SSTUDI POTENSI BENCANA KEBUMIAN (GEMPABUMI, TSUNAMI, DAN LIKUIFAKSI) PADA INFRASTRUKTUR KETENAGALISTRIKAN MILIK PT
PLN (PERSERO) DI LOKASI TERSEBAR
Skenario H12 Skenario H13 Skenario H14 Skenario H15 Skenario H16
Segmen Gempa Lombok 5/8/2018 Lombok 19/8/2018 Padang 2009 Seram 1998
Maluku 2014
Seg. 1 Seg.2 Seg. 3 Seg. 1 Seg.2 Seg. 3 Seg. 1 Seg.2 Seg. 3 Seg. 1 Seg.2 Seg. 3
Referensi (Salman dkk., 2020) (Salman dkk., 2020) (Gunawan dkk., 2016) (Hayes, 2017) (Hayes, 2017)
Kedalaman (km) 7,750 15,450 20,950 10,320 16,550 21,530 23,130 59,400 78,000 96,600 6,900 20,500 34,100
Panjang (km) 52,920 52,920 52,920 42,940 42,940 42,940 200,000 65,000 65,000 65,000 168,000 168,000 168,000
Lebar (km) 21,490 21,490 9,210 14,740 14,740 8,850 40,000 25,000 25,000 25,000 15,000 15,000 15,000
Strike (°) 80,000 80,000 80,000 95,720 95,720 95,720 200,000 71,340 71,340 71,340 196,000 196,000 196,000
Dip (°) 21,000 21,000 21,000 25,000 25,000 25,000 65,000 53,500 53,500 53,500 65,000 65,000 65,000
Rake (°) 73,240 72,880 63,220 101,200 90,050 52,110 75,000 145,960 140,790 142,790 -149,220 -154,510 -153,970
Lat. Episenter (°) -8,178 -8,357 -8,485 -8,211 -8,331 -8,427 1,510 -0,692 -0,810 -0,927 -2,077 -2,061 -2,045
Long. Episenter (°) 116,289 116,320 116,343 116,756 116,744 116,734 126,374 99,863 99,903 99,943 124,914 124,859 124,804
Slip (m) 0,306 0,392 0,016 0,343 0,807 0,306 0,183 0,044 1,511 0,467 2,321 1,069 0,803
PLTMG Minahasa,
Aset PLN yang PLTU Lombok PLTU Lombok PLTMG Mobile PP (Sofifi) 10 PLTMG Nias, PLTU Teluk Sirih PLTMG Ambon Peaker
Berpotensi Terdampak
MW, PLTMG Halmahera
Tabel 5 Skenario pembangkit tsunami historis (Bagian 5)