1. ALL DIMENSIONS ARE IN mm. UNLESS OTHERWISE DATE DETAILS SPECIFIED. PROPOSED FIRE FIGHTING SYSTEM UPGRADE AT ONNE TERMINAL 2. ALL DETAILS EXISTING/PROPOSED CONSTRUCTION DRAWN MUHAMMED IBRAHIM 1 13.03.2021 ISSUE FOR REVIEW TO BE CONFIRMED ON SITE. ANY DISCREPANCIES ELIJAH ELIJAH J. CHECKED PIPELINE LAYOUT ARE TO BE REPORTED TO THE ENGINEER IMMEDIATELY APPROVED 3. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL ELIJAH ELIJAH J. OTHER RELEVANT DRAWINGS. DATE APPROVED SIGNATURE MARCH, 2021 SCALE N.T.S SITE ADDRESS ELIJAH ELIJAH J. (HE) COMMENTS ISSUED FOR REVIEW ONNE TERMINAL, ONNE DRAWING No RIVERS STATE AKANJI O.O (H EHS) 20210313-OVHEM_ENG_ONNT_PLN_001 IRENE M.(GH ASPM & T) SHEET No: 1/2