You are on page 1of 6
KEMENTERIAN PENDIDIKAN, KEBUDAYAAN, RISET DAN TEKNOLOGI POLITEKNIK NEGERI MEDAN JL, Almamater No. 1 Kampus USU, MEDAN - 20155 ‘Telp. (061)8210436, 8211235 / Fax. (061)8215845 btp:www polmed.ac.id, e mail : polmed @polmed. acid, info@polmed ac id So LAPORAN PENGUJIAN FREE DRAINING GRANULAR MATERIAL Pemohon : PT. HUTAMA KARYA Persero Proyek :Pembangunan Jalan Tol Kuala Tanjung - Inderapura (Sta. 04000 sd Sta. 154600) termasuk Simp, susun Inderapura serta Main Road JI. Tol Tebing Tinggi - Inderapura (Sta, 106+650 - Sta, 109+100) termasuk Junction Inderapura (Seksi 2) Asal Material: Sei Suka, Kab. Batu Bara POLITEKNIK NEGERI MEDAN JULI 2022 Lf KEMENTERIAN PENDIDIKAN, KEBUDAYAAN, RISET DAN TEKNOLOGI POLITEKNIK NEGERI MEDAN JL Almamater No. | Kampus USU, MEDAN - 20155 Telp. (061)8210436, 8211235 / Fax. (061)8215845 hitp:www.polmed.ac.id, e mail : polmed @polmed.ac.id, info@polmed.ac.id PENGANTAR Job Order: 78/LB/TNH.01/2022 No. SPK _: BASI/PLS/HM.02,00/2022 Hal Laporan Pengujian Tanah Lampiran:- Kepada Yth. Bapak/Ibu Pimpinan PT, HUTAMA KARYA Persero di ‘Tempat Dengan hormat, Sehubungan dengan surat permohonan no. PKT/RS.26/EXT/VI/2022 tertanggal 10 Juli 2022 yang di sampaikan kepada kami untuk melakukan pengujian material tanh pada pekerjaan sebagai berikut Proyek Pemb. Jalan Tol Kuala Tanjung - Inderapura (Sta. 0+000 s.d Sta. 15+600) termasuk Simpang susun Inderapura serta Main Road JI, Tol T. Tinggi ~ Inderapura (Sta. 1064650 - Sta. 109+100) termasuk Junction Inderapura (Seksi 2) Asal Sei Suka, Kab, Batu Bara ‘maka dapat kami sampaikan bahwa pekerjaan tersebut telah kami selesaikan sesuai dengan material yang di terima dan dilaksanakan menurut standar pengujian laboratorium (data pengujian terlampir) Demikian ini disampaikan, semoga kerjasama dengan Institusi kami (Politeknik Negeri Medan) dapat terus terjalin dengan baik. Atas perhatian dan waktunya diucapkan terima kasi, Medan, 18 Juli 2022 Dibuat, Kepala Laboratorium Teknik Sipil Politeknik Negeri Medan |. Ari Subhan Harahap, S.T., M-T. 199801 1 001 NIP 19781203 200212 1 001 Page 1 of2 KEMENTERIAN PENDIDIKAN, KEBUDAY AAN RISET DAN TEKNOLOGI POLITEKNIK NEGERI MEDAN JURUSAN TEKNIK SIPIL. JL Almamater No. | Kampus USU, MEDAN - 20155 ‘Telp. Jurusan Teknik Sipil : (061) 77080264, Fax. 061-8219686 Dikerjakan : Adityo, Ferdinan Ginting Femb Jalan Tot Kuala Tanjung - Inderapura (Sta. 0+00N0sd Sta. 154600) proses ° Ferdinan Ginting {ermasuh Simpang susun Inderapura scria Main Road JI. Tol T. Tinga - Diperiksa Ir. Ependi Napitu..M.T. Inderapura (Sta. 1064650 - Sia, 109100) ermasuh Junction inderapura Job Order. = 78/LB/TNH 01/2022 (Seksi 2) No SPK BAD|/PLS1IM 02.00/2022 Free Draining Granular Material (Pasir) Sci Suh, Kab, Batu Bara ‘Summary of Laboratory Tea No. Ce) No.4 No 10 Gradasi (Kumutatit |No 20 Lotos dalam %) |g yy Tenis Pemeriksaan Tas 100,000] Io 60 No 100 No 200 LL Aterherg Limit PL NON PLASTIS, w 0.001 Permeability (KT@C) 134.98] Demikian data pengujian ini kami sampaikan untuk dapat dipergunakan eebagaimana mestinya pad peherjaan _yang Bapal/Tbu pimpin. Atas perhotian dan herjsamanysa diucapkan \erimakasih Medan, 18 Juli 2022 Telausi Laboratorium ras & ao Napitu, MT. nan Ginting, A.M NIP Losx092s voKI03 1 001 (NIH 19811 1082006770127 Telp. Jurusan Teknik Si LABORATORIUM TEKNIK SIPIL_ POLITEKNIK NEGERI MEDAN JL. Almamater No. 1 Kampus USU, MEDAN - 20155 il : (061) 77050264, Fax. 061-8219686 (uar Proyek Pemohon : PT. HUTAMA KARYA Persero PPemb. Jalan Tol Kuala Tanjung -Inderapura (Sta. 04000 s Sta 154800) termasuk Sp. susun Indorapura cota Main Road J. Tol T. Tinggi Inderapura (Gta, 105850 - Sta. 109+100) terrasuk Junction Inderapura (Seksi2) Sample: Free Draining Granular Materia (Pas?) ity Sel Suka, Kab. Batu Bara Diy Diproses Diperksa Tanggal 400 Order Adiyo, Ferdnan Gicting Ferdinan Gintng Ir. Ependi Napa, MT. 13 Juli 2022 TAILBITNH.01/2022, % Commulatve Ne Retaining | Passing Note 38" 0,00} 100,09] ECeeeeeeee No. 4 ~~ 0,00) 100,09] No. 10 3,85] 96,15] No. 20 39,14] 60,86] No. 40 76,38] _23.82| No. 60_ 94,10] 5,20| No. 100 1.49] 7 No. 200 088] PAN _ a Total Weight ‘Sample Weight ‘Test Temperatur cs Date | Elapsed | Hydrometer] True] Effective ] Partie Percentage | __Totar Time | Time | Reading | Reading | Depth | Diameter |Finer Than 0} Percentage (minutes) |__Rht Rh | He(mm) | D(mm) | P(%) % ‘Commutative Passing () LABORATORIUM TEKNIK SIPIL POLITEKNIK NEGERI MEDAN Ji. Almamater No. 1 Kampus USU, MEDAN - 20155 Telp. Jurusan Teknik Sipil : (061) 77050264, Fax. 061-8219686 Pemohon PT. HUTAMA KARYA Persero Ayo, Fertinan G Proyek Pemb, Jalan Tol Kuala Tanjung -Inderapura (Sta, 0-000 sd Sta, 15+600) Ferdinan Gintng termasuk Sp. susunIndrapura sera Moin Road J. ToT. Tinggi - Inderepura ie Epon Napit MT. (Sta, 105+650 - Sta 109+100)termasuk Juncton Inderapura (Seksi 2) 132072 Material Free Draining Granular Material (Pas) los no. 40 Tanertnnovr0e Asal Matoril Sei Suka, Kab, Batu Bara Atterberg Limit (SNI 03-1966-1990 dan SNI 03-1967-1990) Number of Blow 10 20 30 40 PL PI [Container W. of Cont. + Wet Soll_ (gram) W. of Cont. + Dry Soil (gram) Weight of Water (gram) Weight of Cont (gram) Weight of Dy Soil (gram) Moist. Content (%) GRAFIK ATTERBERG LIMIT Kadar Air (%) Jumlah Pukutan Liquid Limit (LL) % Plastis Limit ( PL) % Plastic Indeks ( PI! (LL-PL) = LABORATORIUM TEKNIK SIPIL POLITEKNIK NEGERI MEDAN JL. Almamater No. 1 Kampus USU, MEDAN - 20155 Telp. Jurusan Teknik Sipil : (061) 77050264, Fax. 061-8219686 Pemchon _ : PT. HUTAMA KARYA Persero Dikerjakan Ferdinan Gining, Ayo, Proyek Pemb.Jalan To Kuala Tanjung -Inderapura (Sta. 0+000 sd Sta. 15600) Diproses Ferdinan Ging fermasuk Sp. susun Inderapura seta Main Road J. ToT. Tingpi-Inderapure Dperksa Ir. Epondi Napitu, MT (Gta. 106+650 -Sta, 109100) termasuk Junction Inderapura (Seks! 2) ToL Ui 15 Jui2022, Material: Free Draining Granular Material (Past) Job Order TAILBITNH012022. Asal Material: Sei Suka, Kab, Batu Bara PERMEABILITY TEST (CONSTAN HEAD METHOD) ta Measure Sapa r Permearet: Test D 06160 m A 0,00286 m? To Ten Tae a Tesinunber] Sample tee 0 . caer | (To) Win [at wl fo rth 1 ona a ax oats] onzas] ogo 2 aug al 2x oars} goezas] gots 3 org a 20 oats} opnzza] ors Tree THT Pec reer SCeene eer cee Se tee ee Oe Constan Head Methode Rumus : KT =Q.L/Ant0 Catatan : Koefision K berdasarkan suhu ruang pengujian (Belum terkoreksi pada suhu 20%) Dimana KT = Coefficient of Permeability at T 0° t ‘Time of discharge (second) a nh ead registered on the manometer (cm) A Cross-sectional area of the sample (cm?)

You might also like