CRONOGRAMA VALORIZADO

PROYECTO: “CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CAPCAS, DISTRITO DE COLCABAMBA, TAYACAJA –
HUANCAVELICA”.
febrero marzo abril mayo junio julio agosto Total
PRESUPUESTO TOTAL DE OBRA
INFRAESTRUCTURA DE RIEGO
OBRAS PRELIMINARES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M S/.428.99 S/.428.99
ALMACEN Y CASETA DE GUARDIANIA S/.2,520.00 S/.2,520.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS S/.551.00 S/.551.00
PLACA RECORDATORIA S/.412.21 S/.412.21
CAPTACION TIPO BOCATOMA (1.00 UNID)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL S/.37.26 S/.37.26
TRAZO Y REPLANTEO PRELIMINAR S/.282.59 S/.282.59
TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO S/.282.59 S/.282.59
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL S/.1,576.15 S/.1,576.15
REFINE Y NIVELACION EN TERRENO NORMAL S/.254.88 S/.254.88
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO SELECCIONADO S/.2,122.40 S/.2,122.40
ELIMINACION MANUAL DE MATERIAL EXCEDENTE HASTA 30.00MT S/.162.40 S/.162.40
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO 1:10 C:H, E=2" S/.650.62 S/.650.62
CONCRETO F¨C= 140 kg/cm2 EN TUB. DE LIMPIEZA Y REBOSE S/M S/.1,190.89 S/.1,190.89
PISO ASENTADO C/MAMPOSTERIA DE PIEDRA C:H 1:5 S/.2,959.42 S/.2,959.42
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS S/.491.72 S/.491.72
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 EN CAPTACION S/.6,300.95 S/.6,300.95
ENCOFRADO Y DESENCOFRADO DE MUROS S/.3,244.70 S/.3,244.70
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.1,445.01 S/.1,445.01
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZC. 1:5; E=1.5CM S/.767.64 S/.767.64
TARRAJEO EN EXTERIORES MEZC. 1:5; E=1.5CM S/.565.10 S/.565.10
PINTURA
PINTURA ESMALTE EN MUROS EXTERIORES DE CAPTACION S/.573.45 S/.573.45
PINTURA EN CARPINTERIA METALICA S/.1.02 S/.1.02
ACCESORIOS VARIOS DE CAPTACION
COMPUERTA TARJETA TIPO CANAL SECCIÓN (20cm x 30cm) S/.526.36 S/.526.36
VALVULA COMPUERTA DE BRONCE D=4" S/.254.48 S/.254.48
RESERVORIO 122.00 m³ ( 01 UNDS )
OBRAS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE RESERVORIOS S/.217.76 S/.217.76
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO S/.10,271.63 S/.10,271.63
RELLENO CON MATERIAL PROPIO CON EQUIPO S/.3,040.29 S/.3,040.29
ELIMINACION MANUAL DE MATERIAL EXCEDENTE HASTA 30.00MT S/.6,806.03 S/.6,806.03
OBRAS DE CONCRETO SIMPLE
SOLADO C:H 1:10 E=4" S/.1,126.29 S/.1,126.29
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO F'C=175 KG/CM2 S/.7,646.04 S/.7,646.04
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.1,141.79 S/.1,141.79
MUROS DE RESERVORIO
CONCRETO F'C=210 KG/CM2 S/.16,944.59 S/.16,944.59
ENCOFRADO Y DESENCOFRADO S/.9,186.09 S/.9,186.09
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.6,477.08 S/.6,477.08
SUM. E INSTALACIÓN DE WATER STOP 6" S/.766.08 S/.766.08
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE S/.3,594.88 S/.3,594.88
PISO TERMINADO CON IMPERMEABILIZANTE S/.1,476.00 S/.1,476.00
TARRAJEO EN EXTERIORES MEZC. 1:5; E=1.5CM S/.1,463.95 S/.1,463.95
PINTURA

Página 1
CRONOGRAMA VALORIZADO
PROYECTO: “CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CAPCAS, DISTRITO DE COLCABAMBA, TAYACAJA –
HUANCAVELICA”.
