GD PREVENTIVE MAINTENANCE CHECK LIST. |
OF AMS? ULSD RETONSE 6 - MONTHLY Revision
Date
MAINTENANCE DEPT PIPE LIQUID, VAPOR LPG, PMK, UTILITY Location All Area TLB
sian: lower 92>
No DESCRIPTION STATUS/KONDISI
T_|Pemeriksa Baut Pengiat Flange ere et
2 |Pemeriksean Kabel Bonding Ch TER SAM UR
3_|Pemeriksaan Pipa dari Karat Oe
4 [Pemeriksaan Kelurusan Pipa Oe
'5_|Pemeriksan Pemasangan U - Bolt Oe
6 [Pemeriksa Kebocoran Pipa/Flange oe Aro Gocor
MARK:
Regards Approved By
Mr
Mohamad Solin
Mechanic Technisian Maintenance SuperintendentPa Tiofl
iF &» PREVENTIVE MAINTENANCE CHECK LIST |=
or sy min Pema 6 - MONTHLY Revision <0
Date
MAINTENANCE DEPT PIPE LIQUID, VAPOR LPG, PMK, UTILITY Location All Area TLB
BULAN fuer ga
=
NO DESCRIPTION ‘STATUS/KONDIS!
1_|Pemeriksa Saut Pengikat Flange on. (eens
2__|[Pemeriksaan Kabel Bonding O® TER Samgury »
3_|Pemeriksaan Pipa dari Karat oe.
4 [Pemeriisaan Kelurusen Pipa oe
5 |Pemeriksan Pernasangan U- Bolt OK
6 _|Pemeriksa Kebocoran Pipa/Flange oe
MARK:
Regards Approved By
¢ ete :
Msp)
Mohamad Solin NadiMduryone.
|___mechanicTechnisian Maintenance Superintendent[rue dof
ED P PREVENTIVE MAINTENANCE CHECK LIST |--=—
7 ms mich RETRONL 6 - MONTHLY REPORT Revision _:0
Date
MAINTENANCE DEPT BALL VALVE Location All Area TLE
euuw: onic, 90
No
DESCRIPTION
STATUS/KONDISI
[Sanbungan Flanges
|Pemeriksaan Kekencangan Baut (Body/Cover,
2_[Periksa terhadap Karat dan Kerus
fan Body/ retak
3 |Pastikan Valve masin berfungsi dengan baik, Valve
harus masih bisa di fungsikan full -Open/ Full - Close
@ |Pemeriksaan kondisi grease dan Regreasing
pie
‘Mohamad Solihin
Mechanic Technisian
‘Approved By
Mi (
Hadi Muryono—
Maintenance SuperintendentPage s1of1
PREVENTIVE MAINTENANCE CHECK LIST = ie
6 - MONTHLY REPORT Revision oO
Date
MAINTENANCE DEPT BALL VALVES ____[Tocation —aarea 708
sun: fur
No DESCRIPTION STATUS/KONDISI
1 Pemeriksaan Kekencangan Baut (Body/Cover, i
Sanbungan Flanges ote
[Periksa terhadap Karat dan Kerusakan Body/ retak oe
5 [Pastikan Valve mas berfungsi dengan bak, Valve fe
|harus masih bisa di fungsikan full - Open/ Full - Close 7
@ |Pemeriksaan kondisi grease dan Regreasing Oe
MARK : PEPE EEeEeE Eee PEE EEEEEEE
Regards Approved By
Micnhony
Mohamad Solhin ‘Paieetoryorto
Mechanic Technisian
Maintenance SuperintendentPe lof
EY PREVENTIVE MAINTENANCE CHECK LIST. |-= 4
2
‘pr msi mun nemonust 6-MONTHLY REPORT Revision :0
te:
| TWIAINTENANCE DEPT. Bee Location :AlAreaTiB _|
BULAN: <_puweres gr. |
NO! DESCRIPTION: STATUS/KONDIS!
7 [Pemerksaan Kekencangan Gaut (Body/Cover, Samibungan Cp. AUB RR Ra
Flanges _
T [Perse terhadap Karat atau Kerusaken Gody oe
3 [Kabel Bonding Obs
MARK
— Pale Mee teeut {hart «
Regards Approved By
5 haan
Mohamad Sothin HadeMorvone-
Mechanic Technisian Maintenance SuperintendertPage lof
cy PREVENTIVE MAINTENANCE CHECK LIST ~ a +
pre min remus 6-MONTHLY REPORT sonia 19
ate
MAINTENANCE DEPT FLANGE ‘Location _: Al Area TL.
sun: fuer
No DESCRIPTION
STATUS/KONDIS!
|Pemeriksaan Kekencangan Baut (Body/Cover, Sambungan Oe
Flanges
2 [Periksa terhadap Karat atau Kerusakan Body
3 [Kabel Bonding
har ria leet
Regards
Heto-f
Mohamad Solihin
Mechanic Technisian
Approved By
Murod j
Hadi Muryeno
Maintenance Superintendent.Pa Toft
PREVENTIVE MAINTENANCE CHECK LIST. pO =
ocNO
‘20 MTR OGRE 6-MONTHLY REPORT Revision _:0
Date:
MAINTENANCE DEPT GATE VALVE Location All Area TLE
eee «Janu ADs
NO. DESCRIPTION STATUS/KONDISI
Pemeriksaan Kekencangan Baut (Body/Cover, Sambungan
» Frlanges Oe .
2_|Periksa terhadap Karat dan Kerusakan Body/ retak OK.
3 Pastikan Gate Valve masih berfungsi dengan baik, Valve
|harus masih bisa di fungsikan full - Open/ Full - Close Oe
4 _|Pemeriksaan kondisi grease dan Regreasing OK
ARK:
Regards Approved By
Spree
Merve
Mohamad Solthin HadeMoryono
Maintenance SuperintendentZ
GD PREVENTIVE MAINTENANCE CHECK LIST. | “=E-—
27 SY AR RETOUR 6-MONTHLY REPORT Revision
Date
MAINTENANCE DEPT GATE VALVE Location All Area TLB
BULAN: dud Qu
NO DESCRIPTION STATUS/KONDISI
emaritzzan Kekancangan Baut (Body/Cover, Sambungan
Flanges
2. |Periksa terhadap Karat dan Kerusakan Body/ retak
Pastikan Gate Valve masih berfungsi dengan baik, Valve
harus masih bisa di fungsikan full -Open/ Full Close
@_|Pemeriksaan kondisi grease dan Regreasing
MARK
Mohamad Sol
‘Mechanic Technisian