VASHISHTA SYSTEMS - FIRE PROTECTION

JYOTHI TECH PARK


FLOOR WISE REPORT -BALANCE WORKS
Pending Work
Shaft Tapping
with 150 Bfv
Drain
Connection
with 50 ball
valve
ZONE 1
Test results

False ceiling
interference
Flow switch
upright
Sprinkler

Flexible with
Rosette cup
and pendant
Sprinkler
Flexible
Alignment
Pending Work
Shaft Tapping
with 150 Bfv

ZONE 2
Drain
Connection
with 50 ball
valve
Flow switch
ZONE 2
False ceiling
interference
Test Results

upright
Sprinkler
upright
Sprinkler

Flexible with
Rosette cup
and pendant
Sprinkler
Flexible with
Rosette cup
and pendant
Sprinkler

Flexible
Alignment
Flexible
Alignment
Pending Work
Pending Work
Shaft Tapping
ZONE 3 with 150 Bfv
ZONE 3
Drain
Connection
with 50 ball
valve
False ceiling
interference

Test Results

Flow switch
upright
Sprinkler

Flexible with
Rosette cup
and pendant
Sprinkler
Flexible
Alignment
Pending Work
ZONE 4

Shaft Tapping
with 150 Bfv
Drain
Connection
with 50 ball
valve
False ceiling
interference
Flow switch
upright
Sprinkler

Flexible with
Rosette cup
and pendant
Sprinkler
Flexible
Alignment

Hydrant valve
and ball valve

Remarks

Shaft 1
Shaft 1
Riser piping
Remarks

Hose Reel
Drum
Hose Reel
Drum
Connection
RRL Hose and
Branch Pipe
Hydrant valve
and ball valve
Remarks

Shaft 2
Riser piping
Remarks
Remarks

Hose Reel
Drum

Hose Reel
Drum
Connection
RRL Hose and
Branch Pipe
Hydrant valve
and ball valve
Remarks

Shaft 3
Riser piping
Remarks
Hose Reel
Drum
Hose Reel
Drum
Connection
RRL Hose and
Branch Pipe
Hydrant valve
and ball valve

Remarks

Shaft 4
Riser piping
Remarks
Shaft 4
Riser piping
Remarks

Hose Reel
Drum
Hose Reel
Drum
Connection
RRL Hose and
Branch Pipe
Hydrant valve
and ball valve
Remarks

Shaft 5
Riser piping
Remarks

Hose Reel
Drum
Hose Reel
Drum
Connection
RRL Hose and
Branch Pipe
Hydrant valve
and ball valve

Remarks

Shaft 6
Riser piping
Remarks
Shaft 6
Riser piping
Remarks

Hose Reel
Drum
Hose Reel
Drum
Connection
RRL Hose and
Branch Pipe
ROTECTION SYSTEM

CE WORKS

B1 G.F 1 2

1)Pipe
orientation to
1) Red paint be changed to
near Welding upright near
joints balcony
area(Hoist) for
1 sprinkler
2) One
2) Red Paint support to be
not done in given in
wash room Washroom
corridor pipe corridor for 25
mm pipe

3) Painting
3) Red paint
near welding
touch up
joints

4)Pipe
orientation to
be changed to 4) Clamps to
upright near be fixed
balcony properly
area(Hoist) for
1 sprinkler
5) Clamps to
be fixed .
properly

Yes Yes

Yes Yes

No No

Yes Yes
Yes , 1 to be
fixed in
balcony after
Yes
pipe
orientation
change
1) 2 No.s of
flexible to be
fixed in
washroom
area corridor,
Yes
after Z1, 2
pipe
connection is
cut and elbow
is welded

2) Rosette cup
not fixed in st-
1
1) Alignment
1) Pending
to be done in
near
washroom
washroom
lobby after
area
frame work

1) Zone 2,3
25 dia branch 1) Painting
Joined ,to be near welding
cut and 2 No.s joints and
of 25 elbows drain line
to be fixed
2) L angle
supports to be
painted and 2) Supports
welding joints not given for 3
to be painted 1mtr branches
and 2 l angle near F.S 1
support to be
given
3) Red Paint 3) One upright
not done in sprinkler point
wash room not given near
corridor pipe st2 Shaft

4) Red Paint 4) Clamps to


not done in St be fixed
2 piping properly
5) Z1, 2 piping
to be cut and
elbow to be
fixed
6) Only 3 pts
given back
side St-2
lobby
7) Big size u-
clamps to be
removed and
u-clamps to be
fixed properly

Yes Yes
Yes Yes

Yes Yes
No No

1) 1 upright
1) 1No.
sprinkler to be
Upright
fixed back
sprinkler to be
side st-2
fixed after Z2,
piping by
3 connection
removing
is cut
dummy
2) 2 No.s of
Upright
sprinkler to be
fixed in
washroom
area corridor
3) 3 upright
sprinkler to be
fixed back
side st-2
piping
1) 2 No.s of
1) Rosette
flexible to be
plate to be
fixed in
fixed in low
washroom
rise lift lobby
area corridor
2) Rosette
plate to be
fixed in low
rise lift lobby

1) Alignment 1) Alignment
to be done in to be done in
washroom high rise lift
lobby after lobby after
frame work frame work
2) Alignment
to be done in
washroom
lobby after
frame work

2) One upright
1) U-bolt for L sprinkler point
angle near not given near
shaft Pending st-3 Shaft
tapping
2) Painting
near Welding
joints

3) Second
coat painting
4) St-3 back
side pendant
piping is done
but in other
floors upright
is done, 1
flexible is not
fixed
5) Big size u-
clamps to be
removed and
u-clamps to be
fixed properly
6) L angle
supports to be
painted and
welding joints
to be painted
and 1 l angle
support to be
given