febrero marzo abril mayo junio julio agosto Total
PINTURA ESMALTE EN MUROS EXTERIORES S/.1,601.44 S/.1,601.44
ACCESORIOS PARA SALIDA DE RESERVORIO
VALVULA DE MAZA D=4" S/.751.88 S/.751.88
DADOS DE CONCRETO F'C=175 KG/CM2 S/.4.24 S/.4.24
CODO PVC SAL 4"X90° S/.310.90 S/.310.90
TEE PVC-SAP 4"* 4" S/.37.94 S/.37.94
CONO DE REBOSE DE PVC DE 6" A 4" S/.40.53 S/.40.53
TUBERIA PVC DN=4" S/.77.22 S/.77.22
ESCALERA METALICA TIPO GATO S/.533.84 S/.533.84
CERCO PERIMETRICO
TRAZO Y REPLANTEO S/.84.83 S/.84.83
EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.24.56 S/.24.56
CONCRETO CICLOPEO FC=140 KG/CM2 + 30 % PM. S/.174.80 S/.174.80
COLOCACION DE TUBERIA DE FIERRO NEGRO 2 1/2" X 2.5 mm S/.1,430.24 S/.1,430.24
COLOCACION DE BASTIDOR CON ANGULO DE FIERRO 1 1/2" x 1 1/2" Y MALLA CRIPTADA DE 2" #10 S/.8,465.55 S/.8,465.55
ALAMBRE DE PUA Nº 12 S/.149.85 S/.149.85
PUERTA DE CERCO PERIMETRICO SEGUN DISEÑO S/.2,300.00 S/.2,300.00
TOMAS LATERALES (17.00 UNIDADES)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO S/.76.91 S/.76.91
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.655.11 S/.655.11
RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.432.41 S/.432.41
CONCRETO SIMPLE
SOLADO C:H 1:10 E=2" S/.522.44 S/.522.44
CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2 S/.2,468.20 S/.2,159.67 S/.4,627.87
ENCOFRADO Y DESENCOFRADO S/.2,095.79 S/.762.11 S/.2,857.90
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.2,258.39 S/.372.74 S/.2,631.13
VARIOS
TARRAJEO MEZCLA 1:5 S/.1,199.03 S/.1,199.03
TAPA METALICA DE 0.85m X1.05m CON PLANCHA ESTRIADA DE 1/8" INC/MARCO S/.2,478.53 S/.177.04 S/.2,655.57
PINTURA ANTICORROSIVA EN REJILLA S/.337.85 S/.122.86 S/.460.71
ACCESORIOS VARIOS
TEE HDPE DE 110 MM A 90 MM S/.3,833.33 S/.3,833.33
ADAPTADOR MACHO DE HDPE 100 MM S/.2,160.36 S/.2,160.36
VALVULA COMPUERTA DE BRONCE D=4" S/.4,202.40 S/.4,202.40
NIPLE DE F° G° DE 0.15 M X 4" S/.1,366.80 S/.1,366.80
UNIÓN UNIVERSAL DE PVC 4" S/.2,946.10 S/.2,946.10
CAJA HIDRANTE TIPO I (153 UNIDADES)
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE S/.98.95 S/.20.39 S/.119.34
TRAZO Y REPLANTEO S/.573.92 S/.118.25 S/.692.17
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.5,620.86 S/.2,043.95 S/.7,664.81
NIVELACION Y COMPACTACIÓN S/.398.53 S/.234.89 S/.633.42
RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.1,176.22 S/.1,029.19 S/.2,205.41
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.4,184.48 S/.4,184.48
CONCRETO SIMPLE
SOLADO C:H 1:10 E=2" S/.109.71 S/.125.39 S/.235.10
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 S/.14,104.20 S/.32,909.80 S/.47,014.00
ENCOFRADO Y DESENCOFRADO S/.8,573.71 S/.17,147.43 S/.25,721.14
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.9,471.99 S/.14,207.99 S/.23,679.98
VARIOS
TARRAJEO EN MEZCLA. 1:5; E=1.5CM S/.4,780.03 S/.19,120.10 S/.23,900.13
TAPA METALICA DE 0.85m X1.05m CON PLANCHA ESTRIADA DE 1/8" INC/MARCO S/.1,984.20 S/.11,243.81 S/.13,228.01
PINTURA ANTICORROSIVA EN TAPA METALICA S/.2,072.83 S/.2,072.83

Página 2
CRONOGRAMA VALORIZADO
PROYECTO: “CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CAPCAS, DISTRITO DE COLCABAMBA, TAYACAJA –
HUANCAVELICA”.
