SOCIAL HOMES,INC.

San Lucas, Lipa City, Batangas


ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:

Block Lot Particulars Piece Rate Balance Amount for Billing

TOTAL

Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:

Block Lot Particulars Piece Rate Balance Amount for Billing


TOTAL

Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


DEL ROSARIO, AVEJOY #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

37 25 PAINTING 12,800.00 1,000.00 1,000.00

37 26 PAINTING 12,800.00 500.00 500.00

38 8 PAINTING 14,000.00 - 300.00

38 13 PAINTING 12,800.00 1,300.00 1,500.00

43 32 PAINTING 5,000.00 2,000.00 2,000.00

44 25 PAINTING 6,000.00 3,000.00 3,000.00

TOTAL 8,300.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:

DEL ROSARIO, AVEJOY #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

42 21 PAINTING 6,500.00 4,500.00 1,500.00

42 23 PAINTING 5,000.00 - 2,000.00

42 24 PAINTING 5,000.00 500.00 1,500.00

42 25 PAINTING 5,000.00 500.00 3,500.00

42 26 PAINTING 5,000.00 3,500.00 1,500.00

42 27 PAINTING 5,000.00 500.00 2,500.00

42 28 PAINTING 5,000.00 2,000.00 2,000.00

42 30 PAINTING 6,500.00 2,000.00 2,500.00

42 31 PAINTING 6,500.00 5,000.00 1,500.00

42 33 PAINTING 5,000.00 3,500.00 1,500.00

42 34 PAINTING 5,000.00 4,000.00 1,000.00

42 35 PAINTING 5,000.00 4,000.00 1,000.00

TOTAL 22,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:
Engr. Alfie Lorenzo Atutubo
SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

22 6 INTERIOR TILES 1,400.00 - 1,400.00

38 2 INTERIOR TILES 1,400.00 - 1,400.00

42 21 INTERIOR TILES 1,400.00 - 1,400.00

42 40 INTERIOR TILES 1,400.00 - 1,400.00

TOTAL 5,600.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 2 OPENING RETOUCH 600.00 - 600.00

52 3 OPENING RETOUCH 600.00 - 600.00

52 4 OPENING RETOUCH 600.00 - 600.00

52 5 OPENING RETOUCH 600.00 - 600.00

52 6 OPENING RETOUCH 600.00 - 600.00

52 7 OPENING RETOUCH 600.00 - 600.00

52 8 OPENING RETOUCH 600.00 - 600.00

52 9 OPENING RETOUCH 600.00 - 600.00

TOTAL 4,800.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:
Engr. Alfie Lorenzo Atutubo
SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:

Block Lot Particulars Piece Rate Balance Amount for Billing

TOTAL
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 21 T&B CHB LAYING 1,000.00 - 1,000.00

52 22 T&B CHB LAYING 1,000.00 - 1,000.00

52 23 T&B CHB LAYING 1,000.00 - 1,000.00

52 24 T&B CHB LAYING 1,000.00 - 1,000.00

52 25 T&B CHB LAYING 1,000.00 - 1,000.00

TOTAL 5,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


MARQUEZ, BOYET #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

43 25 SEPTIC TANK 650.00 - 650.00

43 26 SEPTIC TANK 650.00 - 650.00

43 27 SEPTIC TANK 650.00 - 650.00

43 28 SEPTIC TANK 650.00 - 650.00

TOTAL 2,600.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


PANES, ALFREDO JR. #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 67 CEILING INSTALLATION 2,300.00 800.00 1,500.00

52 68 CEILING INSTALLATION 2,300.00 800.00 1,500.00

52 69 CEILING INSTALLATION 2,300.00 800.00 1,500.00

52 70 CEILING INSTALLATION 2,300.00 300.00 1,000.00

52 71 CEILING INSTALLATION 2,300.00 300.00 1,000.00

52 72 CEILING INSTALLATION 2,300.00 300.00 1,000.00

52 73 CEILING INSTALLATION 2,300.00 300.00 1,000.00

52 74 CEILING INSTALLATION 2,300.00 300.00 1,000.00

52 75 CEILING INSTALLATION 2,300.00 300.00 1,000.00

52 76 CEILING INSTALLATION 2,500.00 300.00 1,000.00

TOTAL 11,500.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:
Engr. Alfie Lorenzo Atutubo
SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