7) One upright
sprinkler point
not given near
st-3 Shaft
tapping
Yes Yes Yes
Yes Yes Yes

No No

Ball valve,
Flow switch Ok
leakage.
Yes Yes Yes
1) 1No.
Upright
sprinkler to be
fixed after Z2,
3 connection
Yes
is cut and 1
upright
sprinkler to be
given near st-
3
1) 2 No.s of
1) 2 No.s of
flexible to be
flexible to be
fixed in
fixed in st-3
washroom
lobby
lobby

2) Rosette 2) Rosette
plate to be plate to be
fixed in low fixed in low
rise lift lobby rise lift lobby
1) Alignment
to be done in
1) Pending in
washroom
st-3 Lobby
lobby after
frame work

2) Alignment
to be done in
high rise lift
lobby after
frame work
1) Big size u- 1) Painting
clamps to be near Welding
removed and joints and
u-clamps to be drain
fixed properly connection
2)Pipe
orientation to
2) Painting be changed to
near Welding upright near
joints balcony
area(Hoist) for
1 sprinkler

3) Clamps to
3) Second
be fixed
coat painting
properly
4) red Paint
not done for
some sub
header

5)Pipe
orientation to
be changed to
upright near
balcony
area(Hoist) for
1 sprinkler
Yes Yes
Yes Yes

No No

Yes Yes
Yes Yes
1) 1 No.s of
flexible to be
fixed in
washroom
lobby and for
other flexible
pendant
sprinkler to be
fixed
1) Alignment
to be done in
washroom
lobby after
frame work

Yes Yes Yes Yes

H.R.D
1)H.V chain
interfering with
not fixed
H.V and H.V
properly
chain missing
2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes Yes Yes

Yes Yes Yes Yes

No No No No

Yes Yes Yes Yes


Hydrant valve H.V chain
chain missing missing

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser 1)2 -150 u
painting to be bolt, 1-50
done ubolt in riser
pipe missing ,
Temporary 25
mm pipes to
be removed.
2) Riser
temporary 2) Riser
supports to be painting to be
removed done

No,
plast
Yes ering Yes Yes
pend
ing

Yes No Yes Yes

No No yes, No No

Yes Yes Yes Yes


2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted

1) Riser 1) Riser
temporary temporary
supports to be supports to be
removed removed

2) Riser 2) Riser
painting to be painting to be
done done
Yes Yes Yes Yes

Yes Yes Yes Yes

No No No No

Yes Yes Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes Yes Yes

Yes Yes Yes Yes

No No No No

Yes Yes Yes Yes


Mock up 1) H.V Nut,
equipment, bolt to be
other brand painted

2)HV chain to
be properly
fixed,
1) Riser
painting to be
done

Yes Yes Yes Yes


Yes Yes Yes Yes

No No No No

Yes Yes Yes Yes

1) Cap and
1) H.V Nut,
chain missing
bolt to be
for Hydrant
painted
valve

2) H.V Nut,
bolt to be
painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes Yes Yes

Yes Yes Yes Yes

No No No No
3 4

1) Support not 1) Red


given at Painting for
sprinkler end some
near st1 for 2 branches not
branches done
2) Support not
given at 2) Clamps to
sprinkler end be fixed
in washroom properly
lobby

3) Clamps to
be fixed
properly
Yes Yes

Yes Yes

No No

Yes Yes
Yes Yes

1) Upright
given in place
of flexible in
balcony area
(Temporary
lift) -1 No
flexible to be
fixed using
adapter
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

1) Red Paint
not done in 1) Red Paint
wash room not done in st-
corridor pipe, 2 backside
Red paint pipe, Drain
touch up in line
branches
2) Alignment
of 25 mm pipe
2) Painting
near
near welding
washroom
joints
area(Towards
Amazon side)

3) Drain 3) Drain
connection connection
inside shaft inside shaft
not given to not given to
drain riser drain riser

4) Big size u-
4) One upright
clamps to be
sprinkler point
removed and
not given near
u-clamps to be
st2 Shaft
fixed properly
5)Support not
given at 5) Clamps to
sprinkler end be fixed
in washroom properly
lobby

Yes Yes
Yes Yes, partial

Yes No
Yes, drain
No
pipe
Ok Ok

Yes yes
1) Rosette 1) Rosette
plate to be plate to be
fixed in low fixed in low
rise lift lobby rise lift lobby
2) 1 pendant
sprinkler with
rosette cup to
be fixed by
removing ball
valve

1) Flexible to
1) Alignment
be removed
to be done in
and direct
high rise lift
sprinkler to be
lobby after
fixed in high
frame work
rise lobby area
2) Alignment 2) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

1)1 L angle
1) Paint
support not
touchup
fixed
2) Red Paint 2) Red Paint
not done in not done in st-
wash room 3 lobby pipe,
corridor pipe drain

1) Bfv handle 4) Clamps to


orientation be fixed
changed properly
Support not
4) Clamps to given at
be fixed sprinkler end
properly in washroom
lobby

Support not
given at
sprinkler end
in washroom
lobby
Yes Yes
Yes Yes

Must check for


No
50 ball valve
Drain riser
connection Ok
leakage
Yes Yes
1 upright
sprinkler not
Yes
fixed in front of
low rise lobby

1) Rosette
Rosette plate
plate to be
to be fixed in
fixed in low
low rise lobby.
rise lift lobby
1) Flexible to
1) Alignment
be removed
to be done in
and direct
high rise lift
sprinkler to be
lobby after
fixed in high
frame work
rise lobby area
1) Bfv handle 1) U bolt not
orientation fixed in l angle
changed support in st-4

2) Drain line
2) Future
needs to be
piping
altered.
connection
Interfering with
given in 100
butterfly valve
line instead of
and false
150
ceiling.

