You are on page 1of 6
An Tet Dovelopment Main EPC Contract Petrofac a (NENT-CON 000-60282 REQUEST FOR INSPECTION S [roa we ar2048 Sean PRELINE Tene TaDIS SARPTPL OS ‘Sub Contactor: SARPI |ArewiLocation: — CRTI (CSC Expertise) [Sub System Noo NIA Date otipecion 14/09/2002 [FE _on soa ven | — Jean corn Phe SORT ~[fiPienne 5 TRACE Ne, Wineseo7Mechoicat Tet or png POR a Fe Laeraony robe iepecion AcityDevsinion. [ees rem ea ncpecion NemTap Nurber: WPS-SARGTSM.SS-PIPS Drawing & Rov No ‘CHECKED & READY FORINSPECTION frame Aer ae Cn Pye lconsanobione: | 0662 YO SESS —= [Sinatra Acer [Date & Time e221 08( 2002] A036 Fe PESTER Ne ae FOR QUALITY CONTROL DEPARTMENT USE ONLY ‘Sub Contactor 06 PUL ac onrae REceVeDeY | _curcxrnnvadl RECENED EY RECEIVED BY co u [ap Roo ep wee Jcomactsoode No: | nA. f0 £3 SX | obs Jo.(3 SZ Mira 72 sionstore ats | ae i EAP ose ete 2 of dol 99.0% dor | mle TH firresnow Rese: ever | ~ ono fox [panes BW [owe INSPECTION RESULTS ck as appli [ACCEPTABLE ap o [PARTALLY ACCEPTABLE PAC [RAen HOLD a CANCELLED a ResEcTED ®) INOT READY FOR INSPECTION NR) CT TREN FR ANGELA TORT BERD FOR WEPECTOMRESECTION cae Wk [inaioen document tached [= Repestearvnecossany RFT [eo acon tr RF en ld [sNo Power Supply avelste state |e PTWratavalable Safety ues bc Test Crew rat raat [Test vient nat evlabe 10: Matial not sper daasheeravra | -Unaccetable Tet PrecegreReaut”[12.VoigonoFTP Peer Woseanship feSpec Velen stato not pe ring -Oter Conners Remar [poner Cat rane apo SARPIOE FUL Contraction GE Company OS None Snatte RF Ctsad on TRIACS Can be signed off or not? C-Complete = No.of TRIAGS Signed of P-Partal = “Total No, of TRIACS: NIA Not Applicable o TRIACS Signed off on: SS Petrofac 6 SS rene Sao PROJECT NAME: AN TSILA DEVELOPMENT PROJECT PRELIUNARY WELOING PROCEDURE SPECIFICATION (5) (Aste 831.3 Gs, 201, ASME Seton KE, 217, AGAC-S>E000.3006, ATL-SPE0000004) contracToR Pets nen oral UAE into PL suscoxrAcTen ann Pani Weg Pre cto SAROT RPS SuyrteyFORNAG)—__Tabecuted Dae saa Pet ow TanTe ene) serioson sre saan ve Te ne Maes ie = Tab Ba AT Owe [ventana is 1 seeneate EJ cae at oote=a= 2 Roatan = 2 29. ete ca Testi (1 Sento) ase one (CASE MTAL 03) Phe ‘Senco Tp ed rade asmaasta ‘a Annie cen 4 Pa, Gein 4 Met ove setoststen te Precis eer no Pass Thicke sR ) z wm spec na TALS oa raw om) ams) ER stom a SS aT Mot apptes Hot agpiesbe “SARPL Prue Jame AUWANTTOUGHE —_|Wame: VUAVKUMAR PATEL [strates loate: somerazt Jost =11/0472021 —_ Petrofac 6 S ove pens amerest mk a aearen eno See Seen i waite ee aa eterae = | ie = So Saar a RT sn as ee Sc, —— a ome TS St pails aa . = Se ee See man earamiemes — | Se” panellist A TTT ghee Fler Mata Curent na einin, - we PT ‘ra Sct 1 fia | ie | oe] ES | ena | ate mer] ows [em | Am | nem | | orp | eat Se ee eee eee Se aoe fesre) “er” Lesa} gt eer Sosa Sea es-fey Sae'te, Piss ber at [eae [saa fag an Wa Rag 3 rr aly ‘Ano nv, or poe a shal be pei rea sve se, ei an ness, Pauses cunt exnepleae aco ra) Tngson ode Sean Tipe 25mm ew 24mm 75 tora 2 The Tengu. 