febrero marzo abril mayo junio julio agosto Total
ACCESORIOS
ACCESORIOS PARA HIDRANTES S/.5,487.85 S/.27,439.27 S/.32,927.12
LINEA DE CONDUCCION RED PRINCIPAL
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE S/.3,271.16 S/.3,271.16
TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.7,448.19 S/.7,448.19
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA, MATERIAL NATURAL COMPACTADO S/.2,358.23 S/.61,314.09 S/.7,074.70 S/.70,747.02
REFINE NIVELACION Y PERFILADO DE FONDO S/.19,928.94 S/.4,982.23 S/.24,911.17
CAMA DE APOYO PARA TUBERIAS h=0.10m TUB. DN=110 MM S/.19,928.94 S/.9,964.47 S/.29,893.41
PRIMER RELLENO CON MATERIAL PROPIO ZARANDEADO S/.4,493.02 S/.1,123.25 S/.5,616.27
RELLENO COMPACTADO CON MATERIAL PROPIO EN TERRENO NORMAL S/.16,459.25 S/.9,529.04 S/.25,988.29
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO E INSTALACIÓN TUBERÍA HDPE DN=110 mm, PN-100 S/.59,488.21 S/.45,490.99 S/.104,979.20
PRUEBA HIDRAULICA LINEA DE CONDUCCION S/.8,595.61 S/.9,823.56 S/.18,419.17
ACCESORIOS VARIOS DE TUBERIA HDPE 100 mm S/.1,299.42 S/.2,244.44 S/.3,543.86
LINEA DE DISTRIBUCION RED SECUNDARIA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL S/.5,000.81 S/.5,000.81
TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.11,386.45 S/.11,386.45
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA, MATERIAL SUELTO S/.25,573.18 S/.63,932.96 S/.89,506.14
REFINE NIVELACION Y PERFILADO DE FONDO S/.2,176.18 S/.27,202.19 S/.8,704.70 S/.38,083.07
CAMA DE APOYO PARA TUBERIAS h=0.10m TUB. DN=90 MM S/.33,513.11 S/.12,186.58 S/.45,699.69
PRIMER RELLENO CON MATERIAL PROPIO ZARANDEADO S/.4,865.37 S/.3,720.58 S/.8,585.95
RELLENO COMPACTADO CON MATERIAL PROPIO EN TERRENO NORMAL S/.12,264.58 S/.21,184.28 S/.33,448.86
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO E INSTALACIÓN TUBERÍA HDPE DN=90 mm, PN-100 S/.55,855.17 S/.27,927.59 S/.83,782.76
PRUEBA HIDRAULICA LINEA DE CONDUCCION S/.14,079.20 S/.14,079.20 S/.28,158.40
ACCESORIOS VARIOS PARA TUBERIAS HDPE 90mm. S/.1,620.74 S/.3,241.47 S/.4,862.21
VALVULA DE PURGA (18.00 UNIDADES)
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE S/.14.04 S/.14.04
TRAZO Y REPLANTEO S/.31.97 S/.31.97
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO NORMAL S/.805.03 S/.805.03
NIVELACION Y COMPACTACIÓN S/.129.17 S/.129.17
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.1,461.24 S/.365.31 S/.1,826.55
CONCRETO SIMPLE
SOLADO C:H 1:10 E=2" S/.11.06 S/.16.60 S/.27.66
CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2 S/.5,918.24 S/.5,918.24
ENCOFRADO Y DESENCOFRADO S/.5,267.35 S/.5,267.35
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.2,785.89 S/.2,785.89
REVOQUES Y ENLUCIDOS
TARRAJEO MEZCLA 1:5; E=1.5CM S/.2,528.06 S/.2,528.06
PINTURA
PINTURA ANTICORROSIVA EN TAPA METALICA S/.487.73 S/.487.73
SUMINISTRO E INSTALACION DE TUBERIAS DE HDPE
TUBERIA HDPE PN -100 D=90 mm. S/.149.15 S/.149.15
VARIOS
MARCO Y TAPA METALICA LAC 2.00mm, C/MECAN. 0.85 X 1.05M S/.4,206.24 S/.4,206.24
ACCESORIOS
VALVULA COMPUERTA DE BRONCE D=3" S/.4,449.60 S/.4,449.60
NIPLE DE F° G° DE 0.10 M X 3" S/.1,189.80 S/.1,189.80
ADAPTADOR MACHO DE HDPE 90 MM S/.2,287.44 S/.2,287.44
UNIÓN UNIVERSAL DE PVC 3" S/.3,119.40 S/.3,119.40
CAJA DE VALVULA DE CONTROL (17.00 UNID)

Página 3
CRONOGRAMA VALORIZADO
PROYECTO: “CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CAPCAS, DISTRITO DE COLCABAMBA, TAYACAJA –
HUANCAVELICA”.
febrero marzo abril mayo junio julio agosto Total
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE S/.13.26 S/.13.26
TRAZO Y REPLANTEO S/.30.19 S/.30.19
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO NORMAL S/.874.35 S/.874.35
NIVELACION Y COMPACTACIÓN S/.121.99 S/.121.99
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.1,819.87 S/.1,819.87
CONCRETO SIMPLE
SOLADO C:H 1:10 E=2" S/.522.44 S/.522.44
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 S/.5,590.21 S/.5,590.21
ENCOFRADO Y DESENCOFRADO S/.4,974.72 S/.4,974.72
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.438.52 S/.2,192.61 S/.2,631.13
REVOQUES Y ENLUCIDOS
TARRAJEO MEZCLA 1:5; E=1.5CM S/.2,387.62 S/.2,387.62
PINTURA
PINTURA ANTICORROSIVA S/.460.71 S/.460.71
INSTALACION DE ACCESORIOS
TAPA METALICA DE 0.85m X1.05m CON PLANCHA ESTRIADA DE 1/8" INC/MARCO S/.2,655.57 S/.2,655.57
ACCESORIOS
VALVULA COMPUERTA DE BRONCE Ø=3" S/.1,873.57 S/.1,873.57
UNIÓN UNIVERSAL DE PVC 3" S/.1,291.66 S/.1,291.66
ADAPTADOR MACHO DE HDPE 90MM S/.2,769.64 S/.2,769.64
NIPLE DE F° G° DE 0.15 M X 3" S/.1,567.06 S/.1,567.06
CRUCE AEREOS
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE S/.5.23 S/.5.23
TRAZO Y REPLANTEO S/.11.90 S/.11.90
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO NORMAL S/.395.81 S/.395.81
NIVELACION Y COMPACTACIÓN S/.27.74 S/.27.74
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.328.68 S/.328.68
CONCRETO SIMPLE
SOLADO C:H 1:10 E=4" S/.165.02 S/.165.02