3) Support not
given at 3)Red
sprinkler end Painting near
in washroom joints
lobby
4) Clamps to 5) Clamp not
be fixed given for 1 mtr
properly pipe near hoist

6) Clamps to
be fixed
properly

Yes Yes
Yes Yes

Ball valve not


Yes, ball valve
closing fully
handle
need to alter
Yes Yes
Yes Yes

yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

Yes Yes

Hrd interfering Hrd interfering


with hv, chain with hv, chain
⛓️not fixed ⛓️not fixed
properly properly
2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes

No No

No No

Yes Yes
1)H.V chain 1)H.V chain
not fixed not fixed
properly properly

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1)1 -150 u 1)4 -150 u
bolt, 1-50 bolt, 1-50
ubolt in riser ubolt in riser
pipe missing , pipe missing ,
Temporary 25 Temporary 25
mm pipes to mm pipes to
be removed. be removed.
2) Riser 2) Riser
painting to be painting to be
done done

Yes Yes

Yes Yes

No No

Yes Yes
1)HV chain to 1)HV chain to
be properly be properly
fixed, fixed,

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1)2 -150 u bolt


1) Riser in riser pipe
temporary missing ,
supports to be Temporary 25
removed mm pipes to
be removed.

2) Riser 2) Riser
painting to be painting to be
done done
Yes Yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut,
1) H.V Nut, bolt to be
bolt to be painted, Hrd
painted not fixed
properly
2)HV chain to 2)HV chain to
be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes
No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary 2) 1 50 mm u
supports to be bolt missing
removed

Yes Yes

No No

No No
5 6

1)Balcony
area pendent
1)Second coat
piping to be
paint
changed to
upright
2) Red
Painting for
2) Paint touch
some
ups
branches not
done

3) Balcony
3) Clamps to area pendent
be fixed piping to be
properly changed to
upright

4) Bfv opening
only 25%
5) Clamps to
be fixed
properly

Yes Yes

Yes Yes

No No

Yes Yes
1 upright
sprinkler to be Yes
fixed

1 rosette cup
not fixed in
washroom
area
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

1)tapping for
1) Red paint
drain line
touchup, red
should be
paint and
given inside
primer near
shaft with
drain line
drain riser
2) Clamps to 2)Paint near
be fixed shaft
properly connection

3) L angle
supports to be 3) Clamps to
painted and be fixed
welding joints properly
to be painted
4) Pts behind
st 2 given as
pendant but in
other floors
given upright
and one
sprinkler not
fixed
5) Clamps to
be fixed
properly

Yes yes
yes Yes, partial

yes yes
No No
Ok

yes yes
1) Rosette 1) Rosette
plate to be plate to be
fixed in low fixed in low
rise lift lobby rise lift lobby
1) Alignment
to be done in
washroom
lobby after
frame work
2) Alignment
to be done in
high rise lift
lobby after
frame work.

1) Pts behind
st 3 given as 1) clamps to
pendant but in be properly
other floors fixed
given upright
2) Drain line
2)Red
riser
Painting near ,
connection
st-3 lobby
welding not
piping
proper

tapping for
3) Paint drain line
touchups, should be
paint near given inside
drain line shaft with
drain riser
Support not
4) Clamps to given at
be fixed sprinkler end
properly near st-3 in 2
branches
Yes Yes
Yes Yes, partial

Must check for


No
50 ball valve

Ok Ok

Yes Yes
Yes Yes

1) Rosette 1) Rosette
plate to be plate to be
fixed in low fixed in low
rise lift lobby rise lift lobby
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment
to be done in
high rise lift
lobby after
frame work.
1) Bfv handle 1) Red paint
orientation near welding
changed joints

2) Support not
given at
2) Drain line to
sprinkler end
be altered
near st-4 in 4
branches

3) Balcony
3) Clamps to area pendent
be fixed piping to be
properly changed to
upright
4) Clamps to
be fixed
properly

Yes Yes
Yes Yes

Yes, drain
No
pipe
Yes Yes
Yes Yes

2 Rosette cup
not fixed in
yes
washroom
area.
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

Yes Yes

Hrd interfering
with hv, chain Cap missing
⛓️not fixed for H.V.
properly
2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes

No No

No No

Yes Yes
1)H.V chain
not fixed Hosereel drum
properly interfering with
hydrant valve,
h.v wheel not
properly fixed
and chain not
present

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

Yes Yes

No No

Yes Yes
H. V cap not 1)HV chain
present missing

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1) Riser
temporary temporary
supports to be supports to be
removed removed

2) Riser 2) Riser
painting to be painting to be
done done
Yes Yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut, 1) H.V Nut,
bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes
No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No
7 8

1) Clamps to 1) L angle
be fixed support to be
properly given
2) Paint near
Welding joints,
drain line

3) Clamps to
be fixed
properly
Yes Yes

Yes Yes

No No

Yes Yes
Yes Yes

Yes Yes
1) Pending 1) Pending
near near
washroom washroom
area to be area to be
done after done after
frame frame
2) Pending 2) Pending
near St 1 to be near St 1 to be
done after done after
frame frame

1) Paint near 1) Paint near


Welding joints, Welding joints,
branches and branches and
sub headers sub headers
2) L angle 2) Clamps to
support to be be fixed
given properly

3) Clamps to
be fixed
properly
yes yes
yes yes

yes yes
No No

yes yes
1) Rosette 1) Rosette
plate to be plate to be
fixed in low fixed in low
rise lift lobby rise lift lobby
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment
to be done in
high rise lift
lobby after
frame work.

