PACKAGING
MasterFlow 980 is supplied in 25kg bags.
MasterFlow® 980
PLACING / APPLICATION TYPICAL WATER REQUIREMENTS
Lengths of metal strapping laid in the formwork
prior to placing may be necessary to assist grout Consistency mix water litres / 25kg
flow over large areas and in compacting and Fluid 3.5
eliminating air pockets. Pour the grout
continuously. Maintain a constant hydrostatic STRENGTH DEVELOPMENT
head, of at least 15 cm.
The strength of grout is dependent on many
factors which include mixing, water addition,
On the side where the grout is to be poured, allow
curing, temperature and humidity. The table below
10 cm clearance between the side of the form and
gives typical average strengths of MasterFlow 980
the base plate of the machine.
at 25°C, when mixed with 3.5 litres (fluid) per 25kg
bag.
On the opposite side allow at least 10cm clearance
between the formwork and the base plate to allow
Compressive Flexural
the grout to flow through without entrapping air.
Strength Strength
MasterFlow grouts are suitable for use with most
types of pumping equipment. Time Fluid N/mm² Fluid N/mm²
Immediately after placing MasterFlow 980 grout, 1 day 25 -
cover all exposed grout with clean damp hessian 3 days 35 -
and keep moist until grout is firm enough to accept 7 days 45 -
a curing membrane. We recommend the use of a 28 days >60 10
curing membrane from our MasterKure range.
Wet density : approx. 2270kg/m³
The larger size aggregate of MasterFlow 980
permits precision grouting of thicknesses >80mm BLEED WATER
when used for applications between bedplate and No bleed water is apparent (ASTM C-232) at
foundations. recommended water addition rates.
MBS_CC-UAE/Fl_980_02_95/v5/11_16/v6/05_18
The technical information and application advice given in this Master Builders Solutions publication are based on
STATEMENT OF the present state of our best scientific and practical knowledge. As the information herein is of a general nature, no
RESPONSIBILITY assumption can be made as to a product's suitability for a particular use or application and no warranty as to its
accuracy, reliability or completeness either expressed or implied is given other than those required by law. The user
is responsible for checking the suitability of products for their intended use.
Field service where provided does not constitute supervisory responsibility. Suggestions made by Master Builders
NOTE Solutions either orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since
they, and not Master Builders Solutions, are responsible for carrying out procedures appropriate to a specific
application.