MARQUEZ, BOYET #2022 - 39 SEPT. 29, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 64 ROOFING INSTALLATION 1,050.00 250.00 800.00

52 65 ROOFING INSTALLATION 950.00 250.00 700.00

52 66 ROOFING INSTALLATION 950.00 - 250.00

52 67 ROOFING INSTALLATION 950.00 - 250.00

52 68 ROOFING INSTALLATION 950.00 - 250.00

52 69 ROOFING INSTALLATION 950.00 - 250.00

52 70 ROOFING INSTALLATION 950.00 - 250.00

52 71 ROOFING INSTALLATION 950.00 - 250.00

52 72 ROOFING INSTALLATION 950.00 - 250.00

52 73 ROOFING INSTALLATION 950.00 - 250.00

52 74 ROOFING INSTALLATION 950.00 - 250.00

52 75 ROOFING INSTALLATION 950.00 - 250.00

52 76 ROOFING INSTALLATION 1,050.00 - 250.00

TOTAL 4,250.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:

Block Lot Particulars Piece Rate Balance Amount for Billing

TOTAL
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


ABARRERA, NESTOR #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 64 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 65 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 66 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 67 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 68 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 64 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

52 65 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

52 66 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

52 67 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

52 68 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

TOTAL 15,500.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:

ABARRERA, NESTOR #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 67 LOFT FRAMING RETENTION 500.00 - 500.00

52 68 LOFT FRAMING RETENTION 500.00 - 500.00

52 69 LOFT FRAMING RETENTION 500.00 - 500.00

52 70 LOFT FRAMING RETENTION 500.00 - 500.00


TOTAL 2,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:
Engr. Alfie Lorenzo Atutubo
SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 40 OCT. 06, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 10 OPENING RETOUCH 600.00 - 600.00

52 11 OPENING RETOUCH 600.00 - 600.00

52 12 OPENING RETOUCH 600.00 - 600.00

52 13 OPENING RETOUCH 800.00 - 800.00

52 14 OPENING RETOUCH 800.00 - 800.00

52 15 OPENING RETOUCH 600.00 - 600.00

52 16 OPENING RETOUCH 600.00 - 600.00

52 17 OPENING RETOUCH 600.00 - 600.00

52 18 OPENING RETOUCH 600.00 - 600.00

TOTAL 5,800.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 40 OCT. 06, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 1 T&B CHB LAYING 1,000.00 - 1,000.00

52 2 T&B CHB LAYING 1,000.00 - 1,000.00

52 3 T&B CHB LAYING 1,000.00 - 1,000.00

52 4 T&B CHB LAYING 1,000.00 - 1,000.00

52 5 T&B CHB LAYING 1,000.00 - 1,000.00

52 6 T&B CHB LAYING 1,000.00 - 1,000.00

52 7 T&B CHB LAYING 1,000.00 - 1,000.00


52 8 T&B CHB LAYING 1,000.00 - 1,000.00

52 9 T&B CHB LAYING 1,000.00 - 1,000.00

TOTAL 9,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 40 OCT. 06, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 26 T&B CHB LAYING 1,000.00 - 1,000.00