CONCRETO Fc=175 Kg/cm2 EN CAMARA DE ANCLAJE S/.952.71 S/.952.71
ENCOFRADO Y DESENCOFRADO EN CAMARA DE ANCLAJE S/.554.46 S/.554.46
CONCRETO ARMADO
ZAPATAS
CONCRETO F'C=210 KG/CM2 S/.1,312.13 S/.1,312.13
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.294.83 S/.294.83
COLUMNAS
CONCRETO F'C=210 KG/CM2 S/.473.82 S/.473.82
ENCOFRADO Y DESENCOFRADO S/.650.72 S/.650.72
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.690.93 S/.690.93
REVOQUES Y ENLUCIDOS
TARRAJEO MEZCLA 1:5; E=1.5CM S/.312.31 S/.312.31
PINTURA
PINTURA ESMALTE EN MUROS EXTERIORES S/.195.09 S/.195.09
ACCESORIOS VARIOS
PLATINA EN U 0.12X0.25X3/16" S/.1,425.44 S/.1,425.44
VARILLA DE ANCLAJE DE AºGº de 1" x2.40 m S/.1,591.84 S/.1,591.84
TENSOR OJO GANCHO D=16 mm x 254 mm S/.1,825.28 S/.1,825.28
CABLE PRINCIPAL DE ACERO TIPO BOA DE Ø = 1" S/.1,757.14 S/.1,757.14
PENDOLAS DE ACERO LISO Ø = 3/8" S/.6,067.57 S/.6,067.57
ABRAZADERA PARA TUBO SEGUN DISEÑO Ø = 4" APROX. INC. ACCESORIOS S/.394.16 S/.394.16
GRILLETES DE ACERO EN U DE Ø 1" S/.2,049.32 S/.2,049.32
ACERO LISO Ø = 1" EN CAMARA DE ANCLAJE S/.50.75 S/.50.75
CAMARA ROMPE PRESION

Página 4
CRONOGRAMA VALORIZADO
PROYECTO: “CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CAPCAS, DISTRITO DE COLCABAMBA, TAYACAJA –
HUANCAVELICA”.
febrero marzo abril mayo junio julio agosto Total
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE S/.38.22 S/.38.22
TRAZO Y REPLANTEO S/.87.02 S/.87.02
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO NORMAL S/.1,972.33 S/.1,972.33
NIVELACION Y COMPACTACIÓN S/.202.86 S/.202.86
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.1,637.21 S/.1,637.21
CONCRETO SIMPLE
SOLADO C:H 1:10 E=2" S/.2,495.44 S/.2,495.44
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 S/.17,483.80 S/.6,357.75 S/.23,841.55
ENCOFRADO Y DESENCOFRADO S/.19,319.77 S/.1,379.98 S/.20,699.75
ACERO DE REFUERZO Fy'=4200kg/cm2 S/.7,430.20 S/.7,430.20
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTE S/.9,161.04 S/.9,161.04
TARRAJEO MEZCLA 1:5; E=1.5CM S/.4,171.86 S/.4,171.86
CARPINTERIA METALICA
MARCO Y TAPA METALICA DE 0.75m X0.55m CON PLANCHA ESTRIADA DE 1/8" S/.6,560.82 S/.6,560.82
PINTURA
PINTURA ESMALTE EN MUROS EXTERIORES S/.673.23 S/.1,932.83 S/.2,606.06
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO E INST. DE ACCESORIOS PARA CRP-T7 PARA TUBERIA DE 90 mm. S/.20,170.40 S/.20,170.40
SUMINISTRO E INST. DE ACCESORIOS PARA CRP-T7 PARA TUBERIA DD 110 mm. S/.2,882.24 S/.2,882.24
