PELATIHAN SERTIFIKASI PROFESI

PERENCANAAN PRODUKSI

PROGRAM STUDI TEKNIK INDUSTRI


UNIVERSITAS GUNADARMA
PELATIHAN SERTIFIKASI PROFESI
MODUL PERENCANAAN PRODUKSI

Sesi 1
Teori mengenai Perencanaan Kapasitas Produksi, Penyesuaian Kapasitas
Produksi, dan Merencanakan Kebutuhan Material (4 jam)
SESI 2
Praktik menyusun perencanaan kapasitas produksi (4 jam)
SESI 3
Praktik menyusun penyesuaian kapasitas produksi (4 jam)
SESI 4
Praktik menyusun perencanaan kebutuhan material (4 jam)

SESI 5
Ujian (2 jam)
MENGANALISIS KAPASITAS
PRODUKSI
(M.702092.009.01)
Production Capacity

• A plant might be operating in a single shift or two shifts; or some


plants ma even work round the clock for three shifts also.
• In this case we consider only the case of those plants that operate in
a single shift and may work overtime if necessary.
• The production capacity is specified as the number of units than can
be produced in a single shift during regular time.
PRODUCTION PLANS: LEVEL PLAN

The number of units produced in each month is


constant at a chosen level.
PRODUCTION PLAN = JUMLAH
PERAMALAN DIBAGI JUMLAH
PERIODE  (5520/12=460)

JUMLAH PRODUKSI KONSTAN (SAMA)


SETIAP PERIODENYA

INVENTORY = CUMULATIVE
PRODUCTION – CUMULATIVE
DEMAND  (460-210=250)

HASIL DARI PERAMALAN SETIAP


PERIODENYA
TERIMAKASIH