1)Red
Painting near
1) L angle
Welding joints,
support to be
st-3 lobby and
given
back side all
piping
2)Red
Painting near , 2)Painting for l
st-3 lobby angle support
piping

3) Clamps to 3) Clamps to
be fixed be fixed
properly properly
Yes Yes
Yes Yes

No No

Ok Ok

Yes Yes
Yes Yes

1) Rosette 1) Rosette
plate to be plate to be
fixed in low fixed in low
rise lift lobby rise lift lobby
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment
to be done in
high rise lift
lobby after
frame work.
1) Paint near
1) Clamps to
Welding joints,
be fixed
branches and
properly
sub headers

2) Red paint 2) L angle


near shaft support to be
tapping given

3) Piping
orientation to
be changed to 3) Clamps to
upright near be fixed
hoist area and properly
flexible to be
removed
Yes Yes
yes yes

No No

Yes Yes
yes yes

yes yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment 2) Alignment
to be done in to be done in
st4 after frame st4 after frame
work work
Yes Yes
1)H.V chain
Hv chain not
not fixed
fixed properly,
properly ,
Hrd interfering
HRD Not fixed
with hv
properly
2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes

No Yes

No No

Yes Yes
H.V chain H.V chain
missing missing

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

Yes Yes

No No

Yes Yes
1)HV chain to 1)HV chain to
be properly be properly
fixed, fixed,

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1)2 -150 u bolt


in riser pipe 1) Riser
missing , temporary
Temporary 25 supports to be
mm pipes to removed
be removed.

2) Riser 2) Riser
painting to be painting to be
done done
Yes Yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted
2)HV chain to 2)HV chain to
be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
2) Riser temporary
temporary supports to be
supports to be removed, 4-
removed 150 mm u bolt
to be fixed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut, 1) H.V Nut,
bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) 2 No.s of
150 mm u bolt
to be fixed

Yes Yes
Yes Yes

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

2) HV chain 2) HV chain
missing missing

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No
9 10

1) pendant 1) Paint near


given in place Welding joints,
of upright in Second coat
balcony area painting
2) Missing u
2) H2-9
clamps to be
branch
given and
support not
clamps to be
given
fixed properly

3) Hoist area
3) Drain line
pipe
below false
orientation to
ceiling
be changed

4) Clamps to 4) L angle
be fixed support to be
properly given
Yes Yes

Yes Yes

Yes, drain
No
pipe
Yes Yes
1 Upright to be
fixed after
Yes
change of pipe
orientation

Yes Yes
1) Pending 1) Pending
near near
washroom washroom
area to be area to be
done after done after
frame frame
2) Pending 2) Pending
near St 1 to be near St 1 to be
done after done after
frame frame
1) Back side
st-2 lobby
piping should 1) Only 2
be converted flexible pts
to upright and given in
upright washroom
sprinkler fixed area
for pendant
piping
2) Paint near
2) H1-11 Welding joints,
branch branches and
support not sub headers,
given Final coat
painting

3) Clamps to 3) L angle
be fixed support to be
properly given

4) Missing u
clamps to be
given and
clamps to be
fixed properly
yes yes
yes yes

yes yes
No No

yes yes
1) Rosette 1) Rosette
plate to be plate to be
fixed in low fixed in low
rise lift lobby rise lift lobby
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment
to be done in
st-2 lobby

3) Alignment
to be done in
high rise lift
lobby after
frame work.

1) Back side
1) Paint near
st-2 lobby
Welding joints,
piping should
branches and
be converted
sub headers
to upright
2) L angle
support to be
given

3) One upright
sprinkler point
to be given in
front of st-3
Lobby
4) Missing u
clamps to be
given and
clamps to be
fixed properly
Yes Yes
Yes Yes

No No

Ok

Yes Yes
Yes Yes

1) Rosette
plate to be
fixed in low
rise lift lobby
2) 1 upright
sprinkler to be
replaced with
pendant in
high rise lift
area
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment
to be done in
low riselobby
after frame
work for 1
flexible point
3) Alignment
to be done in
high rise lift
lobby after
frame work.
1) Paint near
1) Paint near l Welding joints,
angle support branches and
sub headers

2) L angle
support to be
given

3) One
number of
support at last
sprinkler point
to be given for
H1-10,
9,8,1,2,3,4
4) Missing u
clamps to be
given and
clamps to be
fixed properly

Yes Yes
yes yes

No No

Yes Yes
Yes yes

yes yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment
to be done in
st4 after frame
work
Yes Yes

1)H.V chain 1)H.V chain


not fixed not fixed
properly properly

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done
2) 2 No.s of
150 mm u bolt
not fixed

Yes Yes

Yes Yes

No No

Yes Yes
1) H.V cap
and chain
H.V chain
missing , HRD
missing
interfering with
HV

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser
painting to be 1)3 -150 u bolt
done in riser pipe
missing ,
Temporary 25
mm pipes to
be removed.
2) Riser
temporary 2) Riser
supports to be painting to be
removed done

Yes Yes

Yes Yes

No No

Yes Yes
1)HV chain to 1)HV chain to
be properly be properly
fixed, fixed,

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1)1 -150 u bolt


in riser pipe 1) Riser
missing , temporary
Temporary 25 supports to be
mm pipes to removed
be removed.

