Fluctuations and Ommited Item
Fluctuations and Ommited Item
FOR
Excavation
Starting from strip level; not exceeding 1.5 deep
Trenches
B 28 M3 550.00 15,400
Pits
C 3 M3 600.00 1800.00
Disposal
D 48 M3 200.00 9,600.00
Excavated materials; backfilling
E 32 M3 200.00 6,400.00
Surplus excavated material; removing from
site
To collection
460,490
A Bases; 300mm thick 2 M3 29,000 58,000
Element Nr 1 – substructure
Carried to summary N 1,978,590
SUPERSTRUCTURE
Frame
In-situ concrete: reinforced normal
Mix (1:2:4 – 20mm) aggregate
Frame
Carried to summary N169,600.00
Reinforcement
High tensile reinforcement to 4449
including bens & hooks
B 16 – 8mm diameter
Formwork to reinforced in-situ
concrete 142 Kg 500 71,000
fromwork generally
To collection N 1,229,800
Structural timber: hardwood: treated with soligums as Described
Item Description Qty Unit Rate Amount
A Raffters:150x150 215 M 450 96,750
To collection N 414,600
COLLECTION
Page 2/5 1,229,800
Page 2/6 414,600
Roof
Carried to summary N1,644,400
DOORS
Finishing
Mortar; cement and sand (1:3); steel trowelled
13mm work; to concrete or block work base;
over 300mm wide
Walls 285
M2 850.00 242,250
850.00 148,750
A Walls; external 175 M2
B
Ceramic tile facing: BS 1281; White glazed:
egg-shell finish: to regular pattern: fixing with
adhesive: grouting with white cement
150 x 150 x 6mm; 3mm joints; straight both ways; 90 M2 2,600 234,000
to walls; to cement and sand base; over 300mm
C wide
25mm
G 164 M2 800.00 131,200.00
Floor Finishes
Carried to summary N 504,100.00
95 M2 2300.00 218,500.00
Ceilings
Builder’s Work
Allowed a provisional sum of N20,000 in
B connection with the Elec. Installation
- 20,000.00
Sum
Allow a provisional sum of N350,000 for
electrical works 350,000.00
C