) Wing ring nae, On Ss uc a Dual
eres ara ECE
a
tle cgi Pao eh tigi
Matto singeEocotes Sigh
{Shenss Gut chamte Terapia
‘Sects Spang Tat pen
er
Note: "TWoligconsumate sabe sed por Preeetopefeaionrewereme
able sl eotan inn frit content oS
tn bvel ae oh nian stl) shall smooth anor ane oteminion
uno tar rin mtr tat oer a we
ca hal be upped ih igh Feqsncy Unt.
‘SARPL PIU
Jname:ALrWamToUcHE —_ |uame:VUJAYKUMAR PATEL
[signstere= inate:
foste: aomere2t joste: 11/04/2021obiateass
e
~
Isarene
Petrofac 6
PHPSNo_SEROTSSPPOS Rev
‘Testng Roqurement for Procedure Qualieaton Racor (POR)
®
s
3
fexno] test ecriion
‘aunty eames
os espe ASNE BSA ASE Sein
2 [petegmatic amiaton
toe [peperaewe oar 4 ACME Gecanv
@ |restoene nee fpeper Tene aves ot At Secon
+ proetien wmcnannzy | ane poperastanio se meee
ft ne
the pepe 7323 crmce wnorrsisorsisen
« fiscoteranainsProwgepn] rn [atx wagntaaen
= _foseopmti narra everatcap dco wena
ot fester
a Se
[een rarespe wn an ors 3 FH
ARPI
PauL ~_SARENE:
Name +ALL HAMITOUGHE
name VUAYKUMAR PATEL [\ame!-@.2n'Giary 60
Signature:
lone: ommar.21
signature. = tanatare RMT 2
ome 3/04/2021 leh ap Joe A994Appell Able I jal 42 geal
REPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIRE,
MINISTERE DE L’ENERGIE ET DES MINES eotlall 9 4BLBI Bis
AUTORITE DE REGULATION DES HYDROCARBURES ith jal dala Aad
Division Activités Contréle Technique Aah Ayal) CALLE pad
N° 9 /ARHICTIZA/2021
Alger, le gt Mal 2001
Monsieur le Directeur Division Association
Activité Exploration- Production
Sonatrach
\vis sur la conformité des procédures de soudage
Projet : Développement du champ d’Ain T'sila
‘Sous traitant_ : SARPI - WPS N°: SAR-GT-CS-PIP-01; SAR-GT-CS-PIP-01R; SAR-GT-CS-
PIP-02; SAR-GT-CS-PIP-02R; SAR-GT-CS-PIP-03;
SAR-GT-CS-PIP-03R; SAR GT CS PIP 04; SAR GT CS.
PIP-05; SAR-GT-CS-PIP-05R;
Réf. 1 N°862/21/E-P/HSE-AST du 20-04-2021
Par envoi visé en référence, vous avez sollicité 'ARH pour un avis sur la conformité des
procédures de soudage relative au projet cité en objet.
En réponse, je vous informe que ces procédures sont conformes et la décision _y afférente est
jointe en annexe.
Par ailleurs, je vous rappelle que les procédures de soudage doivent étre qualifiées en
présence d'un représentant de I'ARH.
Enfin, je vous demande de déléguer votre représentant diment mandaté pour récupérer les
WPS visées par 'ARH.
Veuillez agréer, Monsieur le Directeur, l'expression de mes salutations distinguées.
de Division CT.
intérimaire.
= Agence Nationale pourle Controle et Ia Régulation des Activités dons
‘Adrese: 44, Boulevard 11 Décemire 1960, EI Bi
‘Tel :029370-20/ 44 Fre 025 ¥7-30-88 = Femall: awhG@arhenerov.vev.drAsal Aub) piaall dy pl jall Ay geal
REPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIRE
MINISTERE DE L/ENERGIE FURNES ST)
AUTORITE DE REGULATION DES HYDROCARBURES: Cathy pal Lacs Adal
Division Activités Contréle Technique Ac 28) yal) CLES pad
AVIS SUR LA CONFORMITE
DE LA PROCEDURE DE SOUDAGE
N°A3¥ Date, 04 MAl m0
Maitre de 'couvre :
SARPI
Demande N°: N°962/21/E-P/HSE-AST du 20-04-2021
Maitre de l'ouvrage : SH/AST
rojet : Ain TSILA
‘SAR-GT-CS-PIP-01, SAR-GT-CS-PIP-O1R; SAR-GT-CS-
wee. PIP-02; SAR-GT-CS-PIP-02R; SAR-GT-CS-PIP-03; SAR-
3 GT-CS-PIP-03R; SAR-GT-CS-PIP-04; SAR-GT-CS- PIP-05;
| SAR-GT-CS-PIP-O5R
ASMEIX+ ASMEB31.3
Conforme.
Procédures a qualifier
PiLe Directeur de Division CT.
-Le responsable intérimaire.
"Agence Nationale pourle Contre & fa Régulation des Activité dans le Domaine des ydrocarbures ~ 2
‘Adresse: 44, Boulevard 11 Décerbre 1960, El Biar- Alger
els 28 ester (34 Fee: 023 37-30-49 — Fomall:arbarh enerev.ewv. dr