2) Riser 2) Riser
painting to be painting to be
done done
Yes Yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted
2)HV chain to 2)HV chain to
be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary 2) Riser
supports to be temporary
removed, 3 - supports to be
150 mm u bolt removed
to be fixed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut, 1) H.V Nut,
bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) 2 No.s of
150 mm u bolt
to be fixed

Yes Yes
Yes Yes

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

2)HV chain to
2) HV chain
be properly
missing
fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary
2) Riser
supports to be
temporary
removed, 2
supports to be
150 mm u
removed
bolts to be
fixed
Yes Yes

No No

No No
11 12

1) Missing u 1) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properly fixed properly
2) H2-5,9
2) L angle
25mm pipe
support to be
support not
given
given

3) Second 3) Second
coat painting coat painting

4) Pipe
orientation to
be changed to
upright and
flexible to be
removed near
hoist area
Yes Yes

Yes, ball valve


handle
Yes
interfering with
false ceiling

Must check for


No
50 ball valve
Yes Yes
Yes Yes

Yes Yes
1) Pending 1) Pending
near near
washroom washroom
area to be area to be
done after done after
frame frame
2) Pending 2) Pending
near St 1 to be near St 1 to be
done after done after
frame frame

1) Paint near
Welding joints
1) Missing u
and stair case
clamps to be
header and
given and
branches,
clamps to be
back side st2
fixed properly
and Final coat
painting
2) H1-1
alignment to 2) L angle
be done, H1-6 support to be
Support not given
given

3) Missing u
clamps to be
3) Second
given and
coat painting
clamps to be
fixed properly

4) H2-8 ball
valve to be
removed and
upright
sprinkler to be
fixed
yes yes
yes yes

yes yes

Ok
4) H2-8 ball
valve to be
removed and
Yes
upright
sprinkler to be
fixed
1) Rosette
plate to be
fixed in low
rise lift lobby
1) rosette cup
not fixed with
flexible in
washroom
lobby
3) Flexible to
be fixed in st-2
lobby

1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment
2) Alignment
to be done in
to be done in
high rise lift
st-2 lobby
lobby

1)Red 1) Missing u
Painting near clamps to be
Welding joints given and
and Final coat clamps to be
painting fixed properly
2) 100 mm u
bolt missing at
last l angle
2) L angle
support, 150
support to be
mm u bolt
given
missing at
First l angle
support
3) Missing u
clamps to be
3) Second
given and
coat painting
clamps to be
fixed properly
4) Flexible
interfering with
false ceiling i.e
coming below
false ceiling
level
Yes Yes
Yes Yes

Yes

Ok

Yes Yes
Yes yes

1) Rosette cup
to be fixed in
yes
washroom
area 2 flexible
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment 2) Alignment
to be done in to be done in
low riselobby high riselobby
after frame after frame
work work

3)Sprinkler not 3) Alignment


below false to be done in
ceiling level st-3 lobby
1)Red 1) Missing u
Painting near clamps to be
Welding joints, given and
Final coat clamps to be
painting fixed properly

2) Ball valve
2) L angle
handle
support to be
interfering with
given
false ceiling

3) Missing u
clamps to be
3) Second
given and
coat painting
clamps to be
fixed properly
4) Pipe
orientation to
be changed to
upright and
flexible to be
removed near
hoist area

Yes Yes
yes yes

Yes Yes
Yes yes

2) Rosette cup
to be fixed in
all areas
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment
2) Alignment
to be done in
to be done in
st4 after frame
st4
work
Yes Yes
H.V chain of
Cap missing cap missing
for H.V, Air
release valve
not fixed
2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes

Yes Yes

No No

Yes Yes
1)H.V chain
not fixed
properly 1) H.V cap
and chain
missing , HRD
interfering with
HV, 1 Arv
missing

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser
painting to be
done 1) Riser
painting to be
done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

Yes Yes

No No

Yes Yes
Hydrant valve
handle ,cap H.V chain of
and chain cap missing
missing
1) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted

1)3 -150 u bolt


in riser pipe 1) Riser
missing , temporary
Temporary 25 supports to be
mm pipes to removed
be removed.

2) Riser 2) Riser
painting to be painting to be
done done
Yes yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted
2)HV chain to 2)HV chain
be properly missing, 1 arv
fixed, missing
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) HRD Not
1) H.V chain
fixed Properly,
and cap
HV chain
missing
missing

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
2) 1 No.s of
temporary
150 mm u bolt
supports to be
to be fixed
removed
Yes yes
No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

2)HV chain to
be properly
fixed, 1 arv
miss
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary
supports to be
removed

Yes yes

No No

No No
13 14

1) Red paint
near welding
joints and
1) Paint touch shaft tapping
ups pipes,
branches,
Final coat
painting
2) Pipe
orientation to
be changed to 2) L angle
upright and support to be
flexible to be given
removed near
hoist area
3) Missing u
clamps to be
given and
clamps to be
fixed properly

4) Some pipes
are not
properly
aligned
5) Drain
welding
connection
piece to be
welded
Yes Yes

Yes Yes

Must check for


50 ball valve
Yes Yes
One upright One upright
sprinkler H2-2 sprinkler H1-2
branch to be branch to be
fixed fixed

1) 1 Pendant
1) 1 Rosette sprinkler to be
cup to be fixed fixed in
in st-1 washroom
lobby

2) 2 rosette
cup to be fixed
in washroom
lobby
1) Pending
near 1)To be done
washroom at St-1 after
area to be false ceiling
done after frame
frame
2) To be done
2) Pending
at washroom
near St 1 to be
lobby after
done after
false ceiling
frame
frame

1) Red paint
1) clamps to
near drain
be fixed
pipe and sone
properly
touch ups
2) L angle
2) Paint touch
support to be
ups
given

3) Some pipes
3) H1-15
are not
alignment to
properly
be done
aligned

4) Missing u
4) Drain pipe
clamps to be
leakage near
given and
riser
clamps to be
connection
fixed properly
yes yes
yes yes

yes yes

Yes Yes
1) 1 Pendant
1) 2 Rosette
sprinkler to be
cup to be fixed
fixed in
in washroom
washroom
lobby
lobby
1) 1 Pendant 1) 1 Pendant
sprinkler to be sprinkler to be
fixed in stair fixed in stair
case lobby case lobby

