1. SFD presented a total outlay of Ongoing Portfolio comprises of total 13 development projects
around $ 1.6 billion Status of each project is attached at (Annex A)
(S1.2billion loans and $ 400 million grants) 0 9 grants worth $ 230 million
0 4 loans worth $ 404 million
06 Pipeline Projects worth $500 million (loan)
Total portfolio including Ongoing and Pipeline projects is
$1.13 billion
Financing facility for the Import of Saudi Goods on
Deferred Payments worth $1.2 billion signed by EAD and
handled by Ministry of Petroleum
2. Out of the total funds, around $550 During visit of Prime Minister of Pakistan to Saudi Arabia (7-9
million ($500 million loans and $50 May, 2021), Framework Memorandum of Understanding
million grants) were still not allocated amounting to US$ 500 million was signed between Pakistan
to any project due to delays in response and Kingdom of Saudi Arabia for the financing of potential
from our side. (Pipeline) projects in Infrastructure development, Power
Generation and Energy Sector including the following: Status
of each project is attached at (Annex B)
i. Mohmand Dam Project
ii. Shounter Hydropower project
ii. Jamshoro Power Generation Project
iv. 22 MV Jagran IV Hydropower Project
V. Gravity Flow Water Scheme Mansehra, KPK
vi. Abbottabad- Muzaffarabad Road Project
There are no unallocated $50 million grants in record.
3. The SFD was facing some obstacles in There are 3 grant funded projects in Balochistan as follows:
executing 4-5 grant funded project in i. Reconstruction of Permanent Houses in Awaran,
Balochistan due to issues related to Balochistan $25 million
coordination with Economic Affairs ii. ivelihoods Restoration in Balochistan $1.5 million
Division EAD) and agencies ii. Construction of Government Buildings in Awaran,
nominated by Pakistan.
Balochistan $ 1 million
4. The King Salman Hospital in PWD started the process for hiring of consultant in accordance
Tarlai, Islamabad (a grant funded to SFD guidelines in year 2018,2019 & 2020 but the process
project of around $26 million) was did not get matured three times and was advised to be revised
facing.delays due to the failure of by SFD on technical issues. The final process of hiring of
PWD as the executing agency. The consultant was initiated with advertisement on SFD website on
EAD had proposed to transfer the 23-02-2021. The firms were prequalified and bids were sought
project from the PWD and FWO. from prequalified firms. After technical evaluation, financial
bids were opened. Consequently, work was awarded to lowest
bidder M/s Zuhair & Fayyaz Partnership vide SFD letter
dated 23-06-2021.
During the visit of Delegation of SFD on 2-3 March 2022 under DG
of Asia Operations SFD, the Ambassador and the DG requested to
give the project to FWO for execution instead of PWD.
FWO officers came along with Ambassador's staff and
attended the same meeting and asked to share the copies of
MoUs for their internal consultation and processing. Since that
time, FWO has notresponded back and the FWO officer who
attended the meeting was contacted several times
telephonically by the concerned EAD officer and FWO
representative responded that they are seeking clarifications on
some queries from the Embassy and on the receipt ofresponse
of queries further action will be taken.
5. The Loan Agreement for During the visit of the SFD delegation to Pakistan in early
Mohamand Dam Hydro Power March 2022, a portfolio review meeting was held between the
Project worth $250 million was executing agencies and SFD delegates. In that meeting, SFD
near finalization, pending approval coiveyed to WAPDA that it can fund the project only if the
from Pakistan side; contractors are hired as per their procurement guidelines.
The Director General Ayid also Whereas WAPDA responded that the work has already been
recommended that during the SFD awarded and, at this stage, it is difficult to comply with the
team visit, the loan Agreement for SFD condition. WAPDA was finally able to convince SFD on
Mohammad Dam Hydro Power its terms.
project may be finalized. And Finally, SFD agreed to WAPDA's terms and shared the initial
stressed upon the need for finalizing
draft on 8th September 2022. The initial draft is vetted by
the project for unassigned funds of WAPDA, Ministry of Finance, Ministry of Law & Justice and
$550 million at the earliest. FBR. Comments have been shared with SFD on 4th Oct 2022.
6. So far, the SFD had not received Status of each project is attached at Annex B.
any response from Pakistan side on
Jamshoro Power Generation,
Jagran-IV Hydro Power, Shounter
Hydro Power, Mansehra Water
Supply and Abbottabad-
Muzaffarabad Road Projects. He
requested for a final word from the
Pakistan side whether to consider
these projects or otherwise.
7. Grant King Salman Bin Abdul Aziz Hospital Tarlai, Islamabad 20 million
10.Grant Equipping Hayaserai Hospital with Medical Equipment and 0.6 million
Furniture
11. Grant ipping and Furnishing King Abdullah Bin Abdul Aziz 10million
Campus at University of AJ&K
12. Grant Grant Equipping King Abdullah Bin Abdul Aziz Teaching 5.5 million
Hospital with medical equipment and Furniture, Mansehra
13 Grant Construction of Govt. Buildings in Awarar Balochistan 1.0 million
STATUS OF PIPELINE PROJECTS Annex B
Sr. Projects
No Status
1. Mohmand Dam Project
US$240 million During the visit of the SFD delegation to Pakistan on 2-3 March
review meeting was held between the 2022, a portfolio
that meeting, SFD
executing agencies and SFD delegates. In
conveyed to WAPDA that it can fund the project only
contractors are hired as per their if the|
procurement guidelines. Whereas WAPDA
responded that the work has already been awarded and, at this stage, it is difficult
to
comply with the SFD condition. WAPDA was finally able to convince SFD
on its terms.
Finally, SFD agreed to WAPDA's terms and shared the initial draft on
8t
September 2022. The initial draft is vetted by WAPDA, Ministry of Finance,
Ministry of Law & Justice and FBR. Comments have been shared with SFD on
4th October 2022.
Jamshoro Power
Generation Project Ministry of Energy on 12th October 2021 informed that the Project has not been
US$91 million selected/ optimized by the tool on the least cost basis in Indicative Generation
Capacity-Expansion Plan (IGCEP) i.e. IGCEP 2021-30.
Vide thisMinistry's letter dated 22nd October 2021, SFD has been requested to
divert $91 million of this project to any other project signed under this
memorandum preferably project at Sr. No.6 below.
Subsequently SFD was reminded via emaildated21s" April 2022
5. Shounter Hydro Power Executing agency is PDO Power Development Organization, AJK Govt.
Project .PCI ofthe project is cleared from CDWP for consideration of ECNEC on 04
USS 66 million 06-2022. After approval from ECNEC, we may proceed for signing of
agreement.
6. Gravity Flow Water Revised PCIofthe project is submitted by Public Health Engineering
Scheme Mansehra Department KP Govt, to CDWP on 04-04-2022 for approval. After approval we
this week.
PKR 616.172 Mn Not yet released
| 3. Pending Final Bills at Different
by the SFD
Contractors
SFD