FLETE TRASLADO DE MATERIALES HASTA CAPCAS
FLETE TERRESTRE LOCAL
FLETE TERRESTRE HASTA CAPCAS S/.24,948.69 S/.24,948.69
FLETE TERRESTRE DE AGREGADOS S/.32,800.00 S/.32,800.00
FLETE TERRESTRE RURAL
TRASLADO DE MATERIALES DESDE EL ALMACEN HASTA EL LUGAR DE TRABAJO S/.6,285.18 S/.10,213.42 S/.10,213.42 S/.10,606.24 S/.9,820.60 S/.392.82 S/.47,531.68
SEGURIDAD Y SALUD
EQUIPO DE PROTECCION INDIVIDUAL S/.8,500.00 S/.8,500.00
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD SALUD DURANTE EL TRABAJO S/.4,500.00 S/.4,500.00
MITIGACION DE IMPACTO AMBIENTA
PLAN DE PARTICIPACION CIUDADANA S/.12,879.70 S/.12,879.70
MEDIDAS DE MITIGACION S/.18,727.78 S/.18,727.78
PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS S/.22,278.40 S/.22,278.40
PROGRAMA DE SEGUIMIENTO Y CONTROL S/.3,759.48 S/.3,759.48
PLAN DE CONTINGENCIA S/.4,734.16 S/.4,734.16
PLAN DE CIERRE O ABANDONO S/.6,126.56 S/.6,126.56
CAPACITACION EN GESTION Y ORGANIZACION DE L AGUA PARA RIEGO
CONFORMACION DE LA JUNTA DE REGANTES S/.6,962.00 S/.6,962.00
CAPACITACION EN FUNCIONES DE LA JUNTA DE REGANTES S/.3,481.00 S/.3,481.00
CAPACITACION EN DERECHOS Y OBLIGACIONES DE LOS USUARIOS S/.9,746.80 S/.9,746.80
ELABORACION DE PLAN DE OPERACION Y MANTENIMIENTO S/.6,962.00 S/.6,962.00
CAPACITACION SOBRE LOS TEMAS DE OPERACION Y MANTENIMIENTO S/.4,873.40 S/.4,873.40
ENTRENAMIENTO EN CAMPO PARA LA EJECUCION DE LAS ACTIVIDADES A IMPLEMENTAR S/.4,873.40 S/.4,873.40
ELABORACION DE PLAN DE SIEMBRA Y PLAN DE RIEGO S/.6,962.00 S/.6,962.00
CAPACIDADES PRODUCTIVAS Y ADECUADOS METODOS DE RIEGO
COMPONENTES DE UN SISTEMA DE RIEGO S/.3,481.00 S/.3,481.00
RIEGO PARCELARIO S/.6,962.00 S/.6,962.00
MANEJO AGRONOMICO DE CULTIVOSRIEGO PARCELARIO S/.3,481.00 S/.3,481.00
MANEJO DE RECURSOS HIDRICOS S/.3,481.00 S/.3,481.00
GASTOS GENERALES (G. Variables, Gastos fijos) S/.17,736.28 S/.19,214.30 S/.19,214.30 S/.19,953.31 S/.18,475.29 S/.19,953.31 S/.114,546.79
UTILIDAD 7% S/.15,286.22 S/.16,560.07 S/.16,560.07 S/.17,196.99 S/.15,923.14 S/.17,196.99 S/.98,723.48
IGV 18% S/.45,251.46 S/.49,022.42 S/.49,022.42 S/.50,907.90 S/.47,136.94 S/.50,907.90 S/.292,249.04
GASTOS DE SUPERVISION S/.11,380.65 S/.12,329.03 S/.12,329.03 S/.12,803.23 S/.11,854.84 S/.12,803.23 S/.73,500.01
ESTUDIO DEFINITIVO S/.10,529.03 S/.11,406.45 S/.11,406.45 S/.11,845.16 S/.10,967.74 S/.11,845.16 S/.67,999.99
Total S/.339,877.53 S/.331,638.07 S/.290,645.80 S/.229,068.49 S/.433,701.87 S/.432,423.03 S/.2,057,354.79