7 Ms) Waar sh resag RED ‘ronacu (ae) Singer Wane Bead ing eave wh tbe eased fr GTA ‘ts ana aps hci, GAPS Te) Wing ring nae, On Ss uc a Dual eres ara ECE a tle cgi Pao eh tigi Matto singeEocotes Sigh {Shenss Gut chamte Terapia ‘Sects Spang Tat pen er Note: "TWoligconsumate sabe sed por Preeetopefeaionrewereme able sl eotan inn frit content oS tn bvel ae oh nian stl) shall smooth anor ane oteminion uno tar rin mtr tat oer a we ca hal be upped ih igh Feqsncy Unt. ‘SARPL PIU Jname:ALrWamToUcHE —_ |uame:VUJAYKUMAR PATEL [signstere= inate: foste: aomere2t joste: 11/04/2021 obiateass e ~ Isarene Petrofac 6 PHPSNo_SEROTSSPPOS Rev ‘Testng Roqurement for Procedure Qualieaton Racor (POR) ® s 3 fexno] test ecriion ‘aunty eames os espe ASNE BSA ASE Sein 2 [petegmatic amiaton toe [peperaewe oar 4 ACME Gecanv @ |restoene nee fpeper Tene aves ot At Secon + proetien wmcnannzy | ane poperastanio se meee ft ne the pepe 7323 crmce wnorrsisorsisen « fiscoteranainsProwgepn] rn [atx wagntaaen = _foseopmti narra everatcap dco wena ot fester a Se [een rarespe wn an ors 3 FH ARPI PauL ~_SARENE: Name +ALL HAMITOUGHE name VUAYKUMAR PATEL [\ame!-@.2n'Giary 60 Signature: lone: ommar.21 signature. = tanatare RMT 2 ome 3/04/2021 leh ap Joe A994 Appell Able I jal 42 geal REPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIRE, MINISTERE DE L’ENERGIE ET DES MINES eotlall 9 4BLBI Bis AUTORITE DE REGULATION DES HYDROCARBURES ith jal dala Aad Division Activités Contréle Technique Aah Ayal) CALLE pad N° 9 /ARHICTIZA/2021 Alger, le gt Mal 2001 Monsieur le Directeur Division Association Activité Exploration- Production Sonatrach \vis sur la conformité des procédures de soudage Projet : Développement du champ d’Ain T'sila ‘Sous traitant_ : SARPI - WPS N°: SAR-GT-CS-PIP-01; SAR-GT-CS-PIP-01R; SAR-GT-CS- PIP-02; SAR-GT-CS-PIP-02R; SAR-GT-CS-PIP-03; SAR-GT-CS-PIP-03R; SAR GT CS PIP 04; SAR GT CS. PIP-05; SAR-GT-CS-PIP-05R; Réf. 1 N°862/21/E-P/HSE-AST du 20-04-2021 Par envoi visé en référence, vous avez sollicité 'ARH pour un avis sur la conformité des procédures de soudage relative au projet cité en objet. En réponse, je vous informe que ces procédures sont conformes et la décision _y afférente est jointe en annexe. Par ailleurs, je vous rappelle que les procédures de soudage doivent étre qualifiées en présence d'un représentant de I'ARH. Enfin, je vous demande de déléguer votre représentant diment mandaté pour récupérer les WPS visées par 'ARH. Veuillez agréer, Monsieur le Directeur, l'expression de mes salutations distinguées. de Division CT. intérimaire. = Agence Nationale pourle Controle et Ia Régulation des Activités dons ‘Adrese: 44, Boulevard 11 Décemire 1960, EI Bi ‘Tel :029370-20/ 44 Fre 025 ¥7-30-88 = Femall: awhG@arhenerov.vev.dr Asal Aub) piaall dy pl jall Ay geal REPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIRE MINISTERE DE L/ENERGIE FURNES ST) AUTORITE DE REGULATION DES HYDROCARBURES: Cathy pal Lacs Adal Division Activités Contréle Technique Ac 28) yal) CLES pad AVIS SUR LA CONFORMITE DE LA PROCEDURE DE SOUDAGE N°A3¥ Date, 04 MAl m0 Maitre de 'couvre : SARPI Demande N°: N°962/21/E-P/HSE-AST du 20-04-2021 Maitre de l'ouvrage : SH/AST rojet : Ain TSILA ‘SAR-GT-CS-PIP-01, SAR-GT-CS-PIP-O1R; SAR-GT-CS- wee. PIP-02; SAR-GT-CS-PIP-02R; SAR-GT-CS-PIP-03; SAR- 3 GT-CS-PIP-03R; SAR-GT-CS-PIP-04; SAR-GT-CS- PIP-05; | SAR-GT-CS-PIP-O5R ASMEIX+ ASMEB31.3 Conforme. Procédures a qualifier PiLe Directeur de Division CT. -Le responsable intérimaire. "Agence Nationale pourle Contre & fa Régulation des Activité dans le Domaine des ydrocarbures ~ 2 ‘Adresse: 44, Boulevard 11 Décerbre 1960, El Biar- Alger els 28 ester (34 Fee: 023 37-30-49 — Fomall:arbarh enerev.ewv. dr

You might also like