1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment 2) Alignment
to be done in to be done in
st-2 lobby st-2 lobby

1) Red paint
1) Painting of
near drain
drain and
pipe, welding
main line
joints and final
inside shaft
coating
2) Drain valve
2) L angle
handle
support to be
interfering with
given
false ceiling

3) Refugee
area rigid 3) Some pipes
drops to be are not
given to match properly
false ceiling aligned
level
4) One more
4) H2-15
sprinkler point
Alignment to
to be given in
be done
front of st-3
Yes Yes
Yes Yes

Yes Yes
yes yes

yes yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment 2) Alignment
to be done in to be done in
high riselobby high riselobby
after frame after frame
work work

3) Alignment 3) Alignment
to be done in to be done in
st-3 lobby st-3 lobby
1) Final coat
painting to be
done

2) L angle
support to be
given

3) Some pipes
are not
properly
aligned
4) 2 nut, bolts
to be fixed to
bfv

Yes Yes
yes yes

Yes Yes
yes Yes

Yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment 2) Alignment
to be done in to be done in
st4 st4

Yes Yes

2) HV chain 1) H.V Nut,


and cap bolt to be
missing painted

2) H.V Nut,
bolt to be
painted
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes

No No

No No

Yes Yes
1) H.V cap
Hrd interfering
and chain
with b.v
missing

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut, 1)HV chain to
bolt to be be properly
painted fixed,

2) H.V Nut,
bolt to be
painted

1) Riser 1) Riser
temporary temporary
supports to be supports to be
removed removed

2) Riser 2) Riser
painting to be painting to be
done done
yes yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted
2)HV chain to 2)HV chain to
be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut, 1) H.V Nut,
bolt to be bolt to be
painted painted

1) Riser 1) Riser
painting to be painting to be
done done
2) 1 No.s of 2) 2 No.s of
150 mm u bolt 150 mm u bolt
to be fixed to be fixed

yes yes
No No

No No

Yes Yes
1) H.V Nut, H.V chain of
bolt to be cap missing
painted,hrd to
be fixed
properly
1) H.V Nut,
2)HV chain to bolt to be
be properly painted
fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary
2) Riser supports to be
temporary removed
supports to be
removed

yes yes

No No

No No
15 16

1) For Some
Touch up, bfv
welding joints
nut, bolt to be
grinding to be
painted
done
2) Some pipe
Alignment to
be done

3) Final
Painting to be
done
Yes Yes

Yes Yes

No No

No Yes
Yes Yes

Yes Yes
1)To be done 1)To be done
at St-0 after at St-1 after
false ceiling false ceiling
frame frame

1) To be done 0) To be done
at washroom at washroom
lobby after lobby after
false ceiling false ceiling
frame frame

1)light Touch 1) light Touch


up, bfv nut, up, bfv nut,
bolt to be bolt to be
painted painted
2) H1-2, 3
branches
alignment to
be done
Yes Yes
Yes Yes

Yes Yes

Yes Yes
Yes Yes
2) To be done 2) To be done
in high rise lift in high rise lift
lobby after lobby after
frame work frame work
3) Alignment 3) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

1) Fit up H1-
Header, 1) light Touch
branches and up, bfv nut,
H2 some part bolt to be
header and painted
branches
2) Shaft
tapping with
drain
2) H1-B-3, 4
connection
Alignment to
and lift lobby
be done
piping,
surrounding
area piping

3) Stair case
lobby and
back side
piping
No
No

No
No

No

yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment 2) Alignment
to be done in to be done in
high riselobby high riselobby
after frame after frame
work work

3) Alignment 3) Alignment
to be done in to be done in
st-3 lobby st-3 lobby
1) Paint Touch 1) light Touch
up, bfv nut, up, bfv nut,
bolt to be bolt to be
painted painted
Yes Yes
Yes Yes

No No

Yes Yes
Yes Yes

Yes Yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment 2) Alignment
to be done in to be done in
st4 after frame st4 after frame
work work
Yes Yes

Handle of ball
1)H.V chain
valve missing,
not fixed
HV Cap
properly
missing
2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes

No No

No No

Yes Yes
1) H.V Nut, 1) H.V cap
bolt to be and chain
painted missing

2) HRD 2) H.V Nut,


interfering with bolt to be
HV painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut,
H.V chain of
bolt to be
cap missing
painted

2) H.V Nut,
bolt to be
painted

1) Riser 1) Riser
temporary temporary
supports to be supports to be
removed removed

2) Riser 2) Riser
painting to be painting to be
done done
yes yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted
2)HV chain to
2)HV chain
be properly
missing
fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) Only 3 1) H.V Nut,
fastners used bolt to be
for hrd painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done

yes yes
No No

No No

Yes Yes
H.V chain of
1) H.V Nut, cap missing,
bolt to be Ball valve
painted handle
missing
2)HV chain to 1) H.V Nut,
be properly bolt to be
fixed, painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

yes yes

No No

No No
17 18

Touch up, bfv


1) final coat
nut, bolt to be
painting
painted
2) Missing u
clamps to be
given and
clamps to be
fixed properly
Yes Yes

Yes Yes

No No

Yes Yes
Yes Yes

Yes Yes
1)To be done 1)To be done
at St-2 after at St-2 after
false ceiling false ceiling
frame frame

1) To be done 1) To be done
at washroom at washroom
lobby after lobby after
false ceiling false ceiling
frame frame