52 27 T&B CHB LAYING 1,000.00 - 1,000.00

52 28 T&B CHB LAYING 1,000.00 - 1,000.00

52 29 T&B CHB LAYING 1,000.00 - 1,000.00

38 16 PAINTING 14,000.00 10,000.00 4,000.00

TOTAL 8,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

43 31 INTERIOR TILES 1,400.00 1,400.00

43 34 INTERIOR TILES 1,400.00 - 1,400.00

43 35 INTERIOR TILES 1,400.00 - 1,400.00

43 38 INTERIOR TILES 1,400.00 - 1,400.00

43 39 INTERIOR TILES 1,400.00 - 1,400.00

42 38 INTERIOR TILES 1,400.00 - 1,400.00

42 35 INTERIOR TILES 1,400.00 - 1,400.00


42 33 INTERIOR TILES 1,400.00 - 1,400.00

37 3 CR TILES 900.00 - 900.00

TOTAL 12,100.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


PANES, ALFREDO JR. #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 67 CEILING INSTALLATION 2,300.00 - 800.00

52 68 CEILING INSTALLATION 2,300.00 - 800.00

52 69 CEILING INSTALLATION 2,300.00 - 800.00

52 70 CEILING INSTALLATION 2,300.00 - 300.00

52 71 CEILING INSTALLATION 2,300.00 - 300.00

52 72 CEILING INSTALLATION 2,300.00 - 300.00

52 73 CEILING INSTALLATION 2,300.00 - 300.00

52 74 CEILING INSTALLATION 2,300.00 - 300.00

52 75 CEILING INSTALLATION 2,300.00 - 300.00

52 76 CEILING INSTALLATION 2,500.00 - 300.00

TOTAL 4,500.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


PANES, ALFREDO JR. #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

51 72 CEILING INSTALLATION 2,300.00 - 200.00

51 73 CEILING INSTALLATION 2,300.00 - 200.00

51 74 CEILING INSTALLATION 2,300.00 - 200.00

51 75 CEILING INSTALLATION 2,300.00 - 200.00

51 76 CEILING INSTALLATION 2,300.00 - 200.00

51 77 CEILING INSTALLATION 2,300.00 - 200.00

51 78 CEILING INSTALLATION 2,300.00 - 200.00


44 25 CEILING INSTALLATION 500.00 - 500.00

TOTAL 1,900.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


MARQUEZ, BOYET #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 1 ROOFING INSTALLATION 1,050.00 350.00 700.00

52 2 ROOFING INSTALLATION 950.00 350.00 600.00

52 3 ROOFING INSTALLATION 950.00 350.00 600.00

52 4 ROOFING INSTALLATION 950.00 350.00 600.00

52 5 ROOFING INSTALLATION 950.00 350.00 600.00

52 6 ROOFING INSTALLATION 950.00 350.00 600.00

52 7 ROOFING INSTALLATION 950.00 350.00 600.00

52 8 ROOFING INSTALLATION 950.00 350.00 600.00

52 9 ROOFING INSTALLATION 950.00 350.00 600.00

52 10 ROOFING INSTALLATION 950.00 350.00 600.00

52 11 ROOFING INSTALLATION 950.00 350.00 600.00

52 12 ROOFING INSTALLATION 950.00 350.00 600.00

52 13 ROOFING INSTALLATION 1,050.00 350.00 700.00

TOTAL 8,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


MARQUEZ, BOYET #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 11 ROOF FRAMING 1,050.00 - 1,050.00

52 12 ROOF FRAMING 1,050.00 - 1,050.00

52 13 ROOF FRAMING 1,100.00 - 1,100.00


TOTAL 3,200.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


MARQUEZ, BOYET #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 14 C-PURLINS PAINTING 85.00 - 85.00

