You are on page 1of 11

Jindal Urban Waste Management (Ahmedabad) Ltd.

Date: 07/11/2022

PIPE LINE LEAKAGES PHOTOS

02 “ HDPE Flange Joint Leak


04 “ HDPE Flange Area Leakage
04 “ HDPE Flange Leakage at Valve area
03 “ HDPE Blind Flange Leakage
03 “ NRV Leakage
03 “ Saddle clamp leakage
2 “ HDPE Pipe Joint Leakage at Batching Plant
2 “ HDPE Pipe Joint Leakage at Batching Plant

2” HDPE Pipe Joint leakage


02 “ Flange leakage
3 “ Valve Flange Leakage
2” Valve Flange Joint leakage

2” HDPE Joint Mismatch

You might also like