1) light Touch
up, bfv nut, 1) final coat
bolt to be painting
painted
2) Missing u
clamps to be
given and
clamps to be
fixed properly

3) H1-6, 7
alignment, H2-
7, 8 alignment
Yes Yes
Yes Yes

Yes Yes

Yes Yes
Yes Yes
1) To be done 1) To be done
at st2 stair at st2 stair
lobby lobby
2) To be done 2) To be done
in high rise lift in high rise lift
lobby after lobby after
frame work frame work
3) Alignment 3) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

1) light Touch
1) Final coat
up, bfv nut,
painting to be
bolt to be
done.
painted
2) H1 -3, 14
alignment to
be done
yes yes
yes yes

yes yes
yes yes

yes yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment 2) Alignment
to be done in to be done in
high riselobby high riselobby
after frame after frame
work work

3) Alignment 3) Alignment
to be done in to be done in
st-3 lobby st-3 lobby
Yes Yes
Yes Yes

No No

Yes Yes
Yes Yes

Yes Yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment 2) Alignment
to be done in to be done in
st4 after frame st4 after frame
work work
Yes Yes

1)H.V chain
H.V chain of
not fixed
cap missing
properly

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary
supports to be
removed
Yes Yes

No No

No No

Yes Yes
1)H.V chain
H.V ,chain of
not fixed
cap missing
properly

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary
supports to be
removed

Yes Yes

No No

No No

Yes Yes
1)HV chain to
1) HV chain
be properly
missing
fixed,

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1)1 -150 u bolt


temporary in riser pipe
supports to be missing and 1
removed 50 u bolt.

2) Riser 2) Riser
painting to be painting to be
done done
yes yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted
2)HV chain to 2)HV chain to
be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut,
bolt to be
1) H.V chain painted,
of cap missing additional
gasket to be
trimmed
2) H.V Nut, 2)HV chain to
bolt to be be properly
painted fixed,
1) Riser 1) Riser
painting to be painting to be
done done

yes yes
No No

No No

Yes Yes

1) H.V Nut,
H.V chain of
bolt to be
cap missing
painted

1) H.V Nut,
2) HV chain
bolt to be
missing
painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
2) 2 - 150 mm
temporary
u bolts
supports to be
missing
removed

yes yes

No No

No No
19 20

1) L angle 1) L angle
supports to be supports to be
given given
2) final coat 2) final coat
painting painting

3) Missing u 3) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properly fixed properly

4) Drain line 2 4) Drain line to


welding joints be connected
pending to riser
5) Hoist lift
area upright
piping to be
done

Yes Yes

Yes Yes

Bfv leakage to
be rectified

No No

Yes Yes
Yes Yes

Yes Yes
1)To be done 1)To be done
at St-2 after at St-1 after
false ceiling false ceiling
frame frame

1) To be done 0) To be done
at washroom at washroom
lobby after lobby after
false ceiling false ceiling
frame frame

1) L angle 1) Drain line to


supports to be be connected
given to riser
2) final coat 2) final coat
painting painting

3) Missing u 3) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properly fixed properly

4) Lift lobby 4) Lift lobby


only 3 only 3
sprinkler sprinkler
points given points given
5) Drain line 1
welding joint
pending

6) H2, B10,
11,15,H1-15
pipes
alignment

Yes Yes
Yes Yes, partial

Yes Yes
No

Yes Yes
Yes Yes
1) To be done 1) To be done
at st2 stair at st2 stair
lobby lobby
2) To be done 2) To be done
in high rise lift in high rise lift
lobby after lobby after
frame work frame work
3) Alignment 3) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

1) Drain line 1 1) Drain line to


welding joint be connected
pending to riser
2) 1 L angle 2) 1 L angle
supports to be supports to be
given at 100 given at 100
pipe end pipe end

3)final coat 3)final coat


painting painting
4) Missing u 4) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properly fixed properly

5) Lift lobby
5)H2 -15
only 3
alignment to
sprinkler
be done
points given
6) H2 Last tie
rods to be
replaced.

yes yes
yes yes, partial

No

yes Yes
H2 14 branch,
one ball valve
to be removed
yes
and upright
sprinkler to be
fixed

yes yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment 2) Alignment
to be done in to be done in
high riselobby high riselobby
after frame after frame
work work

3) Alignment 3) Alignment
to be done in to be done in
st-3 lobby st-3 lobby
1) L angle 1) L angle
supports to be supports to be
given given

2)final coat 2)final coat


painting painting

3) Missing u 3) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properly fixed properly
4) Drain line to 4) Drain line to
be connected be connected
to riser to riser

5) One
additional flow
switch to be
taken out

Yes Yes
Yes, partial Yes, partial

No No

Yes Yes
Yes Yes

Yes Yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment 2) Alignment
to be done in to be done in
st4 after frame st4 after frame
work work
Yes Yes

1)H.V chain
H.V chain of
not fixed
cap missing
properly

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary
supports to be
removed
Yes Yes

No No

No No

Yes Yes
1) H.V Nut,
H.V ,chain of
bolt to be
cap missing
painted

2) H.V Nut,
bolt to be
painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1)HV chain to
be properly 1)HV chain to
fixed, ball be properly
valve handle fixed,
missing
2) H.V Nut, 2) H.V Nut,
bolt to be bolt to be
painted painted
1)2 -150 u bolt 1)2 -150 u bolt
in riser pipe in riser pipe
missing and 1 missing and 1
50 u bolt, 50 u bolt,
Temporary 25 Temporary 25
mm pipes to mm pipes to
be removed. be removed.
2) Riser 2) Riser
painting to be painting to be
done done
yes yes

No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted
2)HV chain to 2)HV chain to
be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes Yes