52 15 C-PURLINS PAINTING 60.00 - 60.00

52 16 C-PURLINS PAINTING 60.00 - 60.00

52 17 C-PURLINS PAINTING 60.00 - 60.00

52 18 C-PURLINS PAINTING 60.00 - 60.00

52 19 C-PURLINS PAINTING 60.00 - 60.00

52 20 C-PURLINS PAINTING 60.00 - 60.00

52 21 C-PURLINS PAINTING 60.00 - 60.00

52 22 C-PURLINS PAINTING 60.00 - 60.00

52 23 C-PURLINS PAINTING 60.00 - 60.00

52 24 C-PURLINS PAINTING 60.00 - 60.00

52 25 C-PURLINS PAINTING 60.00 - 60.00

TOTAL 745.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


DEL ROSARIO, AVEJOY #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

42 21 PAINTING 6,500.00 3,000.00 1,500.00

42 26 PAINTING 5,000.00 500.00 3,000.00

42 30 PAINTING 6,500.00 1,000.00 1,000.00

42 31 PAINTING 6,500.00 3,000.00 2,000.00

42 33 PAINTING 5,000.00 1,000.00 2,500.00

42 34 PAINTING 5,000.00 3,000.00 1,000.00

42 35 PAINTING 5,000.00 3,000.00 1,000.00

42 38 PAINTING 5,000.00 4,000.00 1,000.00

42 40 PAINTING 6,500.00 4,000.00 2,500.00

44 25 PAINTING 6,000.00 - 3,000.00


TOTAL 18,500.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


DEL ROSARIO, AVEJOY #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

43 32 PAINTING 6,000.00 500.00 1,500.00

43 34 PAINTING 6,000.00 4,000.00 2,000.00

43 38 PAINTING 6,000.00 4,500.00 1,500.00

43 39 PAINTING 6,000.00 3,000.00 3,000.00

TOTAL 8,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


ABARRERA, NESTOR #2022 - 40 OCT. 6, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing


TOTAL -
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


ABARRERA, NESTOR #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 1 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 2 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 3 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 4 LOFT FRAMING INSTALLATION 2,700.00 500.00 2,200.00

52 1 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

52 2 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

52 3 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

52 4 LOFT FLOORING INSTALLATION 1,100.00 200.00 900.00

TOTAL 12,400.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:

ABARRERA, NESTOR #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 71 LOFT FRAMING RETENTION 500.00 - 500.00

52 72 LOFT FRAMING RETENTION 500.00 - 500.00

52 73 LOFT FRAMING RETENTION 500.00 - 500.00

52 74 LOFT FRAMING RETENTION 500.00 - 500.00

52 75 LOFT FRAMING RETENTION 500.00 - 500.00

52 76 LOFT FRAMING RETENTION 500.00 - 500.00

TOTAL 3,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon

Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 19 OPENING RETOUCH 600.00 - 600.00

52 20 OPENING RETOUCH 600.00 - 600.00

52 21 OPENING RETOUCH 600.00 - 600.00

52 22 OPENING RETOUCH 600.00 - 600.00

52 23 OPENING RETOUCH 600.00 - 600.00

52 24 OPENING RETOUCH 600.00 - 600.00

52 25 OPENING RETOUCH 800.00 - 800.00

52 26 OPENING RETOUCH 800.00 - 800.00

52 27 OPENING RETOUCH 600.00 - 600.00

52 28 OPENING RETOUCH 600.00 - 600.00

TOTAL 6,400.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 30 T&B CHB LAYING 1,000.00 - 1,000.00

52 31 T&B CHB LAYING 1,000.00 - 1,000.00

52 32 T&B CHB LAYING 1,000.00 - 1,000.00

38 16 PAINTING 14,000.00 3,000.00 7,000.00

TOTAL 10,000.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


FLORES, DENNIS #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

43 21 INTERIOR TILES 1,400.00 - 1,400.00

43 23 INTERIOR TILES 1,400.00 - 1,400.00

43 24 INTERIOR TILES 1,400.00 - 1,400.00

43 26 INTERIOR TILES 1,400.00 - 1,400.00

43 33 INTERIOR TILES 1,400.00 - 1,400.00

42 31 INTERIOR TILES 1,400.00 - 1,400.00

42 34 INTERIOR TILES 1,400.00 - 1,400.00

TOTAL 9,800.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


PANES, ALFREDO JR. #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 4 Ceiling Installation 2,300.00 1,400.00 900.00

52 5 Ceiling Installation 2,300.00 1,400.00 900.00

52 6 Ceiling Installation 2,300.00 1,400.00 900.00

52 7 Ceiling Installation 2,300.00 1,400.00 900.00

52 8 Ceiling Installation 2,300.00 1,400.00 900.00

52 9 Ceiling Installation 2,300.00 1,400.00 900.00

52 10 Ceiling Installation 2,300.00 1,400.00 900.00

52 11 Ceiling Installation 2,300.00 1,400.00 900.00

52 12 Ceiling Installation 2,300.00 1,400.00 900.00

52 13 Ceiling Installation 2,500.00 1,500.00 1,000.00

TOTAL 9,100.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


MARQUEZ, BOYET #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 64 Roofing Installation Retention 1,050.00 - 250.00

52 65 Roofing Installation Retention 900.00 - 250.00

52 1 Roofing Installation Retention 1,050.00 - 350.00

52 2 Roofing Installation Retention 900.00 - 350.00

52 3 Roofing Installation Retention 900.00 - 350.00

52 4 Roofing Installation Retention 900.00 - 350.00

52 5 Roofing Installation Retention 900.00 - 350.00

52 6 Roofing Installation Retention 900.00 - 350.00

52 7 Roofing Installation Retention 900.00 - 350.00

52 8 Roofing Installation Retention 900.00 - 350.00

52 9 Roofing Installation Retention 900.00 - 350.00

52 10 Roofing Installation Retention 900.00 - 350.00

52 11 Roofing Installation Retention 900.00 - 350.00

52 12 Roofing Installation Retention 900.00 - 350.00

52 13 Roofing Installation Retention 1,050.00 - 350.00

TOTAL 5,050.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo

SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


MARQUEZ, BOYET #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

52 14 Roof Framing Installation 1,100.00 450.00 650.00

52 15 Roof Framing Installation 1,050.00 450.00 600.00

52 16 Roof Framing Installation 1,050.00 450.00 600.00

52 17 Roof Framing Installation 1,050.00 450.00 600.00

52 18 Roof Framing Installation 1,050.00 450.00 450.00

52 19 Roof Framing Installation 1,050.00 450.00 600.00

52 20 Roof Framing Installation 1,050.00 450.00 600.00

52 21 Roof Framing Installation 1,050.00 450.00 600.00

4,850.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo


SOCIAL HOMES,INC.
San Lucas, Lipa City, Batangas
ACCOMPLISHMENT REPORTS/BILLING

Name of Sub. Contractor: Period Covered: Date:


DEL ROSARIO, AVEJOY #2022 - 41 OCT. 13, 2022

Block Lot Particulars Piece Rate Balance Amount for Billing

38 13 Painting 12,000.00 - 500.00

37 18 Painting 12,000.00 - 6,000.00

42 21 Painting 6,500.00 1,000.00 2,000.00

42 24 Painting 5,000.00 - 500.00

42 25 Painting 5,000.00 - 500.00

42 26 Painting 5,000.00 - 500.00

42 28 Painting 5,000.00 500.00 1,500.00

42 30 Painting 6,500.00 500.00 500.00

42 31 Painting 6,500.00 1,000.00 2,000.00

42 33 Painting 5,000.00 500.00 500.00

42 34 Painting 5,000.00 1,000.00 2,000.00

43 31 Painting 6,500.00 4,000.00 2,500.00

43 32 Painting 6,000.00 - 500.00

43 33 Painting 6,000.00 4,000.00 2,000.00

43 34 Painting 6,000.00 1,000.00 3,000.00

43 35 Painting 6,000.00 4,000.00 2,000.00

43 26 Painting 6,000.00 4,500.00 1,500.00

43 27 Painting 6,000.00 4,500.00 1,500.00

42 38 Painting 5,000.00 1,000.00 3,000.00

TOTAL 32,500.00
Prepared by: Checked/Inspected by:

Engr. Albert Olit Engr. John Christian De Leon


Approved by:

Engr. Alfie Lorenzo Atutubo