You are on page 1of 1

FORMULIR KEBUTUHAN MATERIAL

PEKERJAAN INTERIOR HR PROSTHETIC CLINIC


KABUPATEN BONE

NO. NAMA BARANG TYPE SATUAN UNIT HARGA SATUAN (RP) JUMLAH (RP)
1 2 4 5 6 7
1 Blockboard Melamin Blockboard 18 mm Melamin 1 sisi Lbr 14 Rp 335,000.00 Rp 4,690,000.00
2 Engsel Engsel Sendok Lurus Hidrolik Psng 34 Rp 19,000.00 Rp 646,000.00
Engsel Sendok Setengah Bungkus Hidrolik Psng 25 Rp 19,000.00 Rp 475,000.00
Rel Double Trek Uk. 40 cm Psng 7 Rp 28,000.00 Rp 196,000.00
3 Mata Gergaji/Pisau Mata Router Lurus Roda 1 cm Bh 3 Rp 75,000.00 Rp 225,000.00
Mata Gergaji T40 Bosch Pcs 1 Rp 160,000.00 Rp 160,000.00
Mata Pisau Cutter Kotak 2 Rp 5,000.00 Rp 10,000.00
4 Lem Lem Korea Botol 3 Rp 7,000.00 Rp 21,000.00
5 Decosit Decosit Putih m 1 Rp 30,000.00 Rp 30,000.00
6 Amplas Amplas 120 m 3 Rp 5,000.00 Rp 15,000.00
7 Thinner Thinner Super 5L Botol 1 Rp 24,000.00 Rp 24,000.00

Rp 6,492,000.00
KETERANGAN CATATAN

Makassar, 25 - November - 2022


Mengetahui
Administrasi Umum Yang Mengajukan
Penanggung Jawab Teknik

(…………………) (Firmansyah Aditama)

You might also like