No No

No No

Yes Yes
1) H.V Nut, 1) H.V Nut,
bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser
temporary
supports to be
removed
yes yes
No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

2)HV chain to
2) HV chain
be properly
missing
fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

yes yes

No No

No No
21 22

1) L angle
1) Header fit
supports to be
up to be done
given
2) All 2) Painting at
branches to joints and final
be erected coat painting

3) Missing u
clamps to be
given
No Yes

No Yes

No

No Yes
No Yes

No Yes
1)To be done 1)To be done
at St-0 after at St-1 after
false ceiling false ceiling
frame frame

1) To be done 2) To be done
at washroom at washroom
lobby after lobby after
false ceiling false ceiling
frame frame

1) L angle 1) L angle
supports to be supports to be
given given
2) Painting at
2) final coat
joints and final
painting
coat painting

3) Missing u 3) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properlyfixed properly
4) branches
alignments to
be done.
4) Some pipe
Header 1 -3,
alignments to
4,washroom
be done
pipe , 15
Header 2-
7,8,15
5) All big tie
5) Lift lobby
rods to be
only 3
removed and
sprinkler
replaced for
points given
branches

Yes Yes
Yes Yes

Yes No
No

Yes Yes
Yes Yes
1) To be done 1) To be done
at st2 stair at st2 stair
lobby after lobby after
false ceiling false ceiling
frame work frame work
2) To be done 2) To be done
in high rise lift in high rise lift
lobby after lobby after
frame work frame work
3) Alignment 3) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

1) Lift lobby
1) Drain elbow
only 3
after ball valve
sprinkler
not welded
points given
2) Final coat 2) L angle
painting to be supports to be
done. given

2) L angle
3)final coat
supports to be
painting
given
4) Missing u 4) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properly fixed properly

5) H1 offset 5) Header 1
branches tie Branch 3,4
rod to be support not
replaced given
6) Header 1
6) Refugee near end
area piping to alignment not
be adjusted to proper, branch
match false 15 alignment
ceiling level not proper,
after frame H2-B15
work Alignment not
proper

7) Some pipe
alignments to
be done

yes Yes
yes Yes

No

yes Yes
yes Yes

yes Yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work

2) Alignment 2) Alignment
to be done in to be done in
high riselobby high riselobby
after frame after frame
work work
3) Alignment
to be done in 3) Alignment
st-3 lobby to be done in
after frame st-3 lobby
work
1) L angle 1) L angle
supports to be supports to be
given given

2)final coat 2)final coat


painting painting

3) Missing u 3) Missing u
clamps to be clamps to be
given and given and
clamps to be clamps to be
fixed properly fixed properly
4) Welding for
150 pipe joints 4) H2-B9,8
to be Alignment not
completed and proper H1 -B4,
all branch 5,6,7
welding joints Alignment not
to be proper
completed

5) St4 branch
to be given

Yes Yes
No Yes

No

No Yes
No Yes

No Yes
1) Alignment 1) Alignment
to be done in to be done in
washroom washroom
lobby after lobby after
frame work frame work
2) Alignment 2) Alignment
to be done in to be done in
st4 after frame st4 after frame
work work
Yes Yes

Hose reel
1) HV chain
drum not fixed
missing
properly

2) H.V Nut, 2) HV chain


bolt to be not fixed
painted properly
1) Riser 1) Riser
painting to be painting to be
done done

Yes Yes

No No

No No

Yes Yes
1) H.V cap 1)H.V chain
and chain not fixed
missing properly

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

Yes No

No No

No No

Yes Yes
1) H.V cap 1)HV chain to
and chain be properly
missing fixed,

2) H.V Nut, 2) H.V Nut,


bolt to be bolt to be
painted painted

1)1 missing
150 u bolt in
1) Riser
riser pipe,
painting to be
Temporary 25
done
mm pipes to
be removed.

2) Riser
painting to be
done
yes yes

No No

No No

Yes Yes

1) H.V Nut,
1) HV chain
bolt to be
missing
painted
2)HV chain to 2) H.V Nut,
be properly bolt to be
fixed, painted
1) Riser
1) Riser
temporary
painting to be
supports to be
done
removed
2) Riser
2) Riser
temporary
painting to be
supports to be
done
removed

No No

No No

No No

Yes Yes
1) H.V Nut, 1) H.V Nut,
bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done

yes yes
No No

No No

Yes Yes

1) H.V Nut, 1) H.V Nut,


bolt to be bolt to be
painted painted

2)HV chain to 2)HV chain to


be properly be properly
fixed, fixed,
1) Riser 1) Riser
painting to be painting to be
done done
2) Riser 2) Riser
temporary temporary
supports to be supports to be
removed removed

yes yes

No No

No No
Actu Bala
No.of al to nce
Terrace Instal be to be
led Instal instal
led led
21 22 1

20 22 2

20 22 2
22 22 0
19 22 3

20 22 2
20 22 2
18 22 4

20 22 2
22 22 0
19 22 3

0 22 22

21 22 1
Yes

ARV fixed
1) Riser
painting to be
done

No 22 23 1

No 7 23 16

No 0 23 23

Yes 23 23 0
ARV not fixed
No 21 23 2

No 12 23 11

No 0 23 23

Yes 23 23 0
ARV not fixed
yes 23 23 0

No 2 23 21

No 0 23 23

Yes 23 23 0

Wall plastering
not yet done,
ARV Not fixed
No 20 23 3

No 2 23 21

No 0 23 23

Yes 23 23 0
1) Wall
plastering not
yet done,
gasket too big,
ARV Not fixed

No 22 23 1
No 6 23 17

No 0 23 23

Yes 23 23 0

ARV Fixed,
Gasket too big
yes 23 23 0

No 2 23 21

No 0 23 23