Item QSB+ PCPA NSA Requirement Criteria of the Requirement Look for
1) Procedures that require supplier audits to support sourcing decisions, evaluation of - is the sourcing decision managed on site ?
their systems. - Links between site and corporate level
Procedures or work instructions to select and 2) Approved supplier list (e.g.: Bidlist) - is there a bidlist ?
SCM1 X X evaluate suppliers. 3) SQ SOR or equivalent, contains all customer requirements, expectations, and - criteria to be sourceable
processes, signed by supplier - list of red suppliers
4) Evidence of SQ responsibility (SQ organization chart or SQ training records) - an example of RFQ
1) Customer specific requirements implemented at tier suppliers - an example of RFQ
2) Evidence of tiered supplier compliance to product and process validation requirements. - technical specifications forwarded to Tier N including list of critical
3) Evidence that final product key/customer characteristics are identified on component characteristic (PCP)
(or material) level as well as shared and controlled (if required with SPC) with tier supplier - Supplier quotation file including technical/process feasibility
4) Process specific audits are performed - Product/process qualification files (PPAP)
5) Tracebility and FIFO requirements implemented at tier suppliers - Audit reports
Customer specific requirements are cascaded
6) Part inspection requirement including Pass Through is established and implemented - example of management on a tier N process change
SCM2 X X to all tier supply chain and deliverables of the
for each supply since design phase and updated in case of non-conformity
tier N are validated/approved by tier 1
7) All the design and process changes communicated, managing change requiremnts
are applied. Tier N supplier production transfer needs to be managed with specific
procedures similar like BTAB
Item QSB+ PCPA NSA Requirement Criteria of the Requirement Look for
1) For single issues, a systematic and disciplined approach to problem solving is - Prior to audit check whether there was any customer complaint
implemented , an Action plan is set up by the tier X and verified by the tier 1, keep due caused by tier supplier.
dates expected by customer - Example of supplier complaints towards its tier 2, verify contents
2) For any delivery of parts with deviation, tier 1 validates the formal deviation request of of the complaints
the tier X complaint. - Is there a timely management with milestones?
An escalation process is applied in case of tier 3) In the event of non-respect of a target, an actions plan to reach it is systematically - Verify content of 5 whys prepared for customer complaint
SCM3 X X X supplier issues defined and followed by the tier X supplier - Example of action plans given by tier 2
4) When a tier supplier moved from Green ranking, escalation process take into account - How is it validated and verified?
the tier 1 support of the tier X supplier to improve. Exit criteria are defined. - Example of supplier audit, evidence of audits at key suppliers
5) Regular audits are performed at suppliers plants. In case of complaint to verify action - Escalation criteria
implemented, and regular audits at key suppliers to improve their system (CQI audits,
process specific audits, PCPA...)
1) An incoming inspection control plan and the related control standards and sampling - Check identification of material released for production after
rules are established for each supplied product. receiving.
2) Incoming inspection is minimum applied at beginning of project to verify tierX controls - Verify that incoming covers key and Pass Through
and key/critical suppliers. characteristics, frequencies are reasonable.
2) Only approved (PPAP and incoming inspection release) components (material) are - See a non-conformance found during incoming.
SCM4 X X X Incoming inspection process in place used for assembled part. - Verify link between incoming frequency and supplier performance
3) At the reception of supplied product the first controls take into account the checking of (high ppm supplier).
the quantity, of the integrity of the packaging and the identification of the product. - Check incoming records for a component
4) Part inspection requirement including Pass Through is established and implemented
for each supply since design phase and updated in case of non-conformity
PR/R's 1
Plant Disruptions
5 4 4 1
4 1
4 1
3 1
3 2 2 1
2 0
2 1 1 0
1 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0
Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06
10,000
PPM's 8,957 Stockouts
1
9,000
1
8,000
1
7,000
6,000 1
1
Report Name: Supplier Activity / Charts PRR Types = Quality | Warranty | Cust. Sat. Data As Of Sep 16 2006
Use a system that manages your suppliers in a similar manner to that